Thames Water Desalination Plant

The first water desalination plant in the United Kingdom, the Thames Water Desalination Plant,[1] or Beckton Desalination Plant, has been built in Beckton, east London for Thames Water by a consortium of Interserve, Atkins Water and Spanish firm Acciona Agua[2] and was opened by HRH Duke of Edinburgh on 2 June 2010. It is the first plant of its kind to be built in the UK and will provide up to 150 million litres of drinking water each day – enough for nearly one million people – making the prospect of future water restrictions less likely.[3][4]

Background

Much of Thames Water's supply area is classed by the Environment Agency as 'seriously water stressed', with customers in London, Swindon and Oxford particularly at risk of water restrictions during extended periods of dry weather. Building a new treatment plant that treats water from the brackish waters of the River Thames, turning into clean, fresh drinking water, will help reduce the risk of water restrictions and ensure that severe water rationing is never required.[5] The plant will be used to convert brackish water from the River Thames into clean drinking water during times of drought or extended periods of low rainfall,[6] or to maintain supplies in the event of an incident at other water treatment facilities. Architects Broadway Malyan designed the plan to RIBA Stage D and acted as expert witness at public enquiry.

Facts and figures

Criticism

Former London Mayor Ken Livingstone criticised the plant in 2007, calling it a "misguided and a retrograde step in UK environmental policy." Livingstone, arguing that the plant was expensive and unnecessary, said that Thames Water should instead focus on reducing waste caused by leakage and that people should be encouraged "to use less water, not more."[7]

References

  1. Thames Water Desalination Plant: water-technology.net
  2. Interserve group to build £200m Thames Gateway water scheme Building Magazine 9 July 2009 Retrieved 2 April 2013
  3. Thames Water website - Then and now
  4. "UK gets first desalination plant", BBC News, July 18, 2007.
  5. 5.0 5.1 "How the treatment works operates". Thames Water. Retrieved 22 June 2014.
  6. Scott, M. (2012). "Increasing population and the environment: How do the numbers stack up?". Significance 9: 8. doi:10.1111/j.1740-9713.2012.00536.x.
  7. "Mayor critical of government plans to approve desalination plant", Greater London Authority press release, June 15, 2007.

Coordinates: 51°30′56″N 0°05′34″E / 51.51554°N 0.09278°E