Rolling stock of the Croatian Railways

Main article: Croatian Railways

Diesel locomotives

DesignationBuild yearTotal unitsProducerAAR wheel arrangementPower output in kwhImage
HŽ 2041
1962.-65.
32
Brissoneau et Lotz/Đuro Đaković
Bo'Bo'
606
HŽ 2042
1967.&1962-65.(1993)
3
Brissoneau et Lotz/Đuro Đaković
Bo'Bo'
680,750
HŽ 2043
1960.(1991.)
6
EMD-GM/TŽV Gredelj
(A1A)'(A1A)'
1545
HŽ 2044
1981.
31
EMD-GM/Đuro Đaković
(A1A)'(A1A)'
1826
HŽ 2061
1959.-66.
44 (withdrawn from service)
EMD-GM
Co'Co'
1454
HŽ 2062
1972.-73.
55
EMD-GM/Đuro Đaković
Co'Co'
1640
HŽ 2062-1
(subseries)
1972 -73 / 2002
20
EMD-GM/Đuro Đaković/Turner/Gredelj
Co'Co'
1640
HŽ 2063
1972.
14
EMD-GM
Co'Co'
2461
HŽ 2132
1965.-78.,1959.-63.(1986.),1965.(1989.),1965.-78.(2005)
98
Jenbach/Đuro Đaković/TŽV Gredelj
C
397

Electric locomotives

DesignationBuild yearTotal unitsProducerAAR wheel arrangementPower outputImage
HŽ 1061
1960.-64.,1968.
11 (withdrawn from use in December 2012)
Ansaldo, Italy
Bo'Bo'Bo'
2640
HŽ 1141
1968.-1972.,1987.,1981.-85.,1981.-85.(2002.-03.)
65
ASEA/ Končar
Bo'Bo'
3860
HŽ 1142
1981.-1988.
12+4
Končar
Bo'Bo'
4400

DMUs

DesignationBuild yearTotal unitsProducerAAR wheel arrangementPower outputImage
HŽ 7121
1980.,1981.-86.
49
Đuro Đaković
2Bo' + Bo'2',Bo'Bo' + 2'2'
2x230,2 x 210
HŽ 7122
1980.-81
33
FIAT, Italy & KALMAR, Sweden
(1A)(1A)
2x147
HŽ 7123
2004.
7
Bombardier Transportation
2'B' 2'B'
2x560

EMUs

DesignationBuild yearTotal unitsProducerAAR wheel arrangementPower output in kwhImage
HŽ 6011
1964.-66.
3 (Withdrawn from use)
Pafawag, Poland
2'2'+Bo'Bo+ Bo'Bo'+2'2'
1392
HŽ 6111
1976.-79.
20 (34 Withdrawn from use)
Ganz Mávag, Hungary
2'2'+Bo'Bo'+2'2'
1200
HŽ 6112
2010.
44
Končar, Croatia
Bo'2'2'2'Bo
2000

Withdrawn stock

Rented locomotives and test vehicles in Croatia

Higher speed passenger travel

In Croatia, these well known international brand names were on test:

Hrvatske Željeznice wants to modernise and speed up passenger traffic since currently they are not really able to reach speeds above 160 km/h. There have been tests performed with these two trains. Although shown as very good, they were just tested, not purchased, since a lack of money exists. It is planned to upgrade the track to 200 – 250 km/h in future. These units will most likely not be purchased at the end. A cheaper solution for passenger traffic is sought.

See also

External links