Rio Grande Hydroelectric Complex

Rio Grande Hydroelectric Complex
Location of Rio Grande Hydroelectric Complex in Argentina
Country Argentina
Location Calamuchita Department, Córdoba Province
Coordinates 32°13′18.31″S 64°38′11.48″W / 32.2217528°S 64.6365222°WCoordinates: 32°13′18.31″S 64°38′11.48″W / 32.2217528°S 64.6365222°W
Status Operational
Construction began 1976
Commission date 1986
Construction cost US$315 million
Owner(s) Provincial Power Company Córdoba
Pumped-storage power station
Upper reservoir Cerro Pelado Reservoir
Upper res. capacity 3,675,000 m3 (2,979 acre·ft)
Lower reservoir Arroyo Corto Reservoir
Lower res. capacity 1,600,000 m3 (1,300 acre·ft)
Hydraulic head 185 m (607 ft)
Generating units 4 x 187.5 MW reversible Francis-type
Power generation
Nameplate capacity 750 MW (1,010,000 hp)
Annual generation 977 GWh (3,520 TJ)

The Rio Grande Hydroelectric Complex is a pumped-storage hydroelectric power station in the Calamuchita Department of Córdoba Province, Argentina. The complex consists of two dams and a power station in the Cerro Pelado Valley. Aside from power generation, the complex also serves to control floods and provide municipal water. The two dams on the Tercero River are the Cerro Pelado Dam which forms the upper reservoir and the Arroyo Corto Dam which forms the lower reservoir. The Cerro Pelado dam is 104 m (341 ft) high and 410.5 metres (1,347 ft) long while the Arroyo Corto is 50 metres (160 ft) tall and 1,500 metres (4,900 ft) in length. Water from the upper reservoir is sent to the underground power station during periods of high power demand. The power station contains four 187.5 megawatts (251,400 hp) reversible Francis turbine-generators. Water from the power station is discharged into the lower reservoir. During periods of lower power demand such as at night, water is pumped with the same turbines back up to the upper reservoir for use in peak hours. The difference in elevation between the two reservoirs affords a hydraulic head of 185 metres (607 ft).[1] Construction on the complex began in 1976 and the generators were commissioned in 1986.[2]