Purple Line (Maryland)

     Purple Line
Overview
Type Light rail transit
System Maryland Transit Administration
Status Proposed
Locale Montgomery County, MD
Prince George's County, MD
Termini Bethesda (West)
New Carrollton (East)
Stations 21 (planned)[1]
Daily ridership 64,800 (2030 projection)[1]
Operation
Opening 2020 (planned)[2]
Operator(s) TBD
Character TBA
Technical
Track length 16.3 mi (26.2 km)[1]
Track gauge 4 ft 8 14 in (1,429 mm)
Electrification TBA
Route map
Legend
Bethesda (Metro Red Line)
Connecticut Avenue (elevated)
Lyttonsville Road
16th Street
Silver Spring (Metro Red Line, MARC Brunswick Line)
Silver Spring Library, Fenton Street
Dale Drive
Manchester Road
Arliss Street
Gilbert Street, Takoma Park
Takoma Park–Langley Park
Riggs Road
Adelphi Road (underground)
Univ of Maryland Campus Center
East Campus
College Park (Metro Green Line, MARC Camden Line)
River Road
Riverdale Park (elevated)
Riverdale Road
Annapolis Road (underground)
New Carrollton (Metro Orange Line, MARC Penn Line)

The Purple Line, previously designated as the Bi-County Transitway, is a proposed 16-mile (25 km) transit line to link the Red, Green, and Orange lines of the Washington Metro transportation system in the Maryland suburbs of Washington, D.C.[3] The project is administered by the Maryland Transit Administration (MTA). On October 7, 2011 the proposed light rail line received Federal Transit Administration approval to enter the detailed engineering phase which, according to the Washington Post, is "a significant step forward in its decades-long trek toward construction."[4]

History

The Purple Line was conceived as a rail line from New Carrollton to Silver Spring. Maryland's Glendening administration (which included John Porcari as Secretary of Transportation) removed the heavy rail option from planning discussion because it was felt that the cost was greater than the need.

Robert Flanagan, the Maryland State Secretary of Transportation under Governor Robert Ehrlich, merged the Purple Line with another transportation project, Georgetown Branch Light Rail Transit (GBLRT). The GBLRT was proposed as a light rail transit line from Silver Spring westward, following the former Georgetown Branch of the Baltimore & Ohio Railroad (now a short CSX siding and the Capital Crescent Trail) to Bethesda.[3]

Both Governor Ehrlich and Secretary Flanagan introduced an alternative mode bus rapid transit — that might have been utilized in lieu of light rail transit. To reflect this possibility, the administration changed the name of the project to the "Bi-County Transitway" in March 2003. Another reason that "the Purple Line" was discouraged by the Ehrlich administration was that its associations with the other color-oriented names of the Washington Metro system (which consists of heavy rail) might lead the public to expect a heavy rail option. The new name did not catch on, however, as several media outlets and most citizens continued to refer to the project as the Purple Line. As a result, Governor Martin O'Malley and Secretary of Transportation John Porcari opted to revert to "Purple Line" in 2007.[3]

In January 2008, the O'Malley administration allocated $100 million within a six-year capital budget to complete design documents for state approval and funding of the Purple Line.[5] In May 2008, it was reported that the Purple Line could carry about 68,000 daily trips.[6]

A draft environmental impact study was issued on October 20, 2008.[7] On December 22, 2008, Montgomery County planners endorsed building a light rail line rather than a bus line. On January 15, 2009, the county planning board also endorsed the light rail option,[8] and County Executive Isiah Leggett has also expressed support.[9] On October 21, 2009, members of the National Capital Region Transportation Planning Board voted unanimously to approve the Purple Line light rail project for inclusion into the region’s Constrained Long-Range Transportation Plan.[10]

Even though the project is overseen by the Maryland Transit Administration (MTA), it is not yet clear who would operate the Purple Line if it were constructed. MTA representative Michael Madden said that the Washington Metropolitan Area Transit Authority (WMATA) has been working with the MTA to develop the Purple Line. The future transit system could be operated by the state of Maryland, by WMATA, or by Montgomery and Prince George's counties. Regardless, planners intend to utilize existing Metrorail stations and for the Purple Line to accept WMATA's SmarTrip farecard.[11] Metro's 2008 annual report asks readers to imagine that in 2030 the Purple Line will be integrated with WMATA's existing transit system.[12][13]

Route and station locations

A map of the proposed Purple Line routes including alternative alignments

The planned rail or rapid bus line will connect the existing Metro, MARC commuter rail, and Amtrak stations at:[14]

The following stations are part of the "Locally Preferred Alternative" route approved by Governor Martin O'Malley on August 9, 2009:[15]

Potential further expansion

Although the majority of discussions about the Purple Line describe the project as a 16-mile east-west line between Bethesda and New Carrollton,[14] there have been several proposals to expand the line further into Maryland or to mirror the Capital Beltway as a loop around the entire Washington, D.C. metropolitan area. The Sierra Club has argued for a Purple Line which would "encircle Washington, D.C." and "connect existing suburban metro lines."[16] Maryland Lieutenant Governor Anthony G. Brown, while campaigning in 2006, similarly stated that he'd "like to see the Purple Line go from Bethesda to across the Woodrow Wilson Bridge," adding, "Let’s swing that boy all the way around" (a reference to having the Purple Line circle through Virginia and back to the line's point of origin in Bethesda).[17]

An advocacy group known as "The Inner Purple Line Campaign" has stated that the Purple Line could be extended westward to Tysons Corner and eastward to Largo, and that it could eventually cross the new Wilson Bridge from Suitland through Oxon Hill to Alexandria, eventually forming a rail line that encircles the city.[18] The reconstruction of the Woodrow Wilson Bridge (I-495's southern crossing over the Potomac River) provides capacity for the bridge to carry a heavy or light rail line.[19] Suggested stops along this proposed Purple Line expansion include:[20]

Community support and opposition

Support for rail

Support for bus

Opposition to rail

See also

References

  1. 1.0 1.1 1.2 1.3 "Governor O'Malley Announces Purple Line Locally Preferred Alternative" (Press release). New Carrollton, MD: MDOT. 2009-08-04. Retrieved 2014-10-18.
  2. "About the Project: Funding/Schedule". purplelinemd.com. MTA. Retrieved 2014-10-18.
  3. 3.0 3.1 3.2 "About the Project". purplelinemd.com. MTA. Retrieved 2014-10-18.
  4. Wiggins, Ovetta (2011-10-07). "Plans for Purple Line move forward in Maryland". The Washington Post. Retrieved 2011-10-08.
  5. Davis, Janel (2008-01-18). "O’Malley allocates $100M for Purple Line planning". The Gazette (Maryland: Post-Newsweek Media). Retrieved 2014-10-19.
  6. Shaver, Katherine (2008-05-30). "Trips on Purple Line Rail Projected at 68,000 Daily". The Washington Post.
  7. Maryland Transit Administration (2008-10-20). "Project Alternatives Analysis/Draft Environmental Impact Statement (AA/DEIS)". MTA (Maryland). MTA. Retrieved 2008-10-21.
  8. Spivak, Miranda S. (2009-01-16). "Montgomery Planners Back Rail". The Washington Post. Retrieved 2014-10-21.
  9. Shaver, Katherine (2009-01-23). "Leggett Endorses Light-Rail Plan". The Washington Post. Retrieved 2014-10-21.
  10. TPB News Vol XVII Issue 4 p. 1 (November 2009). "TPB Gives Final Approval to Purple Line Project" (PDF). Metropolitan Washington Council of Governments. Retrieved 2014-10-21.
  11. "Public Meeting on the Purple Line" (PDF). Town of Chevy Chase, Maryland. 2007-06-06. Archived from the original (PDF) on 2013-08-06. Retrieved 2014-10-21.
  12. "2008 Annual Report" (PDF). Washington Metropolitan Area Transit Authority. Retrieved 2009-01-21.
  13. "Metro preparing for more people to shift to transit if gasoline prices continue to skyrocket". WMATA. 2008-05-22. Retrieved 2009-06-24.
  14. 14.0 14.1 "Purple Line Facts".
  15. Purple Line Conceptual Plans: Project Area Map MTA Maryland
  16. "Purple Line". Sierra Club. Retrieved 2009-12-04.
  17. Thomas Dennison and Douglas Tallman (2006-10-04). "Brown’s ‘lofty’ Purple Line plans draw fire from transportation officials". Gazette.Net. Retrieved 2009-12-04.
  18. 18.0 18.1 What is the Purple Line?, The Inner Purple Line Campaign, a project of the Action Committee for Transit (ACT), retrieved 2009-12-4
  19. Scott M. Kozel (2009-02-25). "Woodrow Wilson Bridge (I-495 and I-95)". Roads to the Future. Retrieved 2010-01-05.
  20. "Sierra Club Purple Line Map".
  21. Scott M. Kozel (2001-01-23). "Metrorail Branch Avenue Route Completion". Roads to the Future. Retrieved 2010-01-05.
  22. "Purple Line Now: Who We Are". Purple Line Now. Retrieved 2011-10-08.
  23. "Full Speed Ahead". The Washington Post. November 16, 2008. Retrieved 2008-12-19.
  24. Montgomery County Council votes 8-0 for medium light rail option (2009-1-27) Purple Line NOW! accessed 2010-1-6
  25. Prince George's County Council approves the new Transportation Master Plan (2009-1-17) Purple Line NOW! accessed 2010-1-6
  26. 26.0 26.1 Katherine Shaver (2008-07-13). "Purple Line Foes Offer No Ideas, And No Names". The Washington Post. Retrieved 2009-12-04.
  27. "Purple Line". Sierra Club. Retrieved 2008-12-19.
  28. Katherine Shaver (May 13, 2007). "Students Urge Stronger Backing of Purple Line". The Washington Post. p. C04.
  29. "Letter from student leaders to UMD President" (PDF). Retrieved 2007-06-04.
  30. Shaver, Katherine (2009-01-23). "Leggett Endorses Light-Rail Plan". The Washington Post. p. B03. Retrieved 2009-01-26.
  31. Maynard, Patrick (2011-06-08). "Rails to Trails VP on Purple Line". The Baltimore Sun. Retrieved 2011-06-19.
  32. 32.0 32.1 Analysis of MTA Purple Line Sam Schwartz Engineering, 2008-4-23, Study of BRT alternative for Town of Chevy Chase, retrieved 2009-12-1
  33. Save the Trail Petition
  34. Save the Trail Petition: Alternatives Studies of alternatives to a Capital Crescent Trail alignment, retrieved 2009-12-2
  35. Katherine Shaver (January 16, 2005). "Fortunes Shift for East-West Rail Plan". The Washington Post. p. C01.
  36. Katherine Shaver (July 7, 2008). "Chevy Chase Says Buses Beat Trains on Purple Line". The Washington Post.
  37. Luz Lazo (30 September 2011), "In Langley Park, Purple Line brings promise, and fears, of change", The Washington Post, retrieved 15 November 2011
  38. Jason Tomassini (May 12, 2010). "MTA pushing for additional Purple Line stop in Silver Spring". The Gazette.
  39. Purple Line study report (August 2009). "An evaluation of the merits of an LRT station at Dale Drive and Wayne Avenue" (PDF). MTA Maryland. Retrieved 2010-07-13.
  40. "Dulles Corridor Metrorail Project Newsletter" (PDF). November 2012.

External links