Plant System

"Plant system" redirects here. For other uses, see Plant system (disambiguation).
Plant System
Locale United States Atlantic coast
Dates of operation 18601902
Successor Atlantic Coast Line Railroad
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge ; 3 ft (914 mm) and 5 ft (1,524 mm) gauge lines also present
Savannah, Florida & Western Railway's Locomotive No. 110, built in 1900. In a 1901 test, sister engine No. 111 averaged 120mph for 5 miles.[1]
1882 map

The Plant System was a system of railroads and steamboats in the U.S. South, taken over by the Atlantic Coast Line Railroad in 1902. The original line of the system, named after its owner, Henry B. Plant, was the Savannah, Florida and Western Railway, running across southern Georgia.[2]

History

The Savannah and Albany Railroad was chartered December 25, 1847 to connect Savannah to Albany, Georgia. In 1853 it was renamed as the Savannah, Albany and Gulf Railroad, and it opened in 1858 from Savannah west to Screven, just west of Jesup.

The Atlantic and Gulf Railroad was chartered in December 1856 to also run west from Savannah, but to run south of Albany via Thomasville. Rather than build all the way to Savannah, it used the Savannah, Albany and Gulf's line. It opened from Screven west to Blackshear in April 1859, Homerville around October, Valdosta in July 1860, and Thomasville soon after. Construction stopped then due to the American Civil War. The two companies merged in May 1863, forming a new Atlantic and Gulf Railroad from Savannah to Thomasville.

Late in the Civil War, a branch was built from Dupont south to the Florida state line, where a branch of the Pensacola and Georgia Railroad from Live Oak connected. This was intended to connect the railroads in Florida with the rest of the network, but came too late to be of much use. After the war, the A&G acquired the full branch. In 1867 an extension of the main line west to Bainbridge opened.

The South Georgia and Florida Railroad opened from Thomasville north to Pelham in 1869 and to Camilla and then to Albany in 1870. It was merged into the Atlantic and Gulf before any section opened, and operated as their Albany Branch.

1870 map with connections

In December 1875 the "Junction Branch" in Savannah opened, connecting the line to the Charleston and Savannah Railroad. The company went bankrupt on January 1, 1877, and Henry Plant bought it on November 4, 1879, reorganizing it as the Savannah, Florida and Western Railway on December 9. The Plant Investment Company was formed in 1882 to lease and buy other railroads and expand the system.

Plant bought the Savannah and Charleston Railroad (opened 1860) in 1880, reorganizing it as the Charleston and Savannah Railway. That acquisition extended the line from Savannah northeast to Charleston, South Carolina, where the Ashley River Railroad (operated by the C&S) connected to the Northeastern Railroad (later part of the Atlantic Coast Line Railroad main line).

The Waycross and Florida Railroad and East Florida Railroad were chartered in February 1880, forming the Georgia and Florida parts of the "Waycross Short Line". That line, running from the main line at Waycross southeast to Jacksonville, Florida, opened in April 1881.

In 1882, the Chattahoochee Branch opened from Climax on the main line southwest to the Florida state line, where the Chattahoochee and East Pass Railroad (chartered 1881) continued to River Junction, Florida, a hamlet which later came to be known as Chattahoochee, Florida. At River Junction, the Louisville and Nashville Railroad's Pensacola and Atlantic Railroad continued west, and the Florida Central and Western Railroad ran east to Jacksonville.

The Live Oak and Rowland's Bluff Railroad and Live Oak, Tampa and Charlotte Harbor Railroad were chartered in 1881 to continue the short Florida Branch south from Live Oak further into Florida (eventually reaching Gainesville with a branch to Lake City). Plant tried to acquire the 3 ft (914 mm) narrow gauge Florida Southern Railway to continue this line, but was unsuccessful, and on May 4, 1883 he bought 3/5 of the stock of the 3 ft narrow gauge South Florida Railroad. At the time, the only connection between this system, with a main line from Sanford west to Tampa, was via steamboats on the St. Johns River from Jacksonville to Sanford.

Advertising trade card for the railroad.

The various lines of the SF&W were consolidated into one company in 1884. Specifically, the following companies lost their corporate existence:

The Brunswick and Western Railroad, opened in the late 1850s as the Brunswick and Florida Railroad, was bought by Plant in 1884.

In 1886, the system was changed to 4 ft 8 12 in (1,435 mm) standard gauge; it had previously consisted of 5 ft (1,524 mm) broad gauge lines and 3 ft (914 mm) narrow gauge lines.

In 1887 the Green Pond, Walterboro and Branchville Railway opened as a short branch of the main line to Walterboro, South Carolina. The Walterborough and Western Railroad continued that line to Ehrhardt in 1896, and the two were merged into the Green Pond, Walterboro and Branchville Railroad in 1900.

On May 30, 1887, Florida state law chapter 3794 was approved, authorizing the SF&W to build lines from Tallahassee and Monticello north to the Georgia state line, connecting to branches from Thomasville, Georgia. The Tallahassee Branch was never built, but the Monticello Branch opened in 1888.

Plant obtained a controlling interest in the Alabama Midland Railway in July 1890. That line continued the main line from Bainbridge west to Montgomery, Alabama. The Southwestern Alabama Railway and Abbeville Southern Railway, two branches of that line, were acquired in the 1890s.

In 1890, the 3 ft narrow gauge Florida Southern Railway went into receivership and remained so for two years. During this time, its Charlotte Harbor branch operated independently and converted this portion of the line to 4 ft 8 12 in. In 1892, Plant bought the Florida Southern Railway under foreclosure and reorganized it as the Florida Southern Railroad. At this time, the Florida Southern system stretched from the south end of the Plant System at Gainesville south via Ocala, using trackage rights over the South Florida Railroad's Pemberton Ferry Branch, to Punta Gorda. The Florida Southern Railroad was integrated with the rest of the Plant System in 1896 and was converted to 4 ft 8 12 in that same year.[3]

The Silver Springs, Ocala and Gulf Railroad was chartered in 1877 and opened in 1892, running from Ocala west to Dunnellon and then south to Homosassa and Inverness. A connection was built from Inverness to the South Florida Railroad at Pemberton Ferry.

The Winston and Bone Valley Railroad, opened in 1892 to serve phosphate mines near Lakeland, became part of the Plant System in 1896.

The Tampa and Thonotosassa Railroad was incorporated in 1893, running northeast from the South Florida Railroad in Tampa to the small town of Thonotosassa.

In 1895, Plant bought the 3 ft narrow gauge Sanford and St. Petersburg Railroad (previously the Orange Belt Railway) in 1895, which stretched across the state from Sanford to St. Petersburg. The most profitable section of this line was immediately converted to 4 ft 8 12 in, leaving the remaining section from Trilby to Sanford in its original gauge. The 4 ft 8 12 in Florida Midland Railway in the Orlando area was acquired in 1896, its line north of the Sanford and St. Petersburg Railroad was abandoned, and its remaining track from Sanford to Kissimmee was converted to 3 ft narrow gauge. By keeping these two connecting lines the same narrow gauge, they were able to work in conjunction with one another, utilizing the same narrow gauge equipment from both the Sanford and St. Petersburg Railroad and the recently converted Florida Southern Railroad.[4]

In 1899, the Jacksonville, Tampa and Key West Railway, except for the branch to Titusville (which had been sold to the Florida East Coast Railway), was reorganized and bought by Plant as the Jacksonville and St. Johns River Railway. This supplied a connection between Jacksonville and Sanford without the need for a steamboat transfer at each end, as well as system connections at Tavares and Palatka.

The Plant System built the nearly straight 54 mi (87 km) Folkston Cutoff in southeast Georgia in 1901.[5] This ran from the old Waycross and Florida Railroad at Folkston north via Nahunta to Jesup on the SF&W mainline, allowing trains to bypass Waycross and save 19 mi (31 km) over the old route.

In 1901, the Green Pond, Walterboro and Branchville Railroad, the Ashley River Railroad, the Abbeville Southern Railway; and Southern Alabama Railroad were all consolidated into the Savannah, Florida and Western Railway.[6]

In 1901, the following companies were also merged into the SF&W:

In 1902 the Atlantic Coast Line Railroad acquired the entire Plant System, connecting at Charleston, SC. The components were soon merged into the ACL. The system has since become part of CSX after several mergers.

Station listing

Milepost City Station Opening date Connections and notes
A490.9 Savannah continues as Charleston and Savannah Railroad (Plant)
junction with Savannah and Atlantic Railroad (CoG)
A503.1 Miller's junction with Florida Central and Peninsular Railroad Northern Division (SAL)
Way's
Fleming
A522.8 McIntosh junction with Savannah, Hinesville and Western Railway
A528.8 Walthourville
Ludowici junction with Georgia Coast and Piedmont Railroad
originally Johnston
A543.7 Doctortown
A548.2
AN548.2
Jesup Amtrak Silver Meteor
junction with Folkston Cutoff and Macon and Brunswick Railroad (SOU)
Drady's
Steam Mills
AN559.5 Screven
AN567.2 Offerman junction with Brunswick and Birmingham Railway (ACL)
Patterson
Blackshear
AN587.8 Waycross junction with Waycross and Florida Railroad (Plant), Brunswick and Western Railroad (Plant), Waycross Air Line Railroad (ACL), Waycross and Western Railroad and Waycross and Southern Railroad
originally Malvern
Tebeauville
Glenmore junction with Brunswick and Albany Railroad (Plant, abandoned ca. 1871)
Argyle
AN613.4 Homersville
AN622.3 Dupont junction with Florida Division
originally Lawton
AN628.9 Stockton
AN634.8 Naylor junction with Lakeland Railway
AN649.8 Valdosta junction with Georgia and Florida Railroad (SOU), Georgia Southern and Florida Railway (SOU), Atlantic, Valdosta and Western Railway (SOU) and Valdosta, Moultrie and Western Railroad
Ousley's
AN665.3 Quitman junction with South Georgia Railroad (SOU)
Dixie's originally Groover
Pidcock original junction with Georgia Northern Railway (SOU)
AN679.3 Boston junction with Georgia Northern Railway (SOU)
AN694.1 Thomasville junction with Monticello Branch, South Georgia and Florida Railroad (Plant), Tifton, Thomasville and Gulf Railway (ACL) and Florida Central Railroad (ACL)
AN705.6 Cairo junction with Pelham and Havana Railroad
AN712.6 Whigham
AN719.0 Climax junction with Chattahoochee Branch
AN728.9 Bainbridge continues as Alabama Midland Railway (Plant)
junction with Georgia, Florida and Alabama Railway (SAL) and Bainbridge Northern Railway

Florida Division

Milepost City Station Opening date Connections and notes
Dupont junction with main line
originally Lawton
Haylow junction with Atlantic, Valdosta and Western Railway (SOU) and Statenville Railway
originally Forrest?
Statenville
Jasper junction with Georgia Southern and Florida Railway (SOU)
Suwanee
Live Oak continues as Live Oak and Rowland's Bluff Railroad (Plant)
junction with Pensacola and Georgia Railroad (SAL), Live Oak and Perry Railroad and Florida Railway

References

Further reading

External links