Seville Metro line 1

Ciudad Expo - Olivar de Quintos
Overview
Type Rapid transit
System Seville Metro
Locale Seville
Stations 22
Operation
Opening April 2, 2010
Technical
Track gauge 1,435 mm (4 ft 8 12 in)

The Line 1 of Seville Metro connects the capital, Seville, with Mairena del Aljarafe, San Juan de Aznalfarache and Montequinto (Dos Hermanas).

Description

Line 1 begins in Ciudad Expo (Mairena del Aljarafe), passing beneath the neighborhood, and arrives at the underground station of Calaveri. The line proceeds above ground to the higher portion of the neighborhood of San Juan de Aznalfarache. It continues its underground path through San Juan until arriving at the lower portion of the neighborhood. Next, the line passes above the highway SE-30 by way of a viaduct, and continues on ground level until the station of Blas Infante, located in Seville. From here the line passes underground through los Remedios (line 4, connection expected), Prado de San Sebastián (line 3, expected), San Bernardo (suburban trains connection), Nervión, 1º de Mayo (line 4, expected), Parque Amate, and Cocheras. After this segment, the line once again passes above ground and crosses above the highway SE-30 by way of viaduct before arriving at the station of Guadaira (still located in Seville, capital) which will be an interchange station with a suburban trains. The line extends above the surface towards the station of Pablo de Olavide and advances on the viaduct over the highway of Utrera before finally ending in the neighborhood of Montequinto, which has four stations. The last of these stations is an interchange station between the metro and tram networks. The line has not connection with the line 2.

General characteristics

Operation

Schedules

The closing time corresponds to the departure of the last train beginning from any of the starting stations in order to proceed serving the people waiting in other stations along the line.

NORMAL SCHEDULE
WeekdaysOpeningClosing
From Monday to Thursday
6:30 h
23:00 h
Fridays and weekdays preceding non-working days
6:30 h
2:00 h
Saturdays
7:30 h
2:00 h
Sundays and non-working days
7:30 h
23:00 h
*Applicable since 2009

Segmentation

In line 1 of the metro of Seville, the various rates are established according to the number of segment transfers that the user requires in order to travel from the original station to the final one. For this reason, the line is subdivided zones with different rates, which generally correspond with the borders of the municipalities of Seville and the rest of the metropolitan area through which the line runs. The stations of Blas Infante and Pablo de Olavide serve as the two nexuses between the three zones, and as such, any user moving from a zone to one of these two points does not pay the segment transfer fee.

Distribution of segments

Stations

Line 
Ciudad Expo
Cavaleri
San Juan Alto
San Juan Bajo
Blas Infante
* P. Príncipes
Plaza de Cuba
Puerta Jerez
* Prado S. Sebastián
San Bernardo
Nervión
Gran Plaza
* 1º de Mayo
Amate
La Plata
Cocheras
* Guadaíra*
Pablo de Olavide
Condequinto
Montequinto
Europa
Olivar de Quintos
* In planning phase.