Nevada Northern Railway

Nevada Northern Railway
Reporting mark NN
Locale Nevada
Dates of operation 19051983
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge
Headquarters Ely, Nevada

The Nevada Northern Railway (reporting mark NN) was a railroad in the U.S. state of Nevada, built primarily to reach a major copper producing area in White Pine County, Nevada. The railway, constructed in 1905-06, extended northward about 140 miles from Ely to a connection with the Southern Pacific Railroad at Cobre. In 1967 NN reported 40 million net ton-miles of revenue freight on 162 miles of line. [1]

History

0-6-2 Saddle Tank Locomotive for Switching Service. Built by the Baldwin Locomotive Works for the Nevada Consolidated Copper Co.
Abandoned Nevada Northern trackage and depot at Currie, Nevada, 2007

The Nevada Northern owes its beginnings to the discovery and development of large porphyry copper deposits near Ely early in the 20th century. Two of the region's largest mines were purchased in 1902 by Mark Requa, president of the Eureka and Palisade Railroad in central Nevada.[2]

Requa then organized the White Pine Copper Company to develop his new properties, and it soon became evident that rail access to the isolated region would be essential to fully exploit the potential of the mines. Subsequent surveys indicated that the most practical route for such a railroad was northward from Ely, connecting with the Southern Pacific somewhere in the vicinity of Wells.

The Ely-area copper properties were further merged in 1904, forming the Nevada Consolidated Copper Company, and the Nevada Northern Railway was incorporated on June 1, 1905 to build a line connecting the Nevada Consolidated mines and smelter to the national rail network. The task of building the new railroad was contracted to the Utah Construction Company, which began work on September 11, 1905. Construction began at Cobre, where the Nevada Northern connected with the Southern Pacific, and proceeded southward. The line was finished a year later, its completion marked by a two-day celebration in Ely. The railroad's symbolic final spike—made of local copper—was driven by Requa in Ely on September 29, 1906.

Additional Ely-area trackage was constructed in 1907-1908 to serve the local mining industry. This trackage, known as the "Ore Line," included a route bypassing Ely to the north and continuing west up Robinson Canyon to the copper mines at Ruth. East of Ely, the Ore Line project saw the construction of the "Hiline," a branch leading to Nevada Consolidated's new copper smelter and concentrator at McGill. The Ore Line immediately became the busiest segment of the Nevada Northern by far, hosting dozens of loaded and empty ore trains daily.

As a subsidiary of Nevada Consolidated, the primary purpose of the Nevada Northern throughout its history was the haulage of copper ores and products. Other freight traffic was also carried, and the railroad operated a daily passenger train between East Ely and Cobre until 1941. Local trains were also operated from Ely to Ruth and McGill for the benefit of mine employees and others until the 1930s, and special school trains carried students to White Pine High School in central Ely.

A series of corporate financial transactions in the 1920s and 1930s brought Nevada Consolidated under the control of the Kennecott Copper Corporation, and Nevada Consolidated was formally merged into Kennecott in 1942. The Nevada Northern thus became a Kennecott subsidiary.

Faced with declining ore reserves and low copper prices, Kennecott closed its Ruth-area mines in May 1978, thus ending the ore trains between Ruth and the McGill smelter. The smelter itself closed on June 20, 1983, and the Nevada Northern suspended all operations immediately thereafter.

Nevada Northern Railway today

Excursion train hauled by locomotive No. 40, in 2005. #40 was purchased new in 1910 for $13,139.

In a series of donations beginning in 1986, Kennecott transferred the entire Ore Line, as well as the railroad's yard and shop facilities in East Ely, to the White Pine Historical Railroad Foundation, a non-profit organization which today operates the property as the Nevada Northern Railway Museum which operates a heritage railroad on this part of the former NN.

Passenger excursion train service is offered between Ely, Ruth, and McGill using period equipment pulled by historic steam and diesel locomotives.

In April 2006, Nevada's National Historic Landmarks Committee granted unanimous support to nominating the Nevada Northern's East Ely shops complex as a National Historic Landmark. The nomination was approved by the National Park Service on September 27, 2006.[3]

The remainder of the Nevada Northern has largely been moribund since 1983. In 1987, the Los Angeles Department of Water and Power purchased the Cobre-East Ely line, in anticipation of the construction of a coal-fired generating plant along the route, which was never constructed. Meanwhile, the 1990s saw a brief resumption of copper mining near Ruth, this time by Broken Hill Proprietary Company (BHP). This project saw the construction of additional trackage near Ruth, and the resumption of service from there as far as Shafter by the BHP Nevada Railroad in 1996. Both the mine and railroad shut down again in 1999, and when mining resumed in 2004 concentrates were hauled by truck rather than by rail.

The disused line between Ely and Cobre was acquired by the city of Ely in 2006. Recent plans by Sierra Pacific Resources for the construction of the "Ely Energy Center", a 2,500 megawatt coal-fired generating plant in the Ely vicinity are raising the possibility that the railroad may see yet another revival, this time carrying inbound loads of coal to White Pine County.[4]

Locomotive Roster

Number Builder Type Date built Heritage Disposition Notes
1 Schenectady Locomotive Works 4-4-0 June 1869 Central Pacific Railroad No. 161 Juno (1869-April 1885)
Southern Pacific Transportation Company No. 1228 (1885-November 1905)
Retired 1923, scrapped 1931. Purchased for $4,018. Passenger locomotive.
2 Schenectady Locomotive Works 4-6-0 December 1880 Southern Pacific Transportation Company No. 26, 106, 1609, 2045 (1880-December 1905) Sold to Steptoe Valley Smelting & Mining in 1914, scrapped in 1931. Purchased for $5,425.
3 Schenectady Locomotive Works 4-6-0 September 1882 Southern Pacific No. 73, 153, 1645, 2075 (1882-December 1905) Scrapped 1933
4/10 American Locomotive Company 4-6-0 September 1906 New for $13,400 Sold for scrap in 1951, scrapped 1952. Built in Scranton, Pennsylvania. Renumbered in 1909. Passenger locomotive.
5 American Locomotive Company 2-8-2T October 1906 New for $15,371 Rebuilt in April 1913 into No. 80. Built in Dunkirk, New York.
6 American Locomotive Company 0-6-0 August 1910 New Sold March 1916. Presumed scrapped. Slopeback tender
7/11 American Locomotive Company 4-6-0 April 1907 New for $13,700. Sold for scrap 1951, scrapped 1952. Renumbered October 1911. Passenger locomotive.
8/20 American Locomotive Company 4-6-0 February 1907 New for $14,975 Sold for scrap 1954. Built in Paterson, New Jersey. Renumbered October 1911. Mixed service.
21 American Locomotive Company 4-6-0 March 1909 New for $13,200. Scrapped March 1952. Tender now used on B.
40 Baldwin Locomotive Works 4-6-0 July 1910 New for $13,139. Active. Passenger locomotive.
80 Nevada Northern 2-8-0 April 1913 Rebuilt from No. 5 Sold for scrap 1951, scrapped 1952. Tender survives. Mixed service locomotive.
81 Baldwin Locomotive Works 2-8-0 March 1917 New for $23,700. Stored inoperable. Mixed service. Last ran in 1960.
90 American Locomotive Company 2-8-0 April 1908 New for $17,525. Sold for scrap 1952. Built in Pittsburgh. Freight locomotive.
91 American Locomotive Company 2-8-0 April 1908 New for $17,525. Sold for scrap January 1952. Built in Pittsburgh. Freight locomotive.
92 American Locomotive Company 2-8-0 October 1908 New for $17,585 Sold for scrap January 1952. Built in Pittsburgh. Freight locomotive.
93 American Locomotive Company 2-8-0 January 1909 New for $17,610 Active. Built in Pittsburgh. Freight locomotive. Originally retired in 1961.
94 American Locomotive Company 2-8-0 January 1910 New for $15,908. Scrapped 1951. Built in Pittsburgh. Freight.
95 American Locomotive Company 2-8-0 May 1914 New for $16,500. Scrapped 1951. Built in Dunkirk. Freight.
96 American Locomotive Company 2-8-0 June 1916 New for $20,125. Scrapped 1951. Built in Dunkirk. Freight.
97 American Locomotive Company 2-8-0 April 1910 Bought second hand for $14,000 (1917). Scrapped 1954 Built in Dunkirk.
401 EMD SD7 August 1952 New Active at Los Angeles Department of Water and Power's Intermountain Power Project Became LADWP No. P-401 in 1980s.
B American Locomotive Company Rotary snowplow November 1907 New Active Built in Paterson, New Jersey.

See also

References

Books

Notes

  1. Elliott, Russell R. 1966. Nevada's Twentieth-Century Mining Boom: Tonopah, Goldfield, Ely. Reno, NV: University of Nevada Press.
  2. Sean Pitts, Curator, East Ely RR Depot Museum. "Mark Requa". Cooperative Libraries Automated Network. Retrieved November 11, 2012.
  3. "Nevada Northern Railway East Ely Complex, Locomotives, and Rolling Stock Recognized as National Historic Landmark" (Press release). Nevada Northern Railway. September 28, 2006. Retrieved May 3, 2012.

External links

Wikimedia Commons has media related to Nevada Northern Railway.