Metacom (YTB-829)
Metacom (YTB-829) forward of Negwagon (YTB-834), assists in mooring the nuclear-powered attack submarine ex-Nautilus (SSN-571) upon her arrival at pier 33, Naval Submarine Base, New London, 6 July 1985. | |
Career | |
---|---|
Awarded: | 5 June 1973 |
Builder: | Marinette Marine, Marinette, Wisconsin |
Laid down: | 13 November 1973 |
Launched: | 19 June 1974 |
In service: | 21 September 1974 |
Struck: | 5 January 2001 |
Fate: | transferred to the Army Corps of Engineers, 5 January 2001 |
General characteristics | |
Class and type: | Natick-class large harbor tug |
Displacement: | 283 long tons (288 t) (light) 356 long tons (362 t) (full) |
Length: | 109 ft (33 m) |
Beam: | 31 ft (9.4 m) |
Draft: | 14 ft (4.3 m) |
Speed: | 12 knots (14 mph; 22 km/h) |
Complement: | 12 |
Armament: | None |
Metacom (YTB-829) was a United States Navy Natick-class large harbor tug.
Construction
The contract for Metacom was awarded 5 June 1973. She was laid down on 13 November 1973 at Marinette, Wisconsin, by Marinette Marine and launched 19 June 1974.
Operational history
Metacom served at Naval Submarine Base New London. Stricken from the Navy List 5 January 2001, ex-Metacom was transferred to the Army Corps of Engineers where she was renamed Demolen.[1]
References
- This article includes information collected from the Naval Vessel Register, which, as a U.S. government publication, is in the public domain. The entry can be found here.
External links
- Photo gallery of Metacom (YTB-829) at NavSource Naval History
Wikimedia Commons has media related to USS Metacom (YTB-829). |