Marina Bay MRT Station
NS27 CE2 TE20 Marina Bay MRT Station 滨海湾地铁站 மரீனா பே Stesen MRT Marina Bay | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||||||||||||
Exit A of Marina Bay MRT station. | |||||||||||||||||||||
Location |
21 Park Street 23 Park Street Singapore 018925 / 018926 | ||||||||||||||||||||
Coordinates | 1°16′33.95″N 103°51′16.83″E / 1.2760972°N 103.8546750°E | ||||||||||||||||||||
Operated by | SMRT Trains (SMRT Corporation) | ||||||||||||||||||||
Line(s) | |||||||||||||||||||||
Platforms |
Island (North South & Circle Lines) Stacked side (Thomson-East Coast Line) | ||||||||||||||||||||
Tracks | 4 | ||||||||||||||||||||
Connections | Bus, Taxi | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Structure type | Underground | ||||||||||||||||||||
Platform levels | 2 | ||||||||||||||||||||
Disabled access | Yes | ||||||||||||||||||||
Other information | |||||||||||||||||||||
Station code | NS27 CE2 TE20 | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened |
4 November 1989 (North South Line) 14 January 2012 (Circle Line) 2021 (Thomson-East Coast Line) | ||||||||||||||||||||
Services | |||||||||||||||||||||
| |||||||||||||||||||||
Location | |||||||||||||||||||||
|
Marina Bay MRT Station (NS27/CE2/TE20) is an underground Mass Rapid Transit station on the North South Line and Circle Line in Singapore. It was the southern terminus of the former until late November 2014, and once in a while occasion like Christmas Day and Chinese New Year 1st day, trains will usually terminate at Marina Bay. The Circle Line station was awarded the winner of Small Project Award at the World Architecture Festival in 2012.[1]
When the Thomson-East Coast Line side of the station opens in 2021, Marina Bay will be a triple-line interchange station, similar to Dhoby Ghaut and Outram Park.
History
The station is located on a reclaimed land with no developed infrastructure surrounding it, and hence contrary to what the name implies, there exists a slight distance between the actual town of Marina Bay and the station. This station is now used for locals to travel from other parts of Singapore and connects passengers to a bus service that brings them to a nearby recreational area.
On 8 January 2006, this station was one of the four stations that participated in Exercise Northstar V.
Since the opening of the Circle Line platforms, this station is the first underground station in the Singapore MRT to have its platform above the concourse level.
Ground freezing will be applied for the first time in Singapore rail construction when building the Thomson-East Coast Line part of this station, where it under-cross the existing North-South Line and Circle Line tunnels.[2]
Station layout
L1 | Street Level | Marina Bay Mall (future) |
B1 | ||
NSL Concourse | Faregates, Ticketing Machines, Station Control | |
Restricted Area | Temporary Maintenance Facility | |
Platform A | Circle Line towards CC6 Stadium via CE1 DT16 Bayfront (→) | |
Island platform, doors will open on the right | ||
Platform B | Circle Line towards CC6 Stadium via CE1 DT16 Bayfront (→) | |
B2 | ||
CCL Concourse | Transfer Hall, Faregates, Ticketing Machines, Station Control, Shops | |
Platform A | North South Line towards NS1 EW24 Jurong East via NS26 EW14 Raffles Place (→) | |
Island platform, doors will open on the right | ||
Platform B | North South Line towards NS1 EW24 Jurong East via NS26 EW14 Raffles Place (→) (Only during Christmas Day and on first day of Chinese New Year)
North South Line towards NS28 Marina South Pier (←) |
Exits
- A: Bayfront Avenue Taxi Stand
- B: 500m walk to Downtown MRT Station
At present it is one of the secluded stations that does not receive high demand except for passengers transferring from the Circle to the North South line (Marina South Pier -> Bayfront). The other secluded station is Marina South Pier.
Transport connections
Rail
Destination | First Train | Last Train | ||||
---|---|---|---|---|---|---|
Mon – Sat | Sunday & Public Holiday | Daily | ||||
North South Line | ||||||
to NS1 Jurong East | 6.01am | 6.29am | 11.17pm | |||
to NS28 Marina South Pier | 5.59am | 6.24am | 12.00am | |||
to NS7 Kranji | - | - | 12.07am | |||
Circle Line | ||||||
to CC6 Stadium | 5.59am | 6.24am | 11.55pm |
Gallery
References
- ↑ "World Architecture Festival Winners 2012". EMAP publishing. Retrieved 14 July 2014.
- ↑ "Ground freezing first for Singapore rail project". TunnelTalk. 2 July 2014. Retrieved 18 December 2014.