Manchester Airport station

Manchester Airport National Rail Manchester Metrolink
Location
Place Ringway
Local authority Manchester
Grid reference SJ819853
Operations
Station code MIA
Managed by First TransPennine Express
Number of platforms

5 + 1 under construction

(3 + 1 Network Rail, 2 Metrolink)
DfT category B
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2004/05   1.576 million
2005/06 Increase 1.799 million
2006/07 Increase 1.960 million
2007/08 Increase 2.159 million
2008/09 Increase 2.710 million
2009/10 Decrease 2.620 million
2010/11 Increase 2.769 million
2011/12 Increase 3.166 million
2012/13 Decrease 3.137 million
2013/14 Increase 3.322 million
Passenger Transport Executive
PTE Transport for Greater Manchester
History
May 1993 Opened
2004 Refurbished
2008 Third platform opened
2014 Metrolink services begin
National Rail – UK railway stations
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Manchester Airport from Office of Rail Regulation statistics. Methodology may vary year on year.
UK Railways portal

Manchester Airport is a railway station at Manchester Airport, England opening together with a second terminal in 1993. Manchester Metrolink tram services were extended to the Airport in November 2014.

Description

The station is 9 34 miles (15.7 km) south of Manchester Piccadilly at the end of a short branch from the Styal Line. A branch of Manchester Metrolink runs into it. It is accessed via a triangular junction located between Heald Green and Styal. The station platforms are connected by escalator, elevator, ramps and an elevated covered walkway (known as the "Sky Link") to the airport terminal buildings in which is a manned railway ticket office. Throughout the airport complex, the railway station is known as "The Station" and is signposted as such.

History

In December 2008, a third platform opened after a year of construction and a total cost of £15 million. The following year Network Rail noted that it had "greatly increased operational flexibility at the station, and reduced the number of times that late-running trains had had to be terminated at Manchester Piccadilly."[1]

In 2009, Network Rail stated that the creation of the third platform has meant that the capacity at Manchester Airport will become constrained by the layover of the trains and congestion at the throat. To solve this issue they have recommended building a line underneath the airport towards Northwich in the 2019 to 2024 period.[2]

In July 2012, support for a fourth rail platform was announced by the Government; it was expected to be completed by December 2018.[3] The current platforms are eight carriage lengths long, so each can accommodate two trains of four carriages. A fourth platform will allow greater use of longer trains of six carriages or more. This had been recommended as part of the Northern Hub scheme of rail improvements around Manchester by the 2010 Manchester Hub Rail Study and the 2011 Northern Route Utilisation Strategy, with an estimated cost of £23 million.[4] It will be constructed between the existing three platforms and the bus station building.[5]

On 28 January 2013, the Government announced that Manchester Airport would be included in the second phase of the High Speed 2 railway line. This will enable Manchester Airport to be reached from London Euston in 59 minutes. The new line and associated new station will pass to the west of the Airport, away from the existing railway station and transport interchange.[6]

In February 2014, construction commenced on a new £20m fourth platform at the station. The start of construction was attended by the Chancellor of the Exchequer, George Osborne. Construction of the new platform is expected to be completed by the end of May 2015 - three years earlier than the 2018 estimate given in 2012.[7][8]

National Rail services

First TransPennine Express Class 185 on platform 2 (was 1a) arriving from Manchester Piccadilly

Northern Rail, First TransPennine Express and Arriva Trains Wales are the three current franchise holders that serve Manchester Airport. Services between the airport and Crewe (for connections to Southern England); Manchester Piccadilly; various destinations throughout Northern England and, since December 2007, to Glasgow Central and Edinburgh Waverley via Carlisle.

There is a frequent service from the airport to Manchester Piccadilly. Services also operate during the night to Manchester Piccadilly and beyond including York; Doncaster; Sheffield; Scotland and Blackpool North.

There are currently nine trains per hour to Manchester Piccadilly. There are no long distance services to the airport from the south; a Central Trains service from Manchester Airport to Skegness via Derby was cut back to Crewe in 2003.[9]

There are also 3 trains per day to Chester via Warrington Bank Quay (of which one continues to Llandudno, operated by Arriva Trains Wales).

Infrastructure developments that are part of the Northern Hub system of schemes should allow direct trains to Manchester Victoria and on towards Bradford from December 2016.

Manchester Metrolink

 Manchester Airport
Metrolink

Metrolink extension plans
Location
Place Ringway
Local authority City of Manchester
Fare zone information
Metrolink Zone S
Present status In operation
History
Opened 3 November 2014
UK Trams portal

The Manchester Metrolink light rail network was extended from St Werburgh's Road to Manchester Airport as part of the Phase 3 expansion project.[10] The Metrolink station has been built adjacent to the airport station.[11]

Metrolink platforms

Following a period of uncertainty due to funding problems, the plans were finally given the go-ahead in May 2009. The confirmed route will not complete the full airport loop as proposed, but trams will run along the northern route via Wythenshawe. Completion of the western side of the loop would be subject to further funding in a later project.[12][13] An opening date of Summer 2016 had originally been indicated for opening of the Airport line[14] but in June 2014 it was announced that the line would open early on 3 November 2014, and so it did open.[15][16]

Services

Trams run between Manchester Airport and Cornbrook every 12 minutes. When the Second City Crossing opens, services will run through the city centre.[17]

References

  1. Connecting local communities: Route Plan 2009 for Route 20 - North West Urban, Network Rail, 2009; page 6
  2. Connecting local communities: Route Plan 2009 for Route 20 - North West Urban, Network Rail, 2009; page 27
  3. Historic day for Greater Manchester's rail network, Transport for Greater Manchester, 16 July 2012
  4. Manchester Hub Rail Study, Network Rail, February 2010
    Northern Route Utilisation Strategy, Network Rail, May 2011, page 7 and pp. 55-56
  5. Northern RUS consultation response, Manchester Airport Group, January 2011
  6. https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/69079/hs2-msg-ma0-zz-dr-rt-52805.pdf
  7. "Chancellor unveils the start of £600m rail investment in the north of England". Network Rail. 7 February 2014. Retrieved 2014-04-04.
  8. "Manchester Airport station reopens after work to build a fourth platform is completed (news release)". Network Rail. 9 February 2015. Archived from the original on 13 February 2015. Retrieved 13 February 2015.
  9. "Train services to be cut". BBC News. 17 February 2003.
  10. "Metrolink Future Network" (PDF). GMPTE. 2006. Retrieved 2008-12-28. - map of the proposed network expansion
  11. "Metrolink Network - proposed South Manchester & Manchester Airport extension (map)". GMPTE. 2005. Retrieved 2009-05-21.
  12. "Metrolink: back on track?". BBC Manchester. 2009-05-13. Retrieved 2009-05-17.
  13. Linton, Deborah (2009-05-13). "£1.4bn transport deal unveiled". Manchester Evening News. Retrieved 2009-05-17.
  14. "Airport line". Manchester Metrolink. Transport for Greater Manchester. Retrieved 19 May 2013.
  15. "Trams to Manchester Airport to arrive more than A YEAR early". Transport for Greater Manchester. Retrieved 20 June 2014.
  16. http://www.manchestereveningnews.co.uk/news/greater-manchester-news/new-metrolink-line-wythenshawe-manchester-7927130 New Metrolink line to Wythenshawe and Manchester Airport to open on November 3 – a year ahead of schedule] Manchester Evening News 13 October 2014
  17. "Trams to Manchester Airport to arrive more than A YEAR early". Transport for Greater Manchester. Retrieved 20 June 2014.

External links

Wikimedia Commons has media related to Manchester Airport station.
Preceding station   National Rail   Following station
TerminusFirst TransPennine Express
North TransPennine
Manchester Piccadilly
TerminusFirst TransPennine Express
TransPennine North West (Manchester-
Barrow/Preston/Blackpool/Windermere)
TerminusFirst TransPennine Express
TransPennine North West
(Manchester-Scotland/Manchester Piccadilly)
Manchester Piccadilly
TerminusFirst TransPennine Express
South TransPennine
TerminusNorthern Rail
Manchester Airport-Southport/Liverpool Lime Street
Manchester Piccadilly
TerminusArriva Trains Wales
Llandudno/Chester-Manchester Line
Limited Service
Manchester Piccadilly
Northern Rail
TerminusNorthern Rail
Preceding station   Manchester Metrolink   Following station
TerminusManchester Airport - Cornbrook Line
towards Cornbrook
  Under Construction  
TerminusManchester Airport Line
towards Manchester Victoria

Coordinates: 53°21′54″N 2°16′23″W / 53.36500°N 2.27306°W