National Broadband Network

This article is about the technologies and rollout of the Australian National Broadband Network. It is not to be confused with the company, nbn.

The National Broadband Network (NBN) is a national wholesale-only, open-access data network and is under development in Australia. It is based on the premise that fixed line and wireless broadband connections are sold to retail service providers (RSP), who then sell Internet access and other services to consumers. The NBN was subject to political and industry debate for a number of years, before construction actually commenced.

The 2013 federal election and subsequent change of government from the Labor Party to the Liberal/National Coalition prompted a strategic review to be commissioned to determine the ideal infrastructure mix to deliver fast broadband across the country as quickly as possible. The review commenced in October 2013 and is due to report to government in December 2013.[1]

In opposition, the Coalition made clear it expected the technology mix could include Fibre-to-the-Node (FTTN) and Fibre-to-the-Building (FTTB) architectures, existing Hybrid Fibre Coaxial (HFC) networks and other privately operated fibre broadband infrastructure, along with the existing NBN Co technologies of Fibre-to-the-Premises (FTTP), satellite and Long Term Evolution (LTE) fixed wireless.[2] Since taking government, the Coalition has not backed away from these intentions, though Communications Minister Malcolm Turnbull has stated he is "thoroughly open" to whatever recommendations the strategic review of the NBN makes in terms of the best technology infrastructure mix.[3]

The redesigned network is currently estimated by the Liberal National Coalition to cost A$29.5 billion in public funding to construct by 2019.[2] The build cost has been a key point of debate. NBN Co, a government-owned corporation, was established to design, build and operate the NBN, and construction began with a trial rollout in Tasmania in July 2010.

The fibre to the premises (FTTP) rollout was planned to reach approximately 93% of premises in Australia by June 2021, but following a change of government, it is now expected to reach an unknown percent of the population. This will be represented by a mix of greenfields (new development) areas where it wouldn't be cost effective to lay new copper, as well as some of the brownfields (established neighbourhoods) areas where the existing copper is deemed to be severely affected by ground water or other factors, or simply where the NBN fibre rollout has already advanced to a point where it wouldn't be cost effective to turn back to copper. Most of Australia's copper network is affected by water due to extensive use of faulty gel for insulation in the past.[4]

As of 3 November 2013, construction of the network has passed 354,793 premises and there are 109,862 active customer services.[5] In areas where the Fibre-to-the-Premises network is being rolled out, FTTP will gradually replace the copper network which is owned by Telstra and currently used for most telephony and data services. As part of an agreement with NBN Co, Telstra will move its customers to the NBN, and lease access to its exchange space and extensive network ducting to assist in the rollout. A similar agreement with Optus is in place. However, the new Liberal National Coalition government is currently considering whether these arrangements will continue as part of its strategic review of the NBN.

Network design

Fibre to the premises

The FTTP network.

Premises within the FTTP footprint are connected using Ethernet over a gigabit passive optical network (GPON) giving a peak speed of one gigabit per second.[6][7] A fibre-optic cable, known as the "drop fibre", goes from the premises to the street ending at the top of a power pole or in an underground pit. The "drop fibre" cable joins a "local network" which links a number of premises to a splitter in the fibre distribution hub.[8] A "distribution fibre"[9] cable connects the splitter in the distribution hub to a fibre access node, which is linked up to a PoI.[8]

Mike Quigley, CEO of NBN Co, said one of the advantages of a GPON network is the distribution hub requires no electronics. He used an example in the United States where a hub was "under water and full of mud" and it continued to function while the fire department used a high pressure hose to clean it.[10] Without electronics, the distribution hub does not require a power supply, nor a battery for power outages. In a GPON network only the local exchanges housing the fibre access nodes and the equipment on premises require a power supply.[10][11]

The FTTP network architecture chosen by NBN Co comprises a number of replicating modules which is combined to make up the FTTP network.[12] A fibre distribution area includes up to 200 premises linked up to a fibre distribution hub. A fibre serving area module comprises 16 fibre distribution areas, which services up to 3,200 premises.[12]

A fibre serving area comprises 12 fibre serving area module connected to a fibre access node, which services up to 38,400 premises. During the 10-year construction, NBN Co plans to build or lease approximately 980 fibre serving areas, servicing up to 37,632,000 premises.[12] Mike Quigley said the modular design will decrease the construction risk of the NBN and allow continuous improvements in the construction, network design and supply chains.[13]

Fixed wireless and satellite

NBN Co wireless outdoor antenna

Approximately 93 per cent of the population was planned to be serviced with fibre to the premises (FTTP),[14] with the remainder serviced by either fixed wireless or satellite technologies.[15] The FTTP build costs for each premises increases with each percentile in the last 7 per cent, because of a low population density.[14] The current funding could only achieve approximately 93 per cent FTTP footprint;[16] however, the FTTP footprint will be expanded where users or communities are willing to pay the incremental costs of installing FTTP.[17]

NBN Co will deploy a 4G Long Term Evolution fixed wireless network covering approximately 4 per cent of the population outside the fibre footprint.[18] The premises in the fixed wireless footprint will be hooked up to an antenna allowing a connection to a wireless base station; the base station links to a PoI via a backhaul.[19][20] The 2.3 GHz and 3.4 GHz spectrums[21] will be used to deliver these fixed wireless services. Unlike the mobile networks, only premises can connect to the NBN's fixed wireless network.[22]

The number of premises assigned to each base station will also be limited.[16] Mike Quigley said the limits will ensure users received a "good service" because of the "high[er] throughput".[16] Users at the edge of the coverage for each base station will receive a peak speed of 12 megabits per second, the speed increases "considerably" moving closer to the base station.[23]

NBN Co is planning to launch two Ka band satellites by 2015, each offering 80 gigabits per second of bandwidth, compared to four to six gigabits per second capacity available from current satellites servicing Australia.[16][24][25] In the interim, NBN Co will use existing satellite to provide six megabit per second to a limited number of premises which currently do not have access to broadband speeds.[16][26] The satellites will be used to bounce signals from a satellite dish on the premises to an earth station, known as a "gateway"; the gateway is then connected to a PoI via a fibre backhaul.[20][27] Mike Quigley said the satellite design was "not easy", because the required coverage is about "five per cent of the world's land mass" containing "at least 200,000 premises" spread across "over 7,000 kilometres" of area between Cocos Islands and Norfolk Island.[16]

Equipment and connectivity

How RSPs and wholesalers connect to the NBN.

Internet access and other services using the NBN are sold to consumers from a retail service provider (RSP),[28] who connects their network to the NBN at a Point of Interconnect (PoI).[29] Mike Quigley has said the "ubiquity and standardisation" is important in the NBN, he continued RSPs will be able to connect to PoIs "using the same BSS processes and interfaces, at the same prices and with the same product constructs as far as is possible across all three technology products".[30]

Layer 2 network access is sold to RSPs,[28] with uniform pricing within each of the three technologies regardless of where the service is delivered and across the technologies for the basic package.[31] To provide this uniform pricing, regional and rural areas will be cross-subsidised with the lower cost metropolitan areas. To prevent other potential providers from undercutting NBN Co in metropolitan areas, new fibre networks are required to be open access and charge similar prices; these rules are known as the "anti-cherry picking" provisions, which were passed into law with other NBN legislation.[32]

When completed the NBN will have 121 PoIs available to RSPs.[33] Originally, NBN Co planned for a more centralised model with only 14 PoIs; however, it was overruled by the Federal Government on the advice from the Australian Competition and Consumer Commission (ACCC). The ACCC considered the plan to be "mission creep" and would have given NBN Co a monopoly over backhaul; however, NBN Co said centralised model would have allowed smaller RSPs to connect without going through a wholesale aggregator.[34] ACCC recommended 121 Pols after public consultation.[33]

Internode criticised the "insane"[35] number of PoIs and after its pricing announcement warned it might have to charge more in regional areas because of the increase costs.[36] In response, Shadow Minister for Communications, Malcolm Turnbull said the "government can't deliver on a crucial promise" of "national uniform pricing"; however, Minister for Communications, Stephen Conroy said we "guaranteed uniform wholesale pricing" not retail pricing.[37]

The NBN will use one of the three technologies to connect the RSP and its network to the network termination device (NTD) on premises. The NTD will allow devices to connect the NBN using the Ethernet or telephone ports.[38] An external source is required to power the NTD, while a battery will supply power for a limited time during power outages. NBN Co will supply a battery during the rollout; however, the end users or their RSP will be responsible for maintenance and replacement of the battery.[39] Mike Quigley said the batteries are the biggest source of complaints from trial users with some users doubting they will ever use the battery. The Federal Government and NBN Co are in talks over the issue.[40] Chinese Telecom manufacturer Huawei were prohibited from bidding by the Australian government[41]

Expected cost

The Rudd Government estimated to the capital expenditure of the project initially to be A$43 billion. NBN Co later revised down the cost in its business plan to A$37.4 billion.[42] The project is to be financed by a combination of a Federal Government investment of A$30.4 billion and private investment for the remainder.[42]

NBN Co intends to begin paying dividends back to the Federal Government in 2021, and to have fully repaid the Government's contribution by 2034.[43] NBN Co's business plan forecasts a return on investment of 7.1%, expecting to turnover revenue of A$23.1 billion by 2021.[44]

Coverage and Priority Policy

Coverage

Coverage maps can be found on the NBN website Rollout Map.

Some of these areas are "brownfield" that have been provided directly by the NBN Co, but many are new "greenfield" areas that are new subdivisions that did not have an existing telephone.[45] All greenfield developments must provide fibre, at a cost to the developer (and thus home owner).[46] Most of the brown field areas are near existing exchanges, which presumably already had ADSL.

The NBN Corporate Plan 2011-2013[47] estimated approximately 13 million premises to be covered by the NBN, 12 million using fibre (FTTP).

BlackSpots

In February 2014 the government produced a new MyBroadband website that provided information about existing access to the internet. It showed that there were 1.6 million premises across Australia which have either no access to fixed broadband or very poor broadband connectivity.[48]

The minister Malcolm Turnbull has said that they would be a somewhat higher priority.[49] However, he has given no explicit direction to the NBN to address them.[50] There is concern that the NBN will continue to focus on areas that already have relatively fast copper broadband, and thus avoid addressing people that have no or very limited broadband for the foreseeable future.[51][49]In May 2014 then NBN announced that it would be targeting premises that were already serviced with fibre by rival TPG.[52]

Retail offers

As of August 2014, there are at least 43 Retail Service Providers for NBN based services.[53] Fibre and fixed wireless plans start from $25[54] per month for the lowest tier of 12/1 megabit per second download/upload speeds and $50 for the highest speed tier of 100/40 megabit per second download/upload speeds.[55]

Implementation

Customer uptake

During the development of the NBN, customer uptake is of great interest to all constituents. The table below tracks this information; it includes all manners of delivery by the NBN, incl. fibre, satellite and wireless.

Date Number total active NBN services Source
Dec 2011 4,000 [56]
Apr 2012 11,000 [57]
Sep 2012 24,000 [58]
Dec 2012 34,500 [59]
Apr 2013 50,000 [60]
June 2013 70,100 [61]
Nov 2013 120,800 [62]
Feb 2015 322,391 [63]

This table tracks fibre roll out specifically:

Date Number premises passed by fibre Number of active fibre services % uptake Source
Dec 2011 18,200 2,315 13% [56]
Sep 2012 32,295 6,400 20% [58]
Dec 2012 72,400 10,400 14% [59]
March 2013 96,060 18,800 20% [64]
June 2013 207,500 33,600 16% [61]

Premises are considered "passed" when “all design, construction, commissioning and quality assurance activities in a FSAM(Fibre Servicing Area Module) have been completed for the Local network and Distribution network”.[61] Certain premises classed as "service class zero" which require extra internal construction such as apartments, town houses, shopping arcades and industrial complexes may not be able to order services, even though their premises has been passed. As of 30 June 2013, 55,700 premises of the 207,500 premises passed were classed as being "service class zero"—being "the Service Class that applies to a Premises that is not NBN Serviceable for the purposes of the NFAS but is in the footprint of the NBN Co Fibre Network."[65]

NBN Co's stated their usage of "premises passed" was an "accepted industry definition".[61] However, their corporate plan defined "premises passed" as places where "NBN services may be ordered and purchased",[66] causing NBN Co to be accused of 'creative accounting'.[67]

Construction delays

The NBN is facing delays due to a lack of skilled fibre splicers in Australia.[68] Some work had to be re-done due to the inadequate training given to many of the workers.[68]

Delays and health concerns occurred in 2013 when work was stopped for several weeks at a number of sites after asbestos was found in Telstra pits.[69][70]

After the 2013 election, the former communications minister Stephen Conroy conceded that the initial rollout plans were "too ambitious" and that there were delays in implementation.[71]

In April 2014, The Australian newspaper(Murdoch media) judged the NBN rollout in Tasmania, its first location, as "shambolic" and "abysmal". [72]

Copper network decommissioning

An agreement with Telstra requires the copper telephone network to be decommissioned in an area 18 months after optic fibre is ready for service. Also new connections must be made to the optic fibre network and not the copper network. In some cases, premises have been left without service due to lengthy delays in establishing NBN connections. Telstra advises the use of the mobile network for phone and internet in these cases.[73][74]

Trial rollout in Tasmania (2010)

The trial rollout in Tasmania, including stage one (in red), two (in yellow), three (in green) and fibre "backbones" (in grey).

Tasmania was selected as the first state[75] to begin the rollout of the NBN, based on the Tasmanian Government's "shovel ready"[76] submission to the RFP for the original NBN.[77] A new company, NBN Tasmania (previously Tasmania NBN Co),[78] was formed on 8 April 2009 to build the NBN in Tasmania.[79] The company was planned to be a joint-venture between NBN Co, Aurora Energy and the Tasmanian Government.[76] The Tasmanian Government also floated an idea to invest A$12.7 million in Aurora Energy to get access to its fibre network; however, the joint-venture and deal were both cancelled on 9 November 2010 when the negotiations reached an impasse.[76][80] Although the joint-venture was cancelled, Aurora Energy still plays a role in the construction of the NBN in Tasmania.[81]

The trial rollout in Tasmania comprises three stages. Stage one was announced on July 2009 with the first customers being connected a year later.[82][83] Stage one included connections to premises in Smithton, Scottsdale and Midway Point[81] and construction of fibre "backbones" from Port Latta to Smithton, Cambridge to Midway Point, Midway Point to Triabunna, George Town to Scottsdale and Scottsdale to St Helens.[84] On completion of stage one, 4,000 premises were offered fibre installation; 51 agreed to be "NBN Ready" (at no cost), but only 10.9% actually took up the service.[85] As of 6 May 2011, 712 premises have an active service and 11 premises are awaiting service activation by a retail service provider (RSP).[81]

The Tasmanian Parliament passed opt-out legislation on 18 November 2010,[86] to allow NBN Co to install fibre connections to premises unless the property owners explicitly decline the installation.[87] The fibre connection is free, however, if the installation is declined and a connection is ordered at a later date, NBN Co may charge a connection fee.[88] The bill passed the Tasmanian lower house with the support of all members.[86]

During his second reading speech, then-Premier of Tasmania David Bartlett said the take-up rates were "a good early result"; however, he said it was "important to increase the participation rate".[88] In his closing remarks, Bartlett said "[the] NBN in Tasmania is a once-in-a-generation opportunity to create jobs and contribute to a new economic direction".[89] In her second reading speech on behalf of the Tasmanian Opposition, Elise Archer said "the NBN is an important infrastructure", but that "the State Liberals have some concern that the NBN business model seems to rely more and more on eliminating competition and other technologies".[90]

Stages two and three were announced on 21 October 2009 and 1 March 2010, respectively. Approximately 11,150 premises in Sorell, Deloraine, George Town, St Helens, Triabunna, Kingston Beach and South Hobart were included in stage two.[91][92] Stage three includes approximately 90,000 premises in Hobart, Launceston, Devonport and Burnie.[93] Stage two will include a trial of expanding the FTTP footprint to areas not included in the initial rollout. The trial will allow individuals and councils to pay the incremental cost of a fibre connection over fixed wireless in order to receive a fibre connection from NBN Co. The costs will include provisioning further space in exchanges and rolling out additional fibre optic cables.[94]

At the time of launch, the access prices for RSPs were temporarily set at a flat rate of A$300 per premises with no ongoing monthly charges.[95] Mike Quigley said one of the reasons for the flat rate is the OSS and BSS systems was not built to make the process automatic. He continued if NBN Co charged a monthly charge without the systems, it would have been a "very manually intensive process" and not a "sensible proposition".[96] However, RSPs did charge a monthly fee to customers, to cover the cost of the trial.[96]

Of the first 4000 residences in Hobart, only 10.9% have actually taken up a service.[85] However, as part of the agreement with Telstra is to decommission the existing copper network as the NBN becomes available, this is not considered as representative of the ultimate NBN adoption by customers.[97]

First release sites (2011)

The first (in red) and second (in green) release sites of the NBN rollout.

Five areas comprising around 14,000 premises were chosen as the "first mainland sites", each representing rollout challenges the NBN was expecting to face during an Australia-wide rollout, with the first services going live on 19 April 2011.[98][99][100] commenced on 17 August 2010,[101][102] Armidale was the first site to officially launch on 18 May 2011 with 2,900 premises included of which 90% did not opt out for connection.[103][104] Kiama Downs and Minnamurra was the second site to officially launch, following Armidale on 29 July 2011. Approximately 2,350 premises were passed, of which 80 per cent did not opt out for installation.[105]

Brunswick had the lowest installation rate at the time of its official 4 August 2011 launch: of the approximately 2,689 premises passed, only 50% opted for installation.[106] Aitkenvale and Mundingburra followed Brunswick on 1 September 2011 with approximately 3,100 premises passed and 63 per cent did not opt out for installation.[107] Willunga was the fifth and final "first release site" to officially launch on 16 September 2011 with approximately 940 premises passed and 91 per cent did not opt out for installation.[108]

These figures are for passive installation of a dark fibre to the premises. To activate it residence need to purchase a service from an RSP.[108] Furthermore, following the low take up rates in Tasmania, the government has adopted an opt-out model in which users are assumed to want the service unless they explicitly opt-out.[109] Thus passive installation figures may be quite different from the proportion of residences that actually use the NBN service.

Second release sites

Fourteen second release sites comprising 54,000 premises in all states and territories were announced on 8 July 2010 with construction commencing in August 2011.[110] The sites comprise premises in Aspley, Bacchus Marsh, Casuarina, Coffs Harbour, Geraldton, Gungahlin, Mandurah, Modbury, Prospect, Riverstone, South Morang, Springfield Lakes, Toowoomba and Victoria Park.[111][112] Telstra had agreed to allow NBN Co to use its exchanges and ducts in the second release sites before the agreement was finalised.

National rollout

Construction of the NBN began with a trial rollout in Tasmania,[75] with the first customers connected in July 2010.[82][83] NBN Co plans to complete the FTTP rollout by June 2021,[113] along with the completion of the fixed wireless[18] and satellite rollout by 2015.[24][25]

Fibre to the premises

In April 2010, NBN Co began a tender for the major FTTP rollout. Fourteen vendors submitted a proposal; however, NBN Co suspended the process on 1 April 2011, as the prices were "unacceptably high".[114] After the suspension, NBN Co entered into an agreement worth up to A$380 million with Silcar on 1 June 2011. The agreement covers the construction of the NBN in Queensland, New South Wales and the ACT by Silcar, a company joint-owned by Siemens and Thiess.[115] The agreement also includes the option of a two-year extension with an additional value of A$740 million.[116]

Fixed wireless

The 2.3 GHz and 3.4 GHz radio spectrums will be used to provide Long Term Evolution fixed wireless covering approximately 4 per cent of the population outside the fibre footprint.[18] NBN Co bought spectrum from Austar for A$120 million in February 2011,[117] with the remaining spectrum covering areas in Western Australia, the Northern Territory, South Australia, outback Queensland and New South Wales were bought on 13 July 2011 for A$1.3 million in an auction by the Australian Communications and Media Authority. NBN Co said the spectrum bought from Austar and in the auction covers "all the geographic coverage it needed" to build its fixed wireless network.[118]

NBN Co signed an initial 12-month contract on 1 June 2011 with Ericsson to design, build and operate the network with options to extend the contract for up to 10 years at a total cost of A$1.1 billion. Construction will commence in 2011, with the first five locations announced as the regional and rural communities surrounding Geraldton, Toowoomba, Tamworth, Ballarat and Darwin.[119] The first services are scheduled to begin in 2012 and completion in 2015.[18]

Satellite services

While the planning continues on the two satellites due to launch by 2015, NBN Co has launched interim satellite services on 1 July 2011, providing up to six megabits per second.[120] Due to the limited satellite capacity, these services were given to customers who did not have access to alternative "metro comparable" services, similar to the Federal Government's Australian Broadband Guarantee (ABG) program which ended on 30 June 2011.[120] The criteria for alternative "metro comparable" services were minimum data speeds of at least 512 kilobits per second, a 3GB per month data allowance and a total price to the end customer of no more than A$2,500 over three years.[26] To provide these services NBN Co bought managed satellite services and satellite capacity from Optus for $200 million and additional satellite capacity from IPstar for A$100 million.[121]

NBN Co has contracted Space Systems/Loral to build and launch two Ka band satellites in 2015 at a total cost of A$2 billion,[122] each offering eighty gigabits per second of bandwidth.[24][25]

Abbott Government Changes (September 2013 onwards)

Following the election,[123] the new communications minister Malcolm Turnbull has announced immediate changes to the government's NBN plans:[124][125] much of the NBN Board was asked to resign;[126] Ziggy Switkowski was appointed new Chairman.[127] Turnbull announced that the FTTP rollout would continue in the short term, with the probability that rollout will be downgraded to "alternative technologies" such as Fibre to the node after a 60-day review was completed.[128]

Telstra responded to the prospect of changes by asserting its intention to retain the $11bn value it generates from the previous government's deal.[129]

On 12 December 2013, the NBN Board appointed Bill Morrow as NBNCo's new CEO, replacing Mike Quigley.[130] Mr. Quigley had announced his intention to resign from NBNCo in July 2013.[131] Morrow resigned from his role as CEO of Vodafone Australia to accept the appointment with NBNCo.

History of policy development

Previous attempts at national broadband networks

Broadband Advisory Group 2003

In a report released on 22 January 2003 the Howard government’s Broadband Advisory Group (BAG) recommended the Federal Government work with other governments and industry stakeholders to form a "national broadband network".[132] A subsequent Senate committee recommend the Federal Government replace the "increasingly obsolete" copper network with a new network based on fibre to the node (FTTN) or alternative technologies.[133]

Telstra Copper Upgrade proposal 2005

On 15 November 2005 Telstra, the owner of the national copper network, announced a plan to upgrade its ageing networks, including a rollout of a fibre to the node (FTTN) network. At the time, the Federal Government was the majority shareholder of Telstra, but the plan did not involve any additional government investment.[134][135] The rollout was later put on hold after the Howard Government refused to exempt the new network from laws requiring third party access, instead saying Telstra could achieve the exemption by applying to the competition regulator, the Australian Competition and Consumer Commission (ACCC).[136][137] Telstra dropped plans for the new network on 7 August 2006, after reaching an impasse in negotiations with the ACCC.[138] Former ACCC chairman, Graeme Samuel later said the proposal was "an illusion on cost and on the capacity to truly deliver high-speed broadband to end users".[139]

Broadband Connect Policy & OPEL Networks 2006/07

In June 2006 the Broadband Connect policy was announced by the Howard Government with an aim of providing greater access to broadband services in rural and regional areas.[140]

OPEL Networks—a 50–50 joint venture between Optus and Elders—was announced on 18 June 2007 as the sole successful bidder in tender.[141] However, on 2 April 2008 Communications Minister Stephen Conroy of the then recently elected Rudd Government, terminated the agreement because OPEL had "failed to meet the terms of [the] contract".[142]

G9 Consortium 2007

Nine telecommunications companies—AAPT, Internode, iiNet, Macquarie Telecom, Optus, PowerTel, Primus, Soul and TransACT, formerly known as G9—proposed its own FTTN network on 20 April 2007,[143] however, it was rejected by the ACCC on 17 December 2007 because of future unknown conditions for access.[144]

Current policy

Initial failed federal government RFP 2007/09

In the run-up to the 2007 federal election, opposition Labor party leaders announced a Labor Government would build a "super-fast" national broadband network, if elected.[145][146]

The network was estimated to cost A$15 billion including a government contribution of A$4.7 billion which would be raised in part by selling the Federal Government's remaining shares in Telstra.[147] After the election, the new Labor Rudd Government issued a request for proposals (RFP) to build the NBN, and six proposals were submitted by Acacia, Axia NetMedia, Optus on behalf of Terria, TransACT and the Tasmanian Government (covering their respective states only), as well as Telstra.[148][149][150][150][151][152]

Telstra’s submission was later excluded[153] leading to warnings that if the project were to go ahead, Telstra would be entitled to compensation estimated at A$15–20 billion[154][155] With the other bidders neither able to meet the government's requirements nor able to raise the necessary capital during the global financial crisis, the RFP was terminated on 7 April 2009.[77]

Current policy announcement April 2009

After terminating its initial RFP, the Rudd Government announced it would bypass the existing copper network by constructing a new national network combining fibre to the premises (FTTP), fixed wireless and satellite technologies.[156]

Tasmania was selected for a trial deployment based on the Tasmanian Government's submission to the RFP.[77]

At the same time, the federal government threatened to force a structural separation of Telstra,[157][158]

Creation of NBN Co April 2009

NBN Co was established on 9 April 2009[159][160] and Mike Quigley was appointed chief executive officer on 25 July 2009,[161] An implementation study was commissioned in April 2009 and released on 6 May 2010 by the Rudd Government.[162] McKinsey & Company and KPMG concluded the NBN can be implemented and made 84 recommendations in the study, including expanding the fibre footprint to 93 per cent from the original 90 per cent.[163]

NBN Co released its business plan on 20 December 2010, including forecasts and network design.[164] A number of changes were made as part of NBN Co’s business plan, including an increase in the peak speed to one gigabit per second,[165] in response to Google Fiber[166] and giving "priority" to regional and rural areas during the rollout following the events after the 2010 election.[167][168]

'National Broadband Network Companies Act 2011'

The Parliament passed the National Broadband Network Companies Act 2011 and a related bill on 28 March 2011[169] with amendments by the Greens and independent senators adopted on 26 March 2011.[170] The amendments centred around transparency, freedom of information and competition concerns, including the adoption of uniform national wholesale prices for NBN connections.[171][172] The Government has required support from the Greens to pass NBN legislation through the Parliament. The Greens have voted in favour of NBN legislation, but have also won support for amendments that make NBN Co subject to freedom of information laws,[173] and that make any proposal to privatise the NBN subject to review by the Parliament and by the Productivity Commission.[174]

The Government has also required the support of other independent and minor party members and senators for NBN legislation. Independent senator Nick Xenophon also supported NBN legislation in the upper house, but only after the government agreed to release a summary of NBN Co's business case.[175]

Agreement with Telstra and Optus 2011

A Cable Pit for access to Telstra's ducts; this infrastructure is used by NBN Co.

NBN Co signed a definitive agreement with Telstra on 23 June 2011 estimated to be worth A$9 billion post-tax net present value,[176] Building upon the signing of a financial heads of agreement a year beforehand.[177] Instead of separating, Telstra agreed to "disconnect"[178] its Internet customers from the copper and hybrid fibre-coaxial networks in areas where FTTP has been installed, and agreed to lease dark fibre, exchange space and ducts to NBN Co. Apart of the agreement, Telstra would not be able to market their mobile network as an alternative to the NBN for a number of years.[176]

This clause is similar to the one in the agreement with Optus over its hybrid fibre-coaxial network estimated to be worth A$800 million post-tax net present value.[179] The ACCC—whose approval is required before both agreements take effect—raised concerns about the clauses being anti-competitive.[180] Both Telstra and Optus would remain the owner of their respective networks.[181] On 18 October 2011, Telstra shareholders overwhelmingly approved the deal.[182]

Responses by stakeholders

Since its announcement, the NBN has received both criticism and praise from politicians, telecommunication companies, businesses and the public. The Coalition initially described the NBN as a "dangerous delusion"[183] and "a white elephant on a massive scale";[184] instead advocating a policy focused on filling "gaps"[185] in the current copper networks where "commercial solutions were not always viable".[186]

Nationals senator Barnaby Joyce said the NBN mirrors a proposal released by their think tank, saying it "delivers a strategic infrastructure outcome" and it is "vitally important that the [NBN] gets to the corners of our country where the market has failed".[187] The Greens said the NBN "is a key piece of 21st century infrastructure".[188] Independent MPs Rob Oakeshott,[189] Tony Windsor,[190] Bob Katter[191] and Andrew Wilkie[192] have expressed support for the NBN. Bob Katter said the NBN is "a great thing for this country".[191] Tony Windsor said the NBN is "too good an opportunity to miss".[190] Family First Party leader Steve Fielding said the NBN will "bring [Australia] up to speed".[193]

Telecommunication companies Optus,[194][195] iiNet,[194][195] Internode,[194] and Vodafone-Hutchison,[195] have expressed support for the project, along with the Australian Internet Industry Association, which said optical fibre solutions are "a critical part in the evolution of the internet".[196] Internode managing director Simon Hackett said he was "glad [the NBN is] going to go ahead".[194] Vodafone-Hutchison CEO Nigel Dews said the NBN will “transform the competitive landscape”.[195] However, other telecommunications companies including AAPT,[197] PIPE Networks[198] and Exetel[199] have expressed opposition to the NBN. AAPT chief executive Paul A. Broad said the NBN will "stifle competition".[197] PIPE Networks founder Bevan Slattery said the NBN is "economically irresponsible".[198] Exetel chief executive John Linton described the NBN as a "political stunt".[199]

Microsoft, Google and Intel have expressed their support for the NBN.[194][195] Google's head of engineering, Alan Noble, said the NBN will "be the greatest enabler of innovation". Intel managing director Philip Cronin said "the NBN has the potential to deliver significant long term benefits".[194] The Swinburne University of Technology conducted a survey of Australian Internet usage for the World Internet Project between September 2009 and October 2009. The survey of 1,000 people asked about Internet usage and how it influences daily life.[200] A question was included asking if the NBN was a "good idea"; 74.5 per cent agreed.[201] In the survey, the NBN had stronger support among younger people and Internet users.[202]

The size of the government investment in the NBN has been a key point of debate. The Coalition called for a cost-benefit analysis, describing the NBN as "a white elephant on a massive scale".[184] The Economist Intelligence Unit (EIU) criticised the NBN as a "huge cost to the public sector",[203]

See also

References

  1. NBN Co (2013-10-17). "Expert consultants to assist with broadband review". Retrieved 2013-11-12.
  2. 2.0 2.1 Liberal Party of Australia (2013-04-01). "The Coalition's Plan for a Fast and Affordable NBN" (PDF). Retrieved 2013-11-12.
  3. LeMay, Renai; Delimiter (2013-09-25). "Policy reversal: Turnbull now ‘thoroughly’ open to FTTP". Delimiter. Retrieved 2013-11-12.
  4. Ross, Nick (19 September 2013). "NBN alternative: Is Australia's copper network fit for purpose?". Australian Broadcasting Commission. Retrieved 12 December 2014.
  5. NBN Co (2013-11-03). "Weekly rollout metrics 3rd November 2013" (PDF). Retrieved 2013-11-12.
  6. Rodgers, Emma (12 August 2010), Big gig: NBN to be 10 times faster, ABC News, retrieved 27 April 2011
  7. NBN Co (15 December 2010), Corporate Plan 2011–2013 (PDF), NBN Co, p. 62, retrieved 1 June 2011
  8. 8.0 8.1 Hansard (16 May 2011), Joint Committee on the National Broadband Network (PDF), Parliament of Australia, pp. 2–3, retrieved 31 May 2011
  9. NBN Co (15 December 2010), Corporate Plan 2011–2013 (PDF), NBN Co, p. 152, retrieved 24 June 2011
  10. 10.0 10.1 Hansard (16 May 2011), Joint Committee on the National Broadband Network (PDF), Parliament of Australia, pp. 18–19, retrieved 31 May 2011
  11. NBN Co (15 December 2010), Corporate Plan 2011–2013 (PDF), NBN Co, p. 73, retrieved 22 June 2011
  12. 12.0 12.1 12.2 NBN Co (15 December 2010), Corporate Plan 2011–2013 (PDF), NBN Co, p. 79, retrieved 24 June 2011
  13. Hansard (16 May 2011), Joint Committee on the National Broadband Network (PDF), Parliament of Australia, p. 4, retrieved 25 June 2011
  14. 14.0 14.1 NBN Co (15 December 2010), Corporate Plan 2011–2013 (PDF), NBN Co, p. 70, retrieved 21 June 2011
  15. NBN Co (15 December 2010), Corporate Plan 2011–2013 (PDF), NBN Co, p. 12, retrieved 1 June 2011
  16. 16.0 16.1 16.2 16.3 16.4 16.5 Hansard (16 May 2011), Joint Committee on the National Broadband Network (PDF), Parliament of Australia, p. 3, retrieved 31 May 2011
  17. Crozier, Ry (29 April 2011), NBN Co to trial paid upgrades in Tasmania, iTWire, retrieved 27 April 2011
  18. 18.0 18.1 18.2 18.3 Corner, Stuart (1 June 2011), Ericsson scores NBN Co wireless contract, with $1.1b potential, iTWire, retrieved 17 June 2011
  19. NBN Co (15 December 2010), Corporate Plan 2011–2013 (PDF), NBN Co, p. 95, retrieved 1 June 2011
  20. 20.0 20.1 Taylor, Josh (18 August 2010), NBN Co calls for design feedback, ZDNet, retrieved 27 April 2011
  21. Australian Associated Press (17 February 2011), Austar soars on NBN spectrum deal, The Sydney Morning Herald, retrieved 27 April 2011
  22. LeMay, Renai (9 September 2010), NBN Co now a wireless play: Slattery, ZDNet, retrieved 27 April 2011
  23. Hansard (22 February 2011), Environment and Communications Legislation Committee Estimates (PDF), Parliament of Australia, p. 26, retrieved 19 June 2011
  24. 24.0 24.1 24.2 Hutchinson, James (30 March 2011), NBN Co seeks solid satellite speeds, Computerworld, retrieved 27 April 2011
  25. 25.0 25.1 25.2 Bingemann, Mitchell (1 June 2010), Satellite operators shortlisted for national broadband network, The Australian, retrieved 27 April 2011
  26. 26.0 26.1 NBN Co (26 May 2011), NBN Co releases Interim Satellite eligibility criteria (PDF), NBN Co, retrieved 23 July 2011
  27. NBN Co (15 December 2010), Corporate Plan 2011–2013 (PDF), NBN Co, p. 96, retrieved 1 June 2011
  28. 28.0 28.1 NBN Co (15 December 2010), Corporate Plan 2011–2013 (PDF), NBN Co, pp. 30–31, retrieved 1 June 2011
  29. Taylor, Josh (22 October 2010), NBN Co pitches interconnect compromise, ZDNet, retrieved 27 April 2011
  30. Hansard (16 June 2011), Environment and Communications Legislation Committee Estimates (PDF), Parliament of Australia, p. 26, retrieved 18 June 2011
  31. Taylor, Josh (26 March 2011), Senate passes NBN Bills with amendments, ZDNet, retrieved 27 April 2011
  32. Taylor, Josh (24 March 2011), NBN amendments clarify cherry-picking, ZDNet, retrieved 27 April 2011
  33. 33.0 33.1 Australian Competition and Consumer Commission (1 March 2011), ACCC announces outcome of NBN points of interconnect confirmation process, Australian Competition and Consumer Commission, retrieved 15 July 2011
  34. Corner, Stuart (20 December 2010), ACCC pans NBN Co's 14 point of interconnect plan, wants 120, iTWire, retrieved 27 April 2011
  35. LeMay, Renai (20 December 2010), Hundreds of POIs 'insane': Hackett, ZDNet, retrieved 23 July 2011
  36. Moses, Asher; Battersby, Lucy (21 July 2011), NBN retail price revealed: up to $189.95/month, The Sydney Morning Herald, retrieved 23 July 2011
  37. Tindal, Suzanne (22 July 2011), We never promised a uniform retail NBN price: Conroy, ZDNet, retrieved 23 July 2011
  38. NBN Co (15 December 2010), Corporate Plan 2011–2013 (PDF), NBN Co, pp. 73–74, 156–157, retrieved 1 June 2011
  39. NBN Co (15 December 2010), Corporate Plan 2011–2013 (PDF), NBN Co, p. 27,73–74, retrieved 22 June 2011
  40. Hutchinson, James (11 October 2011), NBN users complain about battery backup, iTwire, retrieved 14 October 2011
  41. Chinese technology company Huawei banned from bidding in NBN
  42. 42.0 42.1 NBN Co (6 August 2012), Corporate Plan 2012–2015 (PDF), NBN Co, p. 10, retrieved 28 March 2013
  43. NBN Co (15 December 2010), Corporate Plan 2011–2013 (PDF), NBN Co, p. 23, retrieved 20 June 2011
  44. NBN Co (6 August 2012), Corporate Plan 2012–2015 (PDF), NBN Co, p. 71, retrieved 28 March 2013
  45. NBN Glossary
  46. http://www.nbnco.com.au/content/dam/nbnco/documents/nbn-co-3-year-gbe-corporate-plan-final-17-dec-10.pdf
  47. CIO MyBroadband
  48. 49.0 49.1 Blackspots in the dark.
  49. No Rules
  50. NBN Blackspot Lobby
  51. The Register NBN vs TPG
  52. NBN Co - National Broadband Network - Australia | Find a service provider
  53. NBNSP, nbnsp.com.au
  54. NBN Fibre, Wireless, Satelite and Phone Bundle plan comparisons, nbncompared.com.au
  55. 56.0 56.1
  56. 58.0 58.1 NBN Co under fire for take-up numbers | ZDNet
  57. 59.0 59.1
  58. "Failure to launch: technical glitch stops national broadband network's Sydney lift off". AAP. 5 May 2013.
  59. 61.0 61.1 61.2 61.3 http://www.nbnco.com.au/content/dam/nbnco/media-releases/2013/nbn-co-meets-revised-targets.pdf
  60. http://www1.nbnco.com.au/content/dam/nbnco/images/nbnco-rollout-metrics-08122013.pdf
  61. "NBN Co tracks towards full year targets as network transitions to new rollout model". NBN Co. Retrieved 20 April 2015.
  62. http://www.nbnco.com.au/assets/media-releases/2013/press_release_march_rollout_update_2013-15-may-2013.pdf
  63. http://www.nbnco.com.au/assets/documents/customer-installations-briefing-paper-and-request-for-eoi-28-09-12.pdf
  64. "NBN Co rollout map". NBN Co. Retrieved 22 July 2013.
  65. James Hutchinson and David Ramli (2013-07-01). "NBN Co accused of 'creative accounting'". The Australian Financial Review.
  66. 68.0 68.1 The NBN will survive the federal election - The Drum (Australian Broadcasting Corporation)
  67. David Ramli (2013-07-16). "Tasmania’s NBN stymied by asbestos and pay disputes". The Australian Financial Review.
  68. Daniel Bateman (2013-08-06). "Townsville family in fear as NBN workers leave asbestos-lined pit open in their front yard for months". The Courier Mail.
  69. NBN rollout was too ambitious: Stephen Conroy. Brisbanetimes.com.au (2013-10-11). Retrieved on 2013-10-29.
  70. http://www.theaustralian.com.au/technology/rollout-shambles-in-nbns-first-state/story-e6frgakx-1226896452411
  71. Annah Yard (2013-11-18). "Some Tasmanian NBN areas in communication limbo as copper network ends early". ABN News.
  72. Matt Smith (2013-12-16). "Catch 22 denies businesses access to broadband internet". The Mercury.
  73. 75.0 75.1 Australian Associated Press (8 April 2009), Tasmania to get govt broadband first, The Sydney Morning Herald, retrieved 31 May 2011
  74. 76.0 76.1 76.2 Riley, James (9 November 2010), Feds terminate NBN Tassie joint-venture, iTWire, retrieved 27 April 2011
  75. 77.0 77.1 77.2 LeMay, Renai (7 April 2009), No NBN winner: Govt goes FTTH alone, ZDNet, retrieved 27 April 2011
  76. NBN Tasmania, National names index, Australian Securities and Investments Commission, retrieved 5 June 2011
  77. Withers, Stephen (8 April 2009), Tasmania to get first bite of the NBN apple, iTWire, retrieved 6 May 2011
  78. Tung, Liam (11 June 2009), Tassie tips $12.7m in Aurora's NBN, ZDNet, retrieved 27 April 2011
  79. 81.0 81.1 81.2 Hansard (16 May 2011), Joint Committee on the National Broadband Network (PDF), Parliament of Australia, p. 4, retrieved 31 May 2011
  80. 82.0 82.1 Lui, Spandas (3 July 2010), iPrimus: We connected first NBN customer, not Internode, ARNnet, retrieved 27 April 2011
  81. 83.0 83.1 LeMay, Renai; Tindal, Suzanne (2 July 2010), Internode connects first customer to NBN, ZDNet, retrieved 27 April 2011
  82. Smithton, Scottsdale and Midway Point first NBN towns, ARNnet, 26 July 2009, retrieved 27 April 2011
  83. 85.0 85.1 Grubb, Ben (22 October 2010), One in 10 of first 4000 offered sign up for a service on NBN, The Sydney Morning Herald, retrieved 29 May 2011
  84. 86.0 86.1 Tasmanian House of Assembly (18 November 2010), Votes & Proceedings, Parliament of Tasmania, p. 5
  85. Hepworth, Annabel; Bingemann, Mitchell (30 March 2011), "Labor ready to use law to force NBN link-up", The Australian, retrieved 27 April 2011
  86. 88.0 88.1 Bartlett, David (2010), National Broadband Network (Tasmania) Bill 2010: Second Reading Speech (PDF), Parliament of Tasmania, p. 3, retrieved 27 April 2011
  87. Bartlett, David (2010), National Broadband Network (Tasmania) Bill 2010: Second Reading Speech (PDF), Parliament of Tasmania, p. 9, retrieved 27 April 2011
  88. Archer, Elise (18 November 2010), Hansard, Tasmanian House of Assembly, p. 53
  89. Ramli, David (21 October 2009), Stage 2 of Tasmanian NBN announced, ARNnet, retrieved 27 April 2011
  90. Taylor, Josh (28 April 2011), NBN Tasmania second sites announced, ZDNet, retrieved 4 May 2011
  91. Lohman, Tim (1 March 2010), Stage 3 NBN Tasmania announced, Computerworld, retrieved 27 April 2011
  92. Hutchinson, James (29 April 2011), Tasmanian towns trial NBN fibre extension, Computerworld, retrieved 17 June 2011
  93. Tindal, Suzanne (2 September 2010), NBN access pricing still unclear, ZDNet, retrieved 27 April 2011
  94. 96.0 96.1 Hansard (16 May 2011), Joint Committee on the National Broadband Network (PDF), Parliament of Australia, p. 14, retrieved 31 May 2011
  95. LeMay, Renai (13 May 2011), Budget 2011: Turnbull slams off-book NBN, ZDNet, retrieved 20 June 2011
  96. Battersby, Lucy (5 October 2011), Turnbull's electorate put on hold for NBN connection, The Sydney Morning Herald, retrieved 5 October 2011
  97. Crozier, Ry (2 March 2010), NBN Co unveils five national fibre test sites, iTnews, retrieved 27 April 2011
  98. NBN Co (30 September 2011), A new era of broadband service begins in first sites as "trial" end (PDF), NBN Co, retrieved 5 October 2011
  99. Tindal, Suzanne; Australian Associated Press (17 August 2010), NBN mainland construction begins, ZDNet, retrieved 22 June 2011
  100. Hutchinson, James (19 April 2011), Test customers go live on Armidale NBN, Computerworld, retrieved 27 April 2011
  101. Taylor, Josh (18 May 2011), NBN Armidale launches for 7 customers, ZDNet, retrieved 23 May 2011
  102. Taylor, Josh (17 May 2011), Gillard to launch NBN Armidale tomorrow, ZDNet, retrieved 16 June 2011
  103. NBN Co (29 July 2011), Kiama Downs and Minnamurra ready to join NBN (PDF), NBN Co, retrieved 31 July 2011
  104. NBN Co (4 August 2011), National Broadband Network Goes Live in Melbourne (PDF), NBN Co, retrieved 5 August 2011
  105. NBN Co (1 September 2011), Queensland connected to the National Broadband Network (PDF), NBN Co, retrieved 16 September 2011
  106. 108.0 108.1 NBN Co (16 September 2011), National Broadband Network goes live in Willunga (PDF), NBN Co, retrieved 16 September 2011
  107. NBN switches to 'opt-out' model to boost take-up, The Australian, 7 October 2010
  108. Hutchinson, James (3 August 2011), NBN Co reveals second release start dates, iTnews, retrieved 14 October 2011
  109. Crozier, Ry (8 July 2010), NBN Co releases 14 new trial sites, iTnews, retrieved 27 April 2011
  110. Broughall, Nick (8 July 2010), "The Next 19 NBN Rollout Locations Are…", Gizmodo, retrieved 27 April 2011
  111. NBN Co (15 December 2010), Corporate Plan 2011–2013 (PDF), NBN Co, p. 77, retrieved 22 June 2011
  112. Taylor, Josh (1 April 2011), NBN Co halts network construction tender, ZDNet, retrieved 27 April 2011
  113. Taylor, Josh (1 June 2011), Silcar scores $1.1b NBN construction tender, ZDNet, retrieved 17 June 2011
  114. Griffin, Rhonda (1 June 2011), NBN Co & Silcar reach agreement to deliver value-for-money fibre rollout (PDF), NBN Co, retrieved 17 June 2011
  115. Crozier, Ry (17 February 2011), NBN Co buys Austar wireless spectrum for $120m, iTWire, retrieved 4 May 2011
  116. NBN Co (13 July 2011), Spectrum win brings wireless broadband to rural areas starting 2012 (PDF), NBN Co, retrieved 23 July 2011
  117. NBN Co (3 August 2011), First communities for National Broadband Network fixed wireless service unveiled, NBN Co, retrieved 4 August 2011
  118. 120.0 120.1 NBN Co (1 July 2011), NBN Co launches Interim Satellite Service for rural and remote Australians (PDF), NBN Co, retrieved 23 July 2011
  119. Taylor, Josh (6 May 2011), NBN awards $300m interim satellite tender, ZDNet, retrieved 6 May 2011
  120. NBN Co and Space Systems/Loral team up for communications satellites - Computerworld
  121. "Kevin Rudd quits as leader as Tony Abbott storms to victory". The Australian. 9 September 2013.
  122. "Disconnecting NBN a big call for Turnbull". The Australian. 4 October 2013.
  123. "Early 2014 Fibre-to-Node Trials Planned for NBN Co". 20 November 2014.
  124. All but one NBN Co board member hand in resignations - ABC News (Australian Broadcasting Corporation). Abc.net.au (2013-09-23). Retrieved on 2013-10-29.
  125. Ziggy Switkowski confirmed as chairman of NBN Co by Communications Minister Malcolm Turnbull - ABC News (Australian Broadcasting Corporation). Abc.net.au (2013-10-03). Retrieved on 2013-10-29.
  126. "Malcolm Turnbull orders NBN fibre rollout to continue, for now". The Australian. 24 September 2013.
  127. "Telstra's vow on $11bn NBN". The Australian. 16 October 2013.
  128. ""Bill Morrow appointed NBN Co CEO"". www.nbnco.com.au. NBNCo. Retrieved 20 March 2014.
  129. "National Broadband Network CEO Mike Quigley resigns". www.news.com.au (News Corporation). 12 July 2013. Retrieved 20 March 2014.
  130. Broadband Advisory Group (22 January 2003), The Broadband Advisory Group's Report to Government (PDF), Minister for Communications, Information Technology and the Arts, retrieved 17 June 2011
  131. Environment, Communications, Information Technology and the Arts Senate Committee (August 2004), The Australian telecommunications network (PDF), Parliament of Australia, retrieved 17 June 2011
  132. Ferguson, Iain (15 November 2005), Telstra to slash tech costs under review, ZDNet, retrieved 30 April 2011
  133. Maiden, Malcolm (16 November 2005), Telstra dives as $10bn plans unveiled, Melbourne: The Age, retrieved 30 April 2011
  134. LeMay, Renai; Ferguson, Iain (21 December 2005), Telstra says fibre to the node plans on hold, ZDNet, retrieved 30 April 2011
  135. LeMay, Renai (14 December 2005), Clock ticks on Telstra operational separation, ZDNet, retrieved 19 June 2011
  136. LeMay, Renai (7 August 2006), Telstra fibre talks break down, ZDNet, retrieved 30 April 2011
  137. Australian Associated Press (15 June 2011), Telstra broadband plan an 'illusion': ACCC, Melbourne: The Age, retrieved 23 July 2011
  138. New look broadband policy unveiled, The Sydney Morning Herald, 15 May 2006, retrieved 17 June 2011
  139. Australia Connected: Fast affordable broadband for all Australians, Minister for Communications, Information Technology and the Arts, 18 June 2007, retrieved 17 June 2011
  140. OPEL Networks Funding Agreement not to proceed, Minister for Broadband, Communications and the Digital Economy, 2 April 2008, retrieved 17 June 2011
  141. Australian Associated Press (20 April 2007), G9 telcos release Aussie broadband plan, The Sydney Morning Herald, retrieved 19 June 2011
  142. O'Sullivan, Matt (17 December 2007), Regulator rejects G9 plan for a broadband network, The Sydney Morning Herald, retrieved 19 June 2011
  143. Beazley, Kim (15 November 2006), My blueprint for prosperity (PDF), Parliament of Australia, retrieved 17 June 2011
  144. Tindal, Suzanne (2007-03-21), Labor unveils A$4.7 billion broadband plan, ZDNet, retrieved 2011-04-27
  145. Australian Associated Press (21 March 2007), Govt attacks Rudd over broadband plan, The Sydney Morning Herald, retrieved 19 June 2011
  146. Corner, Stuart (26 November 2008), Acacia's NBN promises 100 percent population coverage, iTWire, retrieved 18 September 2011
  147. Tindal, Suzanne (17 November 2008), Axia commits to NBN bid, ZDNet, retrieved 18 September 2011
  148. 150.0 150.1 LeMay, Renai; Tindal, Suzanne (26 November 2008), Terria, Axia, TransACT submit NBN bids, ZDNet, retrieved 18 September 2011
  149. Tindal, Suzanne (26 November 2008), Acacia, Tassie govt confirm NBN bids, ZDNet, retrieved 18 September 2011
  150. LeMay, Renai; Tindal, Suzanne (15 December 2008), Govt kicks Telstra out of NBN tender, ZDNet, retrieved 18 September 2011
  151. Tindal, Suzanne (26 November 2008), Telstra submits non-compliant NBN bid, ZDNet, retrieved 18 September 2011
  152. Long, Stephen (11 April 2011), National Broadband Network, Four Corners, retrieved 27 April 2011
  153. Pauli, Darren (12 June 2009), FttN jettisoned to dodge Telstra compensation, Computerworld, retrieved 27 April 2011
  154. Rudd, Kevin (7 April 2009), Press Conference about the National Broadband Network, Parliament of Australia, retrieved 31 May 2011
  155. Tung, Liam (15 September 2009), Govt to break up Telstra: All the details, ZDNet, retrieved 30 April 2011
  156. Department of Broadband, Communications and the Digital Economy, Telecommunications Legislation Amendment (Competition and Consumer Safeguards) Bill 2009, Parliament of Australia, retrieved 23 June 2011
  157. NBN Co Limited, National names index, Australian Securities and Investments Commission, retrieved 2 June 2011
  158. LeMay, Renai (30 April 2009), NBN company details hard to find, ZDNet, retrieved 1 June 2011
  159. Corner, Stuart (25 July 2009), Mike Quigley to be CEO of NBN Co, iTWire, retrieved 1 June 2011
  160. Lohman, Tim (6 May 2010). "NBN Implementation Study released". Computerworld. Retrieved 12 June 2011.
  161. Sharp, Ari (6 May 2010), Unveiled: plan for cheaper, faster, bigger national broadband network, The Sydney Morning Herald, retrieved 23 June 2011
  162. Taylor, Josh (20 December 2010), NBN business case unveiled, ZDNet, retrieved 19 September 2011
  163. Tung, Liam (19 March 2010), Quigley: NBN Co to deliver 1Gbps, ZDNet, retrieved 12 June 2011
  164. Taylor, Josh (29 April 2011), 1Gbps NBN a response to Google: Quigley, ZDNet, retrieved 19 June 2011
  165. Labor forms minority government, CRN Australia, 7 September 2010, retrieved 18 June 2011
  166. Massola, James (7 September 2010), Broadband, regional package push independents to back Labor after split with Katter, The Australian, retrieved 27 April 2011
  167. NBN bills finally pass lower house, Herald Sun, 28 March 2011, retrieved 18 June 2011
  168. NBN bills passed after marathon session, Sky News Australia, 26 March 2011, retrieved 15 May 2011
  169. Australian Associated Press (2 March 2011), Greens pass NBN FoI amendments through lower house, Computerworld, retrieved 15 May 2011
  170. NBN bills passed in marathon session, ABC News, 26 March 2011, retrieved 18 June 2011
  171. Greens pass NBN FoI amendments through lower house, Australian Associated Press, 2 March 2011, retrieved 20 June 2011
  172. Hepworth, Annabel; Wilson, Lauren (23 November 2010), Julia Gillard runs ruler over National Broadband Network, The Australian, retrieved 20 June 2011
  173. Kelly, Joe; Massola, James (24 November 2010), Nick Xenophon to vote for NBN legislation after PM releases business plan summary, The Australian, retrieved 20 June 2011
  174. 176.0 176.1 NBN Co (23 June 2011), NBN Co and Telstra Sign Binding Definitive Agreements (PDF), NBN Co, retrieved 29 June 2011
  175. Bingemann, Mitchell; Hewett, Jennifer (21 June 2010), Telstra in $11bn NBN deal with Rudd government, The Australian, retrieved 27 April 2011
  176. Hansard (16 May 2011), Joint Committee on the National Broadband Network (PDF), Parliament of Australia, p. 16, retrieved 31 May 2011
  177. NBN Co (23 June 2011), NBN Co and Optus Sign Binding Agreement (PDF), NBN Co, retrieved 29 June 2011
  178. Taylor, Josh (31 August 2011), Telstra wireless ad ban worries watchdog, ZDNet, retrieved 14 October 2011
  179. Hansard (16 May 2011), Joint Committee on the National Broadband Network (PDF), Parliament of Australia, pp. 16, 31, retrieved 31 May 2011
  180. Jacob, Philip (2011-10-18). "Telstra shareholders vote yes on NBN | thetelegraph.com.au". Dailytelegraph.com.au. Retrieved 2011-11-10.
  181. Tindal, Suzanne (7 May 2009), Turnbull slams 'dangerous NBN delusion', ZDNet, retrieved 28 May 2011
  182. 184.0 184.1 Rodgers, Emma (14 September 2010), Abbott orders Turnbull to demolish NBN, ABC News, retrieved 27 April 2011
  183. Smith, Tony; Robb, Andrew (10 August 2010), "Real Action on Broadband" (PDF), Media Release (Parliament of Australia), retrieved 2 June 2011
  184. Australian Associated Press (17 October 2007), Coonan attacks Labor broadband plans, The Sydney Morning Herald, retrieved 19 June 2011
  185. The Nationals' Broadband Network, Barnaby Joyce, 9 April 2009, retrieved 21 June 2011
  186. Ludlam, Scott (1 June 2011), Greens welcome progress on NBN, Australian Greens, retrieved 20 September 2011
  187. Lohman, Tim (7 September 2010), NBN becomes lynchpin in Labor win, Computerworld, retrieved 27 April 2011
  188. 190.0 190.1 Transcript of Tony Windsor's announcement, Melbourne: The Age, 7 September 2010, retrieved 17 July 2011
  189. 191.0 191.1 Hutchinson, James (7 September 2010), Katter backs NBN, but goes with Coalition, Computerworld, retrieved 17 July 2011
  190. Bingemann, Mitchell (31 August 2010), National Broadband Network top priority for independent Wilkie, The Australian, retrieved 20 June 2011
  191. Symons-Brown, Bonny (24 November 2010), Fielding backs NBN, The Sydney Morning Herald, retrieved 20 June 2011
  192. 194.0 194.1 194.2 194.3 194.4 194.5 LeMay, Renai (8 September 2010), Labor wins: industry speaks, ZDNet, retrieved 27 April 2011
  193. 195.0 195.1 195.2 195.3 195.4 Pauli, Darren (8 May 2010), Telcos joined by Google, Intel to applaud NBN Study, Computerworld, retrieved 27 April 2011
  194. Tay, Liz (19 August 2010), IIA throws support behind NBN, iTnews, retrieved 27 April 2011
  195. 197.0 197.1 Freri, Marina (30 March 2011), NBN will stifle competition, says AAPT, Delimiter, retrieved 25 June 2011
  196. 198.0 198.1 LeMay, Renai (20 April 2010), Slattery calls 'bullshit' on NBN economics, ZDNet, retrieved 25 June 2011
  197. 199.0 199.1 Taylor, Josh (31 January 2011), Speaking out: Exetel's view of telco issues, ZDNet, retrieved 12 May 2011
  198. Ewing, Scott; Thomas, Julian (2010), CCi Digital Futures: The Internet in Australia (PDF), Swinburne University of Technology, pp. 49–52, 54, retrieved 15 May 2011
  199. Ewing, Scott; Thomas, Julian (2010), CCi Digital Futures: The Internet in Australia (PDF), Swinburne University of Technology, p. 42, retrieved 15 May 2011
  200. Ewing, Scott; Thomas, Julian (2010), CCi Digital Futures: The Internet in Australia (PDF), Swinburne University of Technology, p. vii, retrieved 15 May 2011
  201. NBN costs taxpayers 24 times South Korea at one tenth the speed: report, The Sydney Morning Herald, 9 February 2011, retrieved 20 June 2011

External links

Wikimedia Commons has media related to National Broadband Network.