Montréal Métro 1961 project with line 3 in red and proposed extensions in yellow

The Red Line (French: Ligne rouge), also known as Line 3 (French: Ligne 3), was a proposed line of the Montreal Metro that never made it past its planning stage. The line was supposed to have 15 stations and end at Cartierville (western) of Bordeaux-Cartierville, using CN tracks and Mount Royal Tunnel under Mount Royal.[1] The line was cancelled because:

The line was still planned for construction in the early 1980s, reduced to a total of 9 stations.

The tracks are now used by the commuter rail Deux-Montagnes Line.

1982 list of planned stations[2]

See also

References

  1. "Why is there no line 3?". Everything about the STM. Société de transport de Montréal. Retrieved 8 September 2012.
  2. "Le Métro fait surface: La ligne 6". Quebec Science, vol. 21, no. 3, Nov. 1982. Ministere des Transports du Quebec and le Conseil des Transports de la region de Montreal.