Rail Baltica

Map of Rail Baltica: The solid line represents the direct option involving a new railway; the dashed line is a longer route which would also connect Tartu and Vilnius. (Country and city names are in Latvian)

Rail Baltica is one of the priority projects of the European Union: Trans-European Transport Networks (TEN-T). The project is supposed to link Finland, the Baltic States and Poland and also improve the connection between Central and Northern Europe and Germany. It envisages a continuous rail link from Tallinn (Estonia), to Warsaw (Poland), going via Riga (Latvia) and Kaunas (Lithuania). It will by-pass the Kaliningrad Oblast (Russia) and Hrodna (Belarus), which have historically hosted two Poland-Lithuania rail routes. The route is estimated to be completed by 2024.[1]

The section from Helsinki to Tallinn will be operated by existing commercial ferries. In the future a proposed Helsinki to Tallinn Tunnel could provide a rail link between the two cities.[2] The length of the railway between Tallinn and Warsaw will be at least 950 kilometres (590 mi).

Route and standard

There are two options to build the Rail Baltica. Both options include an upgrade of the existing railway (with standard gauge) to 160 km/h (99 mph) for the stretch that runs from Warsaw via Białystok and Ełk to Trakiszki,[3] followed by a new railway with standard gauge Trakiszki-Kaunas.

For the remainder of the route to Tallinn there are two options.

Although there is an EU high-speed directive saying that new TEN-T lines should have a speed of 250 km/h (160 mph), with only upgraded lines allowed at a lower speed of 200 km/h, it is hard to finance the project as it is, and so if the project succeeds, 200 km/h is most likely for the newly constructed line, and 160 km/h for the upgraded section which is a higher-speed rail.[6] As there are many level crossing and 160 km/h normally is the maximum train speed over them, there would be a large cost increase for upgrading to 200 km/h.

Track gauge

Feasibility studies for 1,435 mm (4 ft 8 12 in) standard gauge ("European gauge") have been conducted.[7][8]

Financing and the time horizon

The project will be financed by the member states and by the European Union TEN-T budget (124 million), Structural and Cohesion Funds provided to the EU New Member States.[9] The total cost is expected to be around €1.5 billion for option one and around €2.4 billion for option two.[3]

The 66 kilometres (41 mi) line between Tartu to Valga (on the Latvian border) in Estonia was the first part to be renovated. This was done by the Finnish VR Group between 2008 and 2010. The cost was €40M.[10][11]

In Lithuania, the two parts Polish border-Marijampolė (using standard gauge) and Šiauliai-Latvian border (using broad gauge) will be new built, to be finished 2015, costing €270M.[10] In Latvia the existing railway will be upgraded, to be finished 2015, costing €97M.[10] The EU will contribute with about 25% of the cost for the three parts.

The EU also finances a technical study for a new standard gauge railway between Estonia and Poland.[10]

On October 28, 2014, the Rail Baltica II joint venture of the Baltic States was established for implementation of the project. The construction is expected to start in 2020 and be complete in 2024.[12]

Opportunities

Rail Baltica creates the possibility to shift the major freight transport in the regions from road to rail, which for the time being is transported towards Russia and then north by heavy trucks. In the case of Poland the trucks follow the local roads and directly cross the villages of Podlaskie Voivodeship (north-east Poland) endangering their inhabitants. Transporting the freight by rail would increase the safety of the local roads and also reduce the CO2 emissions and oil consumption. Furthermore, it would create a convenient passenger connection which does not exist at the moment.

Rail Baltica could be a sustainable sound alternative to the planned Via Baltica motorway which has proved controversial on environmental grounds. In contrast to Via Baltica, the implementation of the Rail Baltica project could become a good practical example of sustainable and efficient utilisation of the Cohesion and Structural Funds, bringing social and economical benefits, as well as environmental and climatic improvements.

Railways currently have a low number of passengers along the route, especially in Estonia and Latvia. International and regional travel is done by car, bus and air with very little by train.

Constraints to be resolved

One of the project's aspects is the conversion of the Baltic States' rail network to Standard Gauge (1,435 mm (4 ft 8 12 in)), thus improving rail integration with Europe at the expense of integration with the Russian system (1,520 mm (4 ft 11 2732 in)).[13]

If the north-south railways are converted to standard gauge, the west-east railways are still not likely to be converted, since they are used for freight and passenger trains to Russia. There is even a consideration to build a new west-east high-speed railway Riga–Moscow which will use Russian gauge.[14] That project is not prioritized by the EU and Latvia until Rail Baltica is finished.

Lithuanian railways are freight-oriented with little passenger traffic; the railways transport the largest proportion of goods by train in Europe (over 57 percent).

See also

References

  1. Frances Robinson and Liis Kängsepp (December 8, 2013). "Borders Raise Hurdles for Baltic High-Speed Rail Link". The Wall Street Journal. Retrieved December 19, 2013.
  2. "Helsinki-Tallinn Rail Tunnel Link?". YLE News. October 31, 2008.
  3. 3.0 3.1 3.2 European Commission, Directorate-General Regional Policy (January 2007). "Feasibility study on Rail Baltica railways" (PDF).
  4. Baltic Course (March 2011). "Rail Baltica's fate to become clearer by the end of May" (PDF).
  5. Baltic Course (June 2011). "Project Rail Baltica would cost EUR 3.68 bln" (http).
  6. "Rail Baltica Final Report Volume I". AECOM Limited. May 2011. p. 248. Retrieved 13 November 2013.
  7. "Studies for a European gauge line for Rail Baltica (Estonian section)". Innovation and Networks Executive Agency. 2007. Retrieved 2014-04-18.
  8. "Studies for a European gauge line (Latvian studies)". Innovation and Networks Executive Agency. 2007. Retrieved 2014-04-18.
  9. European Union (November 21, 2007). "Trans-European Transport Network (TEN-T): selection of projects for the TEN-T multi-annual programme 20072013 and the annual TEN-T programme 2007" (Press release).
  10. 10.0 10.1 10.2 10.3 Mid-Term Review. Detailed report from 2010. See pdf page number 161-172. (65 MB)
  11. VR Group (April 28, 2008). "VR-Track wins superstructure renovation contract for Tartu-Valga track" (Press release). Finland.
  12. "The Rail Baltica II Joint venture of the Baltic States is established". Republic of Latvia Ministry of Transport. 28 October 2014. Retrieved 27 January 2015.
  13. "Lietuvos Respublikos Susisiekimo Ministerija".
  14. Augulis: high-speed railroad project between Riga and Moscow must be self-sufficient

External links