SCF Sakhalin
Career | |
---|---|
Name: |
2005–2010: FESCO Sakhalin (ФЕСКО Сахалин) 2010–: SCF Sakhalin (СКФ Сахалин)[1] |
Owner: |
2005–2010: Talgona Shipping Co. Ltd.[2] 2010–: SCF Sakhalin Vessels Limited (Sovcomflot)[1] |
Operator: |
2005–2010: Far East Shipping Company 2010–: Sovcomflot |
Port of registry: | Vladivostok, Russia[1] |
Ordered: | 2003[3] |
Builder: | Aker Finnyards, Helsinki, Finland[2] |
Yard number: | 504[1] |
Laid down: | 22 June 2004[2] |
Launched: | 18 February 2005[2] |
Christened: | 31 May 2005[4] |
Completed: | 15 June 2005[2] |
In service: | 2005– |
Identification: |
IMO number: 9307724 Call sign: UHME[2] |
Status: | In service |
General characteristics [1][2][5][6] | |
Type: | Platform supply vessel |
Tonnage: | 6,882 GT 2,065 NT 4,298 DWT |
Displacement: | 9,980 tons |
Length: | 99.90 m (327.8 ft) (overall) 93.936 m (308.2 ft) (waterline) |
Beam: | 20.95 m (68.7 ft) (moulded) 21.23 m (69.7 ft) (max) |
Draught: | 7.50 m (24.6 ft) |
Depth: | 11.00 m (36.1 ft) |
Ice class: | DNV ICE-10 Icebreaker RS LL7 (Icebreaker 7) |
Installed power: | 3 × Wärtsilä 8L38B ( × 5,800 kW) |
Propulsion: | Diesel-electric 2 × ABB Azipod V16 DAS (2 × 6,500 kW) KaMeWa Ulstein TT2200 bow thrusters (2 × 1,100 kW) |
Speed: | 16.7 knots (30.9 km/h; 19.2 mph) (max)[3] 15 knots (28 km/h; 17 mph) (service) 2 knots (3.7 km/h; 2.3 mph) in 1.5 m (4.9 ft) level ice[7] |
Crew: | 40 (max) |
SCF Sakhalin (СКФ Сахалин) is a Russian icebreaking platform supply and standby vessel owned by SCF Sakhalin Vessels Limited, a subsidiary of Sovcomflot, and managed by Far East Shipping Company (FESCO). The ship was built by Aker Finnyards Helsinki shipyard in Finland in 2005 as FESCO Sakhalin (ФЕСКО Сахалин), but was purchased by Sovcomflot and renamed in 2010. Since the beginning it has been in long-term charter for Exxon Neftegas Ltd. and used to supply oil platforms in the Sakhalin-I project.[8]
Design
General characteristics
The maximum overall length of SCF Sakhalin is 99.90 metres (327.8 ft) and its length between perpendiculars is 86.05 metres (282.3 ft). The hull, 93.936 metres (308.2 ft) long at the waterline, has moulded breadth of 20.95 metres (68.7 ft) and maximum breadth of 21.23 metres (69.7 ft). The draught and depth to upper deck are 7.50 metres (24.6 ft) and 11.00 metres (36.1 ft), respectively. The displacement of the icebreaking supply ship is 9,980 tons and its deadweight tonnage is 4,298 tons, gross tonnage 6,882 and net tonnage 2,065.[2]
To supply offshore drilling platforms the ship can carry 1,000 tons of cargo on the 700 m2 (7,535 sq ft) stern deck and 1,500 tons of liquid cargo in its cargo tanks. In addition it has six 50 m3 silos for bulk powder cargoes such as barite and cement.[6][9] While operated by a maximum crew of 40, in case of emergency the ship can provide emergency accommodation for 150 evacuees.[3] It also has two fire monitors, each with an output of 1,200 m3/h,[3] and oil spill response equipment such as an Arctic skimmer and 200 metres of oil boom.[5]
The ship is classified by both Det Norske Veritas and Russian Maritime Register of Shipping with class notations 1A1 ICE-10 Icebreaker Supply Vessel Standby Vessel Fire Fighter I OILREC SF DEICE E0 DYNPOS-AUT NAUT-OC DK(+) HL(2.0)[2] and KM* Icebreaker7[1] AUT1 OMBO FF3WS DYNPOS-2 supply vessel,[1] respectively.
SCF Sakhalin, designed by Aker Arctic, is a double acting ship, meaning that its bow is designed for more efficient operation in open water and stern for the most severe ice conditions. The vessel, winterized for operating temperatures as low as −40 °C (−40 °F), is capable of breaking level ice up to 1.5 metres (4.9 ft) thick at 2 knots[7] and penetrate 20-metre (65.6 ft) ridges with a 4-metre (13.1 ft) consolidated layer.[3][5] In open water the ship has a service speed of 15 knots.[6]
Power and propulsion
The ship has a diesel-electric powertrain with three eight-cylinder Wärtsilä 8L38B 4-stroke medium-speed diesel engines, each with a maximum continuous rating of 5,800 kW (7,778 hp) at 600 rpm, driving 6,847 kVA generators that produce electricity for all shipboard consumers.[9] In addition the vessel has one six-cylinder Wärtsilä 6L20 auxiliary generating set, producing 1,080 kW (1,448 hp) at 1000 rpm, that can be used when the ship is at port, and a Caterpillar 3412 emergency diesel generator.[2]
The vessel is propelled by two 6.5 MW ABB Azipod V16 DAS electric azimuth thrusters. The ice-strengthened pods, designed to meet the requirements of DNV ice class ICE-10, can be used to "eat up" ice rubble while the propeller wash reduces the friction between the hull and the ice. They also give the vessel excellent maneuverability at low speeds and in ice, and dynamic positioning capabilities. In addition the ship has two KaMeWa Ulstein TT2200 bow thrusters with high ice class, 1,100 kW each.[9]
Career
In 2003 by the Russian company Far East Shipping Company PLC (FESCO) placed an order for the world's first large double-acting icebreaker. The ship, designed by Aker Arctic, is a result of a long series of research and development projects dating back to 1989.[3] The keel of the ship was laid on 22 June 2004 in Aker Finnyards Helsinki shipyard and it was launched on 18 February 2005. FESCO Sakhalin, christened on 31 May, was completed on 15 June and delivered to the owner in the following day.[2][4]
Designed specifically for year-round support and standby ice management of the Orlan platform, FESCO Sakhalin was chartered for Exxon Neftegas Ltd. for the operations in the Sakhalin-I project in the Sea of Okhotsk where there is a risk of becoming surrounded by grounded ice rubble.[5]
The ship was acquired by SCF Sakhalin Vessels Limited, a subsidiary of the Russian shipping company Sovcomflot, in 2010 and renamed SCF Sakhalin, but continues in the original charter under the management of FESCO.[10] In 2010 the company ordered two sister ships of slightly upgraded design, priced around $100 million each, from the same shipyard, now partially owned by the Russian United Shipbuilding Corporation and known as Arctech Helsinki Shipyard.[11] The new vessels were delivered in 2012–2013 and are chartered for Exxon Neftegas Ltd. to be used in the Arkutun-Dagi offshore oil field.[12]
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "SCF Sakhalin (040525)". Register of ships. Russian Maritime Register of Shipping. Retrieved 2012-10-16.
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 "SCF Sakhalin (25158)". DNV Exchange. Det Norske Veritas. Retrieved 2012-10-16.
- ↑ 3.0 3.1 3.2 3.3 3.4 3.5 "Aker Arctic Icebreaking Supply and Standby Vessel Fesco Sakhalin" (PDF). Aker Arctic. Retrieved 21 May 2011.
- ↑ 4.0 4.1 "M/S "FESCO SAKHALIN"". Skipsrevyen. Retrieved 21 May 2011.
- ↑ 5.0 5.1 5.2 5.3 "FESCO Sakhalin - Icebreaking supply and standby vessel" (PDF). Aker Finnyards. Retrieved 20 May 2011.
- ↑ 6.0 6.1 6.2 "FESCO Sakhalin (FESCO vessels/Ice-breakers". FESCO Transportation Group. Retrieved 20 May 2011.
- ↑ 7.0 7.1 The world icebreaker, ice breaking supply and research vessel fleet. Baltic Ice Management, February 2011. Retrieved on 2011-10-07.
- ↑ "SCF Sakhalin starts operation". Turkish Maritime. 5 September 2010. Retrieved 20 May 2011.
- ↑ 9.0 9.1 9.2 Mullins, P. Novel Vessels can Cope with Icy Seas. Diesel & Gas Turbine Worldwide, March 2008. Page 50.
- ↑ "Sovcomflot Replenishes Its Fleet with SCF Sakhalin". Russian Transport Daily Report. Retrieved 21 May 2011.
- ↑ "Kahden uuden jäätämurtavan huoltoaluksen tilaus Arctech Helsinki Shipyard Oy:lle Sovcomflotilta". Meriteollisuus. 2010-12-16. Retrieved 21 May 2011.
- ↑ "Russia: Sovcomflot Successiful in Exxon Neftegas Supply Vessel Tender". Offshore Energy Today. 2010-12-20. Retrieved 25 May 2011.