South African Class 6E1, Series 2

South African Class 6E1, Series 2

No. E1252 at Sentrarand, Gauteng, 29 September 2009
Type and origin
Power type Electric
Designer Union Carriage and Wagon
Builder Union Carriage and Wagon
Model UCW 6E1
Build date 1971
Total produced 50
Specifications
UIC classification Bo-Bo
Gauge 3 ft 6 in (1,067 mm) Cape gauge
Bogies 3.430 m (11 ft 3 in) wheelbase
Wheel diameter 1,220 mm (48 in)
Wheelbase 11.279 m (37 ft 0.1 in)
Length 15.494 m (50 ft 10 in)
Width 2.896 m (9 ft 6 in)
Height 4.089 m (13 ft 5 in) pantographs down
Axle load 22,226 kg (21.9 long tons)
Locomotive weight 88,904 kg (87.5 long tons)
Current collection
method
Pantographs
Traction motors Four AEI 283 AZ
Transmission 18/67 gear ratio
Performance figures
Maximum speed 113 km/h (70 mph)
Power output Per motor:
623 kW (835 hp) 1 hour
563 kW (755 hp) continuous
Total:
2,492 kW (3,342 hp) 1 hour
2,252 kW (3,020 hp) continuous
Tractive effort 311 kN (70,000 lbf) starting
221 kN (50,000 lbf) 1 hour
193 kN (43,000 lbf) continuous at 40 km/h (25 mph)
Locomotive brake Air & Regenerative
Train brakes Air & Vacuum
Career
Operator(s) South African Railways
Spoornet
Transnet Freight Rail
Class Class 6E1
Power class 3 kV DC
Number in class 50
Number(s) E1246-E1295 [1]
Delivered 1971
First run 1971

The South African Class 6E1, Series 2 of 1971 is a South African electric locomotive from the South African Railways era.

In 1971 the South African Railways placed fifty Class 6E1, Series 2 electric locomotives with a Bo-Bo wheel arrangement in mainline service. Series 2 was the first of the Class 6E1s to have their sandboxes mounted along the bottom edge of the locomotive body sides.[1]

Manufacturer

The 3 kV DC Class 6E1, Series 2 electric locomotive was designed and built for the South African Railways (SAR) in 1971 by Union Carriage and Wagon (UCW) in Nigel, Transvaal, with the electrical equipment supplied by the General Electric Company (GEC). Fifty locomotives were delivered in 1971, numbered in the range from E1246 to E1295.[2]

UCW did not allocate works numbers to the locomotives it built for the SAR and used the SAR unit numbers for their record keeping.[1]

Characteristics

Bogies

The Class 6E1 was built with sophisticated traction linkages on their bogies and with stabilisers mounted between the linkages on the bogies and the locomotive body. Together with its electronic wheelslip detection system, these traction linkages and stabilisers ensure the maximum transfer of power to the rails without causing wheelslip.[3]

Orientation

These dual cab locomotives have a roof access ladder on one side only, just to the right of the cab access door. The roof access ladder end is marked as the number 2 end. A passage along the centre of the locomotive connects the cabs, which are identical apart from the fact that the handbrake is located in cab 2. A pantograph hook stick is stowed in a tube mounted below the lower edge of the locomotive body on the roof access ladder side. The locomotive has three small panels along the lower half of the body on the roof access ladder side, and only one panel on the opposite side.[1]

Series identifying features

The Class 6E1 was produced in eleven series over a period of nearly sixteen years, with altogether nine hundred and sixty units placed in service, all built by UCW. This makes the Class 6E1 the most numerous single locomotive class ever to have seen service in South Africa and serves as ample proof of a highly successful design.[1][3]

While some Class 6E1 series are visually indistinguishable from their predecessors or successors, some externally visible changes did occur over the years. Series 1 locomotives had their sandboxes mounted on the bogies, while Series 2 to 11 had their sandboxes mounted along the bottom edge of the locomotive body, with the sandbox lids fitting into recesses in the body.[1]

The fifty Series 2 and the first fifty Series 3 locomotives are visually indistinguishable from each other. On the Series 3 locomotives in the number range from E1346 to E1445, an externally visible difference is a wider stirrup middle step below their side doors. This appears to indicate that Series 2 should actually have consisted of one hundred locomotives and not fifty, firstly since these locomotives, numbers E1246 to E1345, are identical in exterior appearance, and secondly since Series 4, 5 and 6 were all delivered in batches of one hundred.[1][4][5]

Had that been the case, Series 2 and 3 would also have consisted of one hundred locomotives each, numbers E1246 to E1345 and E1346 to E1445 respectively, instead of fifty and one hundred and fifty as they were officially designated, numbered E1246 to E1295 and E1296 to E1445 respectively.[4][5]

Operation

Startup

When there is no compressed air in the locomotive's system to raise a pantograph to start up, a pantograph hook stick is used to manually raise the pantograph. This starts the high voltage motor that drives the auxiliary alternator to supply 110V power to start the compressor and power other control circuits. Once there is enough main air pressure to keep the pantograph in the raised position, the pantograph hook stick can be dropped.[6]

The locomotive is controlled via resistors over which the voltage is dropped in a configuration of series and parallel electrical circuits. The circuit breakers that switch these circuits work under very high power and voltage and are therefore all pneumatically operated for insulation purposes. Compressed air is required to open or close the switch actions and air is also used for the weakfield cam switch, which also switches under very high currents.[6]

Running

Upon starting off and in the low notches the major part of the voltage is dropped over the banks of resistors and all four traction motors are in series.[6] The blowers that accelerate the dissipation of heat in the resistor banks give the Class 6E its very distinctive sound, a deep and loud whine when power is applied.[7]

As the driver notches up, some of the resistor banks are cut out via the pneumatically operated switches and the voltage increases across the traction motors. The more resistors that are cut out as the driver notches higher, the more power is developed by the traction motors. At around 22 to 28 kilometres per hour (14 to 17 miles per hour) the locomotive switches to a parallel combination, where the two traction motors per bogie are in a series electrical circuit while the two bogies are in parallel electrical circuit. Eventually, when all resistors are cut out, the locomotive is operating in full-field.[6]

When the traction motors are operated in full-field, be it in series or parallel mode, they are performing at maximum power for normal operation. To increase the speed at this point, if necessary, higher power output is required from the traction motors. The only way to increase power is to force a higher current flow. To accomplish this, the weakfield cam switch switches resistance in parallel with the field coils, which reduces the overall resistance of the field coils. This increases the magnetic flux and more power is generated by the traction motors over short periods.[6]

Brakes

The locomotive itself used air brakes, but it was equipped to operate trains with air or vacuum brakes. The brake system would be set up for either air or vacuum train working by means of a turning switch on the driver's brake valve and by pre-setting the appropriate brake valves in the passage.

Compressed air pipes

The Class 6E1 locomotives were built with an air brake system consisting of various valves connected to each other with pipes, commonly referred to as a “bicycle frame” brake system. The compressed air pipes run under the locomotive's belly in a zig-zag pattern, going through bolster and other members to extend its length to allow the maximum amount of moisture to condense on the way to the reservoirs. As a result it has multiple pipe connections. A weakness of the system was that, after an accident or even a hard coupling, these pipes tended to develop leaks at the joints that were extremely difficult to repair.[8]

While hauling a vacuum braked train, the locomotive's air brake system would be disabled and the train would be controlled using the train brakes alone to slow down and stop. While hauling an air braked train, on the other hand, the locomotive brakes would engage along with the train brakes. While working either type of train downgrade, the locomotive's regenerative braking system would also work in conjunction with the train brakes.

When the locomotive was stopped, the air brakes on both bogies were applied together. The handbrake or parking brake, located in Cab no. 2, only operated on the unit's last axle, or no. 7 and 8 wheels.

Service

The Class 6E1 family saw service all over both of the 3 kV DC mainline and branchline networks, the smaller Cape Western network between Cape Town and Beaufort West and the larger network that covers portions of the Northern Cape, the Free State, Natal, Gauteng, North West Province and Mpumalanga.[9]

Reclassification and rebuilding

Reclassification to Class 16E

No. E1272, at right, as Class 16E no. 16-100A, Germiston, 21 November 1991

During 1990 and 1991 Spoornet semi-permanently coupled several pairs of otherwise largely unmodified Class 6E1 locomotives, reclassified them to Class 16E and allocated a single locomotive number to each pair, with the individual locomotives in the pairs inscribed "A" or "B". The aim was to accomplish savings on cab maintenance by coupling the locomotives at their number 1 ends, abandoning the number one end cabs in terms of maintenance and using only the number two end cabs.[9]

One such pair was made up of two Series 2 locomotives, numbers E1272 and E1273, which became Class 16E number 16-100A and B respectively.[9]

Rebuilding to Class 18E

Beginning in 2000, Spoornet began a project to rebuild Series 2 to 11 Class 6E1 locomotives to Class 18E, Series 1 and Series 2 at the Transnet Rail Engineering (TRE) workshops at Koedoespoort. In the process the cab at the number 1 end was stripped of all controls in order to have a toilet installed, thereby forfeiting the loco's bi-directional ability. Since the driving cab's noise level had to be below 85 decibels, cab 2 was selected as the Class 18E driving cab primarily based on its lower noise level compared to cab 1, which is closer and more exposed to the compressor's noise and vibration. Another factor was the closer proximity of cab 2 to the low voltage switch panel. The fact that the handbrake was located in cab 2 was not a deciding factor, but was considered an additional benefit.[9][10]

The known Class 6E1, Series 2 locomotives that were used in this project were all rebuilt to Class 18E, Series 2 locomotives. Their numbers and renumbering details are shown in the table.[10]

Liveries illustrated

The main picture shows number E1252 in Spoornet orange livery at Sentrarand locomotive depot in Gauteng. Illustrated below are some of the other liveries that Series 2 locomotives served in.

See also

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 South African Railways Index and Diagrams Electric and Diesel Locomotives, 610mm and 1065mm Gauges, Ref LXD 14/1/100/20, 28 January 1975, as amended
  2. "UCW - Electric locomotives" (PDF). The UCW Partnership. Archived from the original (PDF) on 12 October 2007. Retrieved 30 September 2010.
  3. 3.0 3.1 Paxton, Leith; Bourne, David (1985). Locomotives of the South African Railways (1st ed.). Cape Town: Struik. pp. 128–129. ISBN 0869772112.
  4. 4.0 4.1 E1345 with narrow stirrup
  5. 5.0 5.1 E1346 with wide stirrup
  6. 6.0 6.1 6.2 6.3 6.4 Operation - South African Classes 6E, 6E1, 16E, 17E and 18E
  7. Dulez, Jean A. (2012). Railways of Southern Africa 150 Years (Commemorating One Hundred and Fifty Years of Railways on the Sub-Continent - Complete Motive Power Classifications and Famous Trains - 1860-2011) (1st ed.). Garden View, Johannesburg, South Africa: Vidrail Productions. p. 297. ISBN 9 780620 512282.
  8. Information obtained from Transnet engineers and drivers
  9. 9.0 9.1 9.2 9.3 Railways of Southern Africa Locomotive Guide, 2002 Edition, (Compiled by John N. Middleton), p57, as amended by Combined Amendment List 4, January 2009
  10. 10.0 10.1 Information gathered from the rebuild files of individual locomotives at Transnet Rail Engineering’s Koedoespoort shops, or obtained from John Middleton as well as several Transnet employees