Nanjing-Anqing Intercity Railway 宁安城际铁路 |
---|
Overview |
---|
Type |
High-speed rail |
---|
Status |
Under construction |
---|
Locale |
Nanjing to Anqing (Anhui), People's Republic of China |
---|
Operation |
---|
Opening |
July 2014 (projected) |
---|
Technical |
---|
Line length |
257 kilometres (160 mi) (main line) |
---|
Track gauge |
1,435 mm (4 ft 8 1⁄2 in) |
---|
Operating speed |
250 km/hr |
---|
The Nanjing–Anqing Intercity Railway Chinese: 宁安城际铁路 is an under-construction high-speed rail, passenger-dedicated line between cities of Nanjing, Jiangsu Province and Anqing, Anhui Province, in China.[1][2][3][4]
As of mid-2012, the 257 km line was scheduled to be completed by July 2014.[5]
This railway will become a branch of the Beijing–Shanghai High-Speed Railway. The route will run parallel to the Yangtze River, and will pass through Ma'anshan, Wuhu, Tongling, and Chizhou.[6] 33 km of the railway will be located in Jiangsu, with 225 km in Anhui.[7]
The total investment is predicted to be 25.702 billion RMB, provided by the Railway departments of Jiangsu province and Anhui province. The railway is expected to take 4.5 years to complete.[7]
Most of the line runs along the southern bank of the Yangtze, but Anqing is located on the northern side of the river. The Anqing Railway Bridge is being constructed 22 km before the Anqing station. The bridge will also serve the Fuyang-Jingdezhen Railway. As of October 2012, it is expected that the main span of the bridge will cross the river by the end of the year, and the bridge fully completed by May 2013.[8]
Operation
The capacity is estimated to be about 125 pairs of trains each day.[7] The trains will have a top speed of 250 kilometers per hour,[9] with the entire journey taking 90 minutes. The current travel time between the two cities is 8 hours.[10] It will also allow passengers to travel between Anqing and Shanghai in 3 hours, compared to the current 12 hours. This new railway will be connected to the Yangtze River Delta region's railway network.[9][11]
Trains are expected to be in service each day from 06:00 to 12:00. 60 pairs of trains will be in operation with a minimum interval between trains of 4 minutes, and an average interval of 15 minutes.[12]
The cost to passengers will be 0.4 to 0.5 RMB (4 to 5 mao) per kilometre.[12]
Stations
A total of 11 stations are being constructed.[7][12]
See also
References
External links
|
---|
|
- Nanjing South
- Jiangning
- Ma'anshan
- Dangtu
- Wuhu
- Wuhu South
- Fanchang
- Tongling East
- Mount Jiuhua
- Chizhou
- Anqing
| |
|
|
---|
| Bohai Rim Jingjin-RT | BCR (Beijing CityRail) | In operation | |
---|
| Under construction | |
---|
| Planned | |
---|
|
---|
| Tianjin (u/c) | |
---|
| Intercity | In operation | |
---|
| Under construction | |
---|
|
---|
|
---|
| Yangtze River Delta (YRD-RT) | Shanghai | |
---|
| Nanjing | In operation | |
---|
| Under construction | |
---|
| Planned |
- Nanjing–Ma'anshan (S2)
- Nanjing–Chuzhou (S4)
- Nanjing–Yizheng (S5)
- Nanjing–Jurong (S6)
- Nanjing–Lishui (S7)
|
---|
|
---|
| Suzhou (planned) | |
---|
| Ningbo (planned) |
- Ningbo–Yuyao (S1)
- Ningbo–Cixi (S2)
- Ningbo–Fenghua (S3)
|
---|
| Wuxi (planned) |
- Wuxi–Jiangyin
- Wuxi–Yixing
|
---|
| Intercity | In operation | |
---|
| Under construction | |
---|
| Planned | |
---|
|
---|
|
---|
| Pearl River Delta (PRD-RT) | In operation | |
---|
| Under construction | |
---|
|
---|
| Central (Huazhong) | Wuhan CityRail | In operation | |
---|
| Under construction | |
---|
|
---|
| Central Plains CityRail | In operation | |
---|
| Under construction |
- Zhengzhou–Jiaozuo
- Zhengzhou–Xuchang
|
---|
| Planned |
- Zhengzhou–Luoyang
- Zhengzhou–Xinxiang
|
---|
|
---|
| Changsha CityRail | Under construction | |
---|
| Planned |
- Changsha–Yiyang–Changde
- Changsha–Liuyang
|
---|
|
---|
|
---|
| West Triangle | Chengdu CityRail | In operation | |
---|
| Under construction |
- Jiangyou–Mianyang–Chengdu–Leshan
- Mianyang–Suining–Ziyang–Neijiang–Zigong–Yibin
|
---|
| Planned | |
---|
|
---|
| Chongqing CityRail (u/c) |
- Chongqing–Yongchuan–Rongchang (S1)
- Chongqing–Hechuan (S2)
- Chongqing–Wanzhou (S3)
- Chongqing–Changshou–Fuling (S4)
- Chongqing–Qijiang (S5)
- Chongqing–Jiangjin (S6)
|
---|
| Xi'an CityRail | Under construction | |
---|
| Planned |
- Xi'an–Lantian
- Xi'an–Weinan
- Xi'an Xianyang Airport–Famensi
- Xi'an–Zhouzhi
- Xi'an–Fuping
- Xi'an–Tongchuan
|
---|
|
---|
| Intercity (u/c) | |
---|
|
---|
| Northeast (Dongbeil) | Changchun & Jilin City | In operation | |
---|
| Under construction | |
---|
|
---|
| Harbin | Under construction | |
---|
| Planned | |
---|
|
---|
| Shenyang CityRail | In operation | |
---|
| Under construction | |
---|
| Planned |
- Shenyang–Liaoyang–Anshan
- Shenyang–Fuxin
- Shenyang–Tongliao
- Shenyang–Panjin
- Shenyang–Benxi
|
---|
|
---|
| Dalian (u/c) | |
---|
|
---|
| Other Regions | Kunming CityRail | In operation | |
---|
| Under construction |
- Kunming–Kunyang
- Kunming–Anning
- Kunming–Songming
|
---|
|
---|
| Lanzhou CityRail (planned) |
- Lanzhou–Zhongchuan (4)
- Lanzhou–Yuzhong (5)
- Lanzhou–Shichuan–Qingcheng (6)
|
---|
| Wenzhou Rail Transit | Under construction | |
---|
| Planned | |
---|
|
---|
| Hainan | In operation | |
---|
| Under construction | |
---|
|
---|
|
---|
| Others | In operation | |
---|
| Under construction |
- Zhangjiakou–Datong
- Xiamen–Quanzhou–Zhangzhou (S1)
- Dongsheng–Ordos Airport
|
---|
|
---|
| |
|
|
---|
| | | |
---|
| 4 North-South National HSR grid | |
---|
| 4 East-West National HSR grid | |
---|
| Other | |
---|
| Intercity (200-250 km/h) | |
---|
| Intercity (300-350 km/h) | |
---|
| Upgraded lines | |
---|
| Rolling stock | |
---|
|
| |
- Italics - under construction or currently not operational
- § - in/related to the special administrative regions
|
|
|
---|
| | | Technologies | |
---|
| High-speed trains (category) | 300 km/h (186 mph) or more |
- AGV
- AVE Class 100, 102, 103
- CRH 2C, 3C, 380A, 380B, 380C, 380D
- ETR 500
- Eurostar TGV
- Eurostar Velaro
- ETR 1000
- ICE 3
- KTX-I, II (Sancheon)
- Oaris
- Shinkansen Series 500, N700, E5, E6, H5, L0
- AVRIL
- TGV Sud-Est (refurbished), Atlantique, Réseau, Duplex, POS, 2N2
- Thalys PBA, PBKA
- THSR 700T
- Transrapid
- Shanghai Maglev Train
- Velaro
- Bombardier Zefiro
|
---|
| 250–299 km/h (155–186 mph) |
- China Railways CRH 1A, 1B, 1E, 2A, 2B, 2E
- New Pendolino
- ICE 1, 2
- RENFE Class 120, 121, 130
- Sapsan
- Shinkansen Series 200, 300, 700, 800, E2, E3, E7, W7
- TCDD HT65000
- TGV Sud-Est (original), La Poste
- V250
- Zefiro 250
|
---|
| 200–249 km/h (124–155 mph) | |
---|
| Experimental and prototype high-speed trains (category) |
|
---|
| High-speed railway line (category) |
- List of high-speed rail lines
|
---|
| By country
planned networks in italics | |
---|
|
|
---|
| | | Overviews | |
---|
| Geography | |
---|
| Attractions | |
---|
| Culture | |
---|
| Dialects | |
---|
| Education | |
---|
| |
|