Samara Metro

Samara Metro
Overview
Native name Самарский метрополитен
Samarskiy metropoliten
Locale Samara, Russia
Transit type Rapid transit
Number of lines 1
Number of stations 10
Daily ridership 44,000 (daily average, 2012)[1]
Website Samara Metro
Operation
Began operation 1987
Number of vehicles 44 model 81-717/714 cars
Train length 4–cars
Technical
System length 12.7 km (7.9 mi)[1][2]
System map
Samara metro map

Samara Metro (Russian: Самарское Метро), formerly known as the Kuybyshev Metro (Куйбышевское Метро), is a rapid transit system which serves the city of Samara, Russia. Opened in 1987, it consists of one line with ten stations[2] and approximately 12.7 kilometres (7.9 mi) of bi-directional track.[1][2]

History

The city of Samara (known during Soviet times as Kuybyshev) is situated at the confluence of the Samara and Volga Rivers. Being an important junction of several waterways and railways, the city grew rapidly during the 20th century simultaneously becoming an important industrial centre. In the late 1970s its population exceeded a million passing the legal Soviet requirement to begin developing a rapid-transit system.

The design plan for Kuybyshev was based on the standard Soviet triangle arrangement, but with provisions to suit the dynamics of Kuybyshev, whose business, commercial and historical centre is situated on the edge, on the bank of the Volga River. Whilst the edges of the city were located with industrial zones and Soviet bedroom regions. Most of the central regions (the geographical centre) between the areas were flats built primarily for the workers. It was also the central area which experienced the most concentrated congestion.

In the finalised plan, the first stage was to pass under this central artery and then expand westwards towards following the bank of the Volga around the commercial zone and eventually terminating at the city's central railway terminal. Construction began in 1980, on the first four station stretch totaling 4.5 km. On 25 December 1987 the system was triumphantly opened to the public becoming the fifth such in Russia and the twelfth of the former Soviet Union.

Immediately after the opening of the first stage, which despite its modest size (compared to other Soviet systems) the Metro was overladen with passengers. Construction of the second stage began shortly however, this was slowed down with the disintegration of the Soviet Union and the chaotic economic hardships that followed. Originally scheduled to open in 1991, the next three station 4.5 km segment opened slowly, one station at a time from December 1992 to December 1993.

Despite the economic stagnation, the system managed to grow to length that allowed it to carry out its major transport role, unlike the ill-fated Nizhny Novgorod and Yerevan Metros throughout the 1990s.

Construction on the third planned stage, originally destined for the second half of the 1990s began in 1991, was extremely slow because of constant offsets. The first station opened in December 2002, the second following five years later in 2007.

The next station, Alabinskaya, was due to follow in 2010, however it has been delayed to 2015. Because Samara Metro builders helped to finish off Kazan Metro in 2005, the latter system donated its newer tunnel boring machine to bore the tunnels up to Alabinskaya from Rossiyskaya.

Timeline

The Samara Metro has opened in stages, with the dates and lengths of each stage listed below:[1]

Segment Date opened Length
YungorodokPobeda 26 December 1987 4.5 km
PobedaSovetskaya 31 December 1992 1.6 km
SovetskayaSportivnaya 25 March 1993 1.4 km
SportivnayaGagarinskaya 30 December 1993 1.5 km
GagarinskayaMoskovskaya 12 December 2002 1.3 km
MoskovskayaRossiyskaya 26 December 2007 1.1 km
RossiyskayaAlabinskaya 1 February 2015[3] 1.3 km[2]
Total: 10 stations[2] 12.7 km[1][2]

Operation

Samara Metro
Teatralnaya
Samarskaya
Alabinskaya
Rossiyskaya
Moskovskaya
Gagarinskaya
Sportivnaya
Sovetskaya
Pobeda
Bezymyanka
Kirovskaya
Yungorodok
Krylya Sovetov

The system is operated by a municipal company Samarsky Metropoliten that was privatised from the Russian Ministry of Rail services back in the early 1990s. The company is responsible for all management of the system, including management and repairs of tunnel and track, rolling stock, stations and even planning coordination of construction works.

Stations

The Samara Metro serves ten stations along its single line, as of April 2015.

Rolling stock

The rolling stock is provided by a sole Depot "Kirovskoye" which is responsible for management of all cars. Presentely there are 11 four-carriage trains assigned to the system. All of them are model 81-717/714 although some are .5 standard.

Future

From Alabinskaya the system will continue towards the historical centre towards the central theatre, located not far from the influx of Samarka into the Volga.

On the other end of the line, the station Yungorodok, which was intended to be a temporary station, will be liquidated and a new extension be built to Krylya Sovetov. This would finish the first line and is expected to take place by 2015. Further plans include a second and a third line for the systems, and both Gagarinskaya and Moskovskaya have clear provisions for a future transfer.

See also

References

External links

Wikimedia Commons has media related to Samara Metro.