MBTA Commuter Rail

MBTA Commuter Rail
COMMUTER RAIL

MBTA Commuter Rail system map

Reporting mark MBTX
Locale Eastern Massachusetts and Rhode Island
Dates of operation 1964 (beginning of MBTA subsidies)
1973 and 1976 (MBTA asset purchases)
1981 (full consolidation)
Track gauge 4 ft 8 12 in (1,435 mm) (Standard gauge)
Length 394 miles (634 km)
Headquarters Boston, MA, USA
Website MBTA.com

The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's transportation coverage of Greater Boston in the United States. It is operated under contract by Keolis, which took over operations on July 1, 2014 from the Massachusetts Bay Commuter Railroad Company (MBCR).

The system is the sixth-busiest commuter rail in the U.S., behind New York, Chicago, and Philadelphia area systems, and is tied for fifth-busiest with Philadelphia's SEPTA Regional Rail in terms of weekday ridership. The line's characteristic purple-trimmed coaches operate as far south as North Kingstown, Rhode Island, and as far north as Newburyport and as far west as Worcester, both in Massachusetts. Trains originate at two major terminals in BostonSouth Station and North Station — both transportation hubs offering connections to Amtrak, local bus and subway lines. In the third quarter of 2014, daily weekday ridership was 129,800.[1]

Current lines

MBTA Commuter Rail system, circa 2012

The following lines terminate at South Station (listed from southeast to west):[2]

The following lines terminate at North Station (listed from west to northeast):[2]

Operational history

Consolidation under MBTA control

Boston & Maine Railroad

The Commonwealth of Massachusetts's involvement with the operating facets of commuter rail began in 1967 when the Boston & Maine Railroad (B&M petitioned the Interstate Commerce Commission to discontinue all passenger services.[3] Service north of the state line was discontinued, but most service in Massachusetts was preserved through a contract between the Commonwealth and the B&M, at this time still an independent railroad company. The Commonwealth and MBTA began to purchase several lines, like the Lowell Line between Somerville and Wilmington, from the B&M.

In 1969 the B&M transported 24,000 passengers every weekday on four separate routes. Its yearly deficit was US$3.2 million. A pool of 86 Budd Rail Diesel Cars protected the service.[4] B&M filed for bankruptcy protection in 1970. All remaining B&M commuter assets with the exception of yard tracks and freight-only branches were sold to the Commonwealth on December 14, 1976, though B&M was contracted to operate the service using its existing fleet of diesel railcars.[3]

New York, New Haven & Hartford Railroad

The New York, New Haven & Hartford Railroad (NH, short for "New Haven"), the long-time operator of most South Station commuter trains, filed for bankruptcy for the last time in 1961. Two years earlier in 1959, NH discontinued passenger service on the Old Colony division in southeastern Massachusetts. NH was included in the Penn Central Transportation Company (PC) merger in 1968, which itself filed bankruptcy in 1970.[5] MBTA purchased many PC southside commuter lines on January 27, 1973, including the Providence/Stoughton Line as far as the Rhode Island border plus the branch to Stoughton, the Franklin Line and Needham Line and the Framingham/Worcester Line from Riverside to Framingham, as well as a number of abandoned lines and lines without passenger service including the Old Colony mainline from Boston to Braintree and the Plymouth/Kingston Line (which were later restored).[3] PC merged into Conrail on April 1, 1976; the MBTA bought the equipment but Conrail took over operations of the southside lines. The MBTA also purchased the Fairmount Line to restore it for passenger service as a bypass during Southwest Corridor (Boston) reconstruction.[3]

New York Central Railroad

The Framingham/Worcester Line, historically part of the Boston & Albany Railroad (B&A), was merged into the New York Central Railroad (NYC) and its ownership subsequently passed to PC in 1968. As part of the Massachusetts Turnpike Boston Extension's construction in the 1960s, the Worcester Line's roadbed between Route 128 and Boston was sold to the Massachusetts Turnpike Authority, with the proviso that the control of the railroad remain with NYC. Conrail inherited the line which formed a vital freight artery between Boston's Beacon Yard and Conrail's Selkirk Yard. The Riverside-Framingham section was sold to the MBTA in 1976 as part of their larger acquisition of PC commuter assets, but the section past Framingham remained in Conrail control.[3] In September 2009, Conrail successor CSX Transportation and the Commonwealth finalized a $100 million agreement to purchase CSX's Framingham to Worcester tracks, as well as the Grand Junction Railroad plus lines which will be part of the South Coast Rail project, to improve service on the Framingham/Worcester Line.[6] After several years of construction and negotiations, ownership of the line was transferred to the commonwealth on October 4, 2012, with increased service on the outer section of the line beginning several weeks later.[3][7]

Combined operations

The Northeast Rail Service Act of 1981 compelled Conrail to transfer operations of all passenger and commuter services to local transit authorities, resulting in Conrail ceasing all subsidized passenger rail services.[8] B&M won the contract for the southside lines; for the first time, all Boston commuter service was operated by one entity. After bankruptcy, B&M continued to operate trains under the protection of the federal bankruptcy court, in the hopes that a reorganization could make it profitable again. It emerged from the court's protection when Timothy Mellon's Guilford Transportation Industries (GTI) bought it in 1983.[3] GTI let the contract expire in 1987, after a bitter strike had shut down most of the northside lines in 1986.[3]

Logo of Keolis Commuter Services, the current operator of MBTA Commuter Rail. This logo appears on employee uniforms and public timetables.

From 1987 to 2003, Amtrak managed all of Boston's commuter rail.[3] The relationship between MBTA and Amtrak was often rocky, and Amtrak did not submit a bid when the contract expired in 2003. MBTA observers saw Amtrak as having been a reliable manager and operator, but Amtrak sometimes experienced strained relations with the MBTA. Quibbles centered on equipment failures, crewing issues about the number of conductors per train, and responsibility for late trains. Because of these issues, and Amtrak's repeated statements that the MBTA contract was unreasonable, few were surprised at Amtrak's decision not to bid again.[9]

Two tenders were submitted, one from GTI and another from the newly formed Massachusetts Bay Commuter Railroad Company (MBCR), a partnership between Connex (later Veolia), Bombardier Transportation and Alternate Concepts, Inc., the latter of which won the tender. MBCR took over the MBTA Commuter Rail operation from Amtrak in July 2003. The MBCR contract originally expired in July 2008 but had an additional five-year option; it was later extended three years to July 2011 and then another two to July 2013.[9][10] After concerns about on-time performance, the 2011 extension increased the fine for late trains from $100 to $300.[11]

In August 2012, MBCR and Keolis Commuter Services (KCS) were the two bidders for the contract. On January 8, 2014, the MBTA awarded Keolis the contract for $2.68 billion over eight years, with the possibility of two two-year extensions that could bring the total price to $4.3 billion.[12] Keolis took over the operations on July 1, 2014.

Service changes since MBTA takeover

Expansions

Several significant improvements have been made during MBTA's period of stewardship which started circa 1973. However, the Commonwealth's support for rail operations began in the 1950s with contracted operations and subsidies to railroads providing commuter service, and more so in 1964 with the advent of MBTA.

Contractions

During the period of MBTA control, services have also been curtailed:

Equipment

A typical Commuter Rail train, consisting of one diesel locomotive and five coaches, at Auburndale station in 2012.

All MBTA commuter rail service is provided by push-pull trains powered by diesel locomotives with a cab car on the opposite end. Trains typically have four to eight coaches (with six the most common) and seat between 400 and 1400 passengers. Approximately 58 trainsets are needed for weekday service.[20][21]

The primary heavy maintenance facility is the MBTA Commuter Rail Maintenance Facility, located in East Somerville on the former site of the Boston and Maine's Boston Engine Terminal. It is also used for midday and overnight storage of trains on the northside lines. Southampton Street Yard and the Readville Interim Layover facility are used for light maintenance and layover service. Various other layover facilities are used for midday and overnight storage; most are located near the outer ends of the lines.

Locomotive fleet

As of January 2015 the MBTA owned 125 locomotives. Of these, 89 were in active service, 6 inactive for various purposes, and 30 still awaiting delivery.[21] The current fleet of diesel locomotives comprises a mix of purpose-built passenger locomotives (such as the EMD F40PH) and freight locomotives rebuilt for passenger use (such as the GMD GP40MCs, which were originally GMD GP40-2LWs). All passenger locomotives are equipped with head end power (HEP), though some locomotives exclusively used for non-revenue work service do not.[21]


Year built[21] Builder[21] Model[21] Numbers[21] Notes[21] Image
2009 MP MPI MP36PH-3C 010-011 Purchased from Utah Transit Authority's FrontRunner.[22][21]
1957 - 1960 EMD EMD GP9 904 Not used for passenger service.
1978 - 1980 EMD EMD F40PH 1000-1017 Rebuilt by Bombardier 1989-1990. 1016 has been retired and was scrapped on April 21, 2014. Units are to be replaced by the HSP-46 locomotives.[21]
1991 - 1993 MK M-K F40PHM-2C 1025-1036 Rebuilt by MPI 2003-2004.
1987 – 1988 EMD EMD F40PH-2C 1050-1075 Rebuilt by MPI 2001-2003. 1073 retired and scrapped after the 1990 Back Bay rail accident. Some units may be replaced by the HSP-46 locomotives.[21]
1973 – 1975 GMD GMD GP40MC 1115-1139 Rebuilt by AMF in 1997. Some units to be replaced by the HSP-46 locomotives.[21]
2013 - 2014 MP MPI HSP46 2000-2039 40 units on order for delivery through 2015; the first unit entered passenger service on April 16, 2014.[23]
1971 EMD EMD GP40 3247 Not used for passenger service.
2009 NRE NRE 3GS21B 3248-3249 Not used for passenger service.

Coach fleet

#1800 arrives at Malden Center on the first revenue round trip of the new BTC-4D and CTC-5 coaches

As of January 2015 the MBTA owned 481 coaches. Of these, 409 were in active service, 64 inactive for various purposes, and 8 still awaiting delivery.[21] Coaches whose designations start with BTC (Blind Trailer Coach) are conventional coaches, while those starting with CTC (Control Trailer Coach) are cab cars. Cab cars will occasionally also appear in the middle of a consist. Coaches acquired before 1990 were single-level cars with 88 to 127 seats; those since are bilevel cars with 173 to 185 seats.[21]

Various coaches are equipped with electronic doors for use on the Old Colony Lines and Greenbush Line, which have full-length high-level platforms at all stops. All BTC-3, CTC-3, BTC-4C, and BTC-4D coaches have restrooms.[21] Trains usually have one of these cars adjacent to the locomotive, as that car will be platformed at all high level platforms regardless of length, and thus handicapped riders will be able to access the restroom car.

During winter months, a Ski Train serving Wachusett Mountain runs on the Fitchburg Line, using a coach car which is equipped for carrying bicycles or skis.[24][21] During summer months, some Newburyport/Rockport Line trains to Rockport include one of two cars equipped to carry bicycles.[25][21] The CapeFLYER uses car 224, which has been modified as a cafe and baggage car.[21]


Year built[21] Builder[21] Model[21] Fleet ID[21] Seats[21] Notes[21] Image
197879 Pullman BTC-1C 200258 114 The BTC-1C cars were rebuilt from BTC-1A and CTC-1A cars in 1995 and 1996, at which point they were renumbered; coaches 303 and 315 were not rebuilt and are no longer used. Coach 219 is a bike/ski car, 221 a bike car, 224 a cafe car, and 225 planned to be a bike car.[21]
1987 Bombardier BTC-1A 350389 127
198788 MBB BTC-3 500532 86 Only 10 of 32 BTC-3 cars remain in active service As of January 2015.[21]
198788 MBB CTC-3 15001533 96
198990 Bombardier BTC-1B 600653 122
198990 Bombardier CTC-1B 16001652 122 Coach 1648 has been retired. Cab controllers have been deactivated in coaches 16001624; they are used exclusively as blind coaches.[21]
199091 Kawasaki BTC-4 700749 185
199091 Kawasaki CTC-4 17001724 175
1997 Kawasaki BTC-4A 750766 182
2001 Kawasaki BTC-4B 767781 182
2005 Kawasaki BTC-4C 900932 178
2012-2014 Hyundai Rotem BTC-4D 800846 179 47 on order for delivery through 2015; the first units entered service in April 2013.[21]
2012-2014 Hyundai Rotem CTC-5 18001827 173 28 on order for delivery through 2015; the first unit entered service in April 2013.[21]

Retired equipment

An EMD FP10 locomotive near South Station in 1981. These units were retired in 1991.

As the Commonwealth assumed the control of the Commuter Rail during the 1970s, it inherited various non-standard equipment from predecessor railroads. These included:

Wi-Fi

Two coaches in 2012 with wraps indicating that they are wi-fi enabled. This 2008-built system will be replaced with a new system in 2015.

Free wi-fi internet service with limited bandwidth is provided on all trains. A two-tiered model where riders can pay extra for faster service is planned to be implemented in 2015.[27]

The program started with a $262,000 pilot in January 2008 on the Worcester Line, where 45 coaches were fitted with routers which connected to cellular data networks. T This was the first wi-fi available on a commuter rail service in the United States.[28] The Worcester Line was chosen for the pilot phase in part to compensate for low on-time performance, as well as to test the service across the line's varied terrain.[29] The program was considered successful; in December 2008, the MBTA announced that wi-fi would be available on all trains by mid-2009. 258 of the 410 coaches then owned by the MBTA would receive wi-fi equipment at a rate of about 30 per month.[30]

In July 2014, the MBTA announced that a private company would be building a new $5.6 million network to replace the 2008-built network. The MBTA is not paying for the new network; instead, the company expects to recoup its investment by providing a two-tiered offering. Free limited-bandwidth wi-fi will continue to be provided, along with local television broadcasts; a monthly fee will be charged by the company for access to higher bandwidth and other broadcasts, with 7.5% of the fee returned to the MBTA.[27] The new system is to be completed in 2015.[27]

Fare policy

Commuter Rail tickets in the form of CharlieTickets purchased at fare vending machines and ticket booths (left) and paper tickets purchased on-board (right).

The MBTA Commuter Rail uses a fare zone policy whereby origin and destination stations are not individually priced, but assigned a zone based on distance from Boston.[31] There are a total of eleven zones (1A, then 1 through 10) with an increasing fare to or from Boston the higher the zone number. Zone 1A fares are the least expensive and cost the same as rapid transit ($2.10), while the highest priced Zone 10 fares are $11.00 per ride.[31] Travel between suburban zones without going to Boston is charged an "interzone" fare based on the number of zones traveled.[31] Seniors, those with a disability, and middle and high school students with proper identification receive a 50% discounted rate; children under eleven travel free with a paying adult.[32] Fares are collected by train conductors and while fare evasion is explicitly illegal, it is not criminal.[33][34]

Tickets may be purchased at automatic vending machines located in principal stations and at suburban stations from nearby businesses and vendors.[35][36] Stations without ticketing machines or vendors can purchase tickets on board.[33] Alternatively, riders can use the MBTA mTicket app to purchase tickets on iPhone and Android devices, which allows them to display their tickets on their mobile phone screens rather than presenting paper tickets or passes.[37] Travelers can purchase tickets as a one-way, round trip, ten ride (no discount), or monthly pass (substantial discount over daily round-trip purchase).[31]

Ridership

Ridership levels on the Commuter Rail have grown since the MBTA's involvement began in the late 1960s, with overall average weekday ridership growing from 29,500 in 1969 to 76,000 in 1990 and 143,700 in 2008. This was accomplished by a series of rationalizations, such as closing lightly used lines, concentrating service on heavily utilized lines, and re-opening formerly abandoned branches with high traffic potential, such as the Old Colony Lines. A general growth of transit usage in the Northeastern United States also contributed. Growing ridership in this way required substantial capital investment, which was provided by a mixture of Federal mass transit funds and Commonwealth transportation bond issues.

Train operations

An MBTA train at Campello station inbound to South Station.

Like most commuter railroads in the Northeastern United States, MBTA is a NORAC Railroad and uses the Rulebook promulgated by that organization. Much of MBTA Commuter Rail is Rule 251 territory, as the tracks are signalled for movement in one direction of travel only. During the 1990s, parts of the system, such as the Framingham/Worcester Line, were re-signalled to allow a more advanced mode of operations known as NORAC Rule 261, which allows trains to operate in either direction on both tracks where double track is available. During the morning rush hour, both tracks can be simultaneously used for inbound traffic, allowing one train to make local stops while an express train overtakes the local train.[38]

On each train, the cab car is attached at the end closest to the downtown Boston terminal station for the particular line (either North or South Station), and the locomotive is attached at the end farthest from the terminal station. On each train serving the North Station lines, the "ADA" coach used to carry mobility-limited persons is attached right behind the locomotive, allowing level boarding at all suburban stations featuring mini-high platforms. On the other hand, on each train serving the South Station lines, the cab car also serves as the "ADA" coach. (The "ADA" coaches support compliance with the Americans with Disabilities Act of 1990.)

Trainlined doors that open automatically via central control are available on some equipment, but at low level platforms the conductor in each car must manually open a trap to allow passengers to descend via stairs onto the platform.

Proposed expansions

South Station lines

Foxboro station is proposed as the terminus of a Franklin Line branch

An extension of the Stoughton Line known as South Coast Rail is set to break ground to bring service to Taunton, Fall River, and New Bedford, Massachusetts. Routes through Attleboro and Middleboro were considered for the service but rejected.[39][40] Critics argue that building the extension does not make economic sense.[41]

In September 2010, the MBTA completed a study to determine the feasibility of extending regular commuter rail service to Foxboro via the Franklin Line. Currently, the station is only served during special events at Gillette Stadium. The study looked at extending some Fairmount Line service to Foxboro, running shuttle trains from Foxboro to Walpole, or a combination of both. No determination has been made as to if or when this service would begin.[42]

A Providence Line extension to Wickford Junction, in North Kingstown, Rhode Island opened on April 23, 2012. The Rhode Island Department of Transportation is also studying the feasibility of serving existing Amtrak stations in Kingston and Westerly as well as constructing new stations in Cranston, East Greenwich, and West Davisville. Federal funding has also been provided for preliminary planning of a new station in Pawtucket.[43]

There is also a proposal to extend the Middleborough/Lakeville Line to Wareham and eventually to Buzzards Bay. The CapeFLYER started service along this section to Hyannis on summer weekends in 2013.

A proposal was announced in 2012 to construct a new station on the Framingham/Worcester Line to service Brighton, near an expanded campus of New Balance. This station, named Boston Landing, is slated to open in 2016.[44]

In September 2013, the state announced plans to run diesel multiple unit (DMU) service between Back Bay and the Boston Convention and Exhibition Center on Track 61 beginning in 2015.[45] In 2014, the MBTA announce it would purchase DMU self-propelled rail cars for the Fairmount Line with eventual expansion to five other lines, including Track 61, to be known as the Indigo Line. A new West Station, is planned to be built on the Framingham-Worcester line in the Beacon Park Yard site, where it may also connect to North Station via the Grand Junction Railroad.[46]

North Station lines

Second main track under construction in Boxboro in 2011

On October 18, 2010, MBTA broke ground on an extension of the Fitchburg Line 4.5 miles (7.2 km) to a new Wachusett stop beyond the current terminal at Fitchburg Station. This extension is part of a larger improvement of the line, including upgraded high level platforms at both South Acton and Littleton are also planned, as well as a second main track is planned between South Acton and Ayer Junction, eliminating one of the single-track bottlenecks on the line. These improvements will speed the line so that the Fitchburg to Boston trip would take only about an hour.[47] The extension was funded by a $55.5 million Transportation Investment Generating Economic Recovery (TIGER) Grant.[48]

There is a proposal to build a South Salem station in Salem, Massachusetts, to improve access to Salem State University, as well as to extend Commuter Rail to Peabody, Massachusetts and Danvers, Massachusetts.[49]

The former state Secretary of Transportation James Aloisi had also indicated support for commuter service from Worcester to North Station via Clinton and Ayer, presumably along the Worcester, Nashua and Rochester Railroad right of way, owned by Pan Am Railways as of 2009.[50]

The state of New Hampshire has created the New Hampshire Rail Transit Authority and allocated money to build platforms at Nashua and Manchester.[51]

An article in the Eagle Tribune claims that Massachusetts is negotiating to buy property which has the potential to extend the Haverhill Line to Plaistow, New Hampshire. Funding is available, and Plaistow is potentially interested, but wants to better understand the potential drawbacks of being the location of the layover station.[52][53]

North-South Rail Link

No direct connection exists between the two downtown commuter rail terminals; to travel from one station to the other, passengers must use the MBTA subway or bus lines to make the connection. Passengers using the Providence/Stoughton, Framingham/Worcester, Franklin, and Needham lines can transfer to and from North Station via the Orange Line subway, connecting at Back Bay. Passengers using the Fitchburg Line can transfer to and from South Station via the Red Line subway, connecting at Porter. All other passengers have to change subway trains at either Park Street or Downtown Crossing stations, thus requiring two distinct subway lines to complete a trip between North and South Stations.

A North-South Rail Link has been proposed to unite the two halves of the commuter rail system;[54] but, because of the high cost, Massachusetts has, as of May 2006, withdrawn its sponsorship of the proposal. Meanwhile, for non-revenue transfers of equipment, the MBTA and Amtrak use the Grand Junction Railroad Company main line.

Freight service

Boston Sand and Gravel and tracks as seen from an MBTA train

On the North Side lines, as part of the original sale agreement, B&M and its successor Pan Am Railways (formerly Guilford Transportation Industries) retains 'perpetual and exclusive' trackage rights for freight service. Pan Am provides freight service on those lines.[55]

Boston Sand and Gravel has an agreement with Pan Am to operate its shortline New Hampshire Northcoast Railroad trains from Ossipee, New Hampshire to just north of Boston's North Station to supply aggregates to its plant on the Boston/Cambridge border.[56] An occasional move occurs with run-through power from Norfolk Southern Railway to supply coal to a power plant in Bow, New Hampshire, over the Fitchburg Line. The Haverhill and Fitchburg lines also host four to six PAR manifest freight trains per day.

On the South Side lines, CSX Transportation retains trackage rights over much of the former New Haven territory. Limited service is also provided by the Providence & Worcester Railroad on the Providence Line, principally from Central Falls (the intersection with its main line to Worcester) through Providence towards New Haven (although some freights go as far east as Attleboro before leaving the corridor).[57] The Bay Colony Railroad provides a limited amount of service on some lines.

CSXT used to provide intermodal, autorack, and general merchandise over the Worcester Line, a part of CSXT's Boston Line.[58] This part of the Commuter Rail network could host over 12 mainline freight trains per day, including descendents of Conrail's expedited intermodal Trail Van trains. Currently most freight service terminates in Framingham, and a trainload facility in Westboro, with limited freight service east through Beacon Park Yard in Allston to a few local customers. In 2013 CSX moved its intermodal service from Beacon Park to an expanded yard in Worcester.[59][60]

On its former Old Colony division, the New York, New Haven and Hartford Railroad (NYNH&H) essentially vacated its right of freight operations by abandoning the tracks in 1959. As MBTA rebuilt the tracks, it gained freight service rights, and those rights were franchised to Conrail (predecessor to CSX), which provided freight service on the former Old Colony division.

Art and architecture

The MBTA maintains an online catalog of the over 90 artworks installed along its six major transit lines. Each downloadable guide is illustrated with full-color photographs, titles, artists, locations, and descriptions of individual artworks.[61]

References

  1. "Transit Ridership Report: Third Quarter 2014" (PDF). American Public Transportation Association. 10 December 2014. Retrieved 22 December 2014.
  2. 2.0 2.1 "Commuter Rail Maps and Schedules". MBTA.com. Massachusetts Bay Transportation Authority. Retrieved October 2, 2010.
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 Belcher, Jonathan (2007-08-10). "Changes to Transit Service in the MBTA district" (PDF). Retrieved 2007-09-29.
  4. Dorin, Patrick C. (1969). Commuter Railroads: A Pictorial Review of the Most Travelled Trains. New York: Bonanza Books. OCLC 14408290.
  5. Drury, George H. (1994). The Historical Guide to North American Railroads: Histories, Figures, and Features of more than 160 Railroads Abandoned or Merged since 1930. Waukesha, Wisconsin: Kalmbach Publishing. pp. 222–229, 248. ISBN 0-89024-072-8.
  6. "Lt. Governor: Historic CSX Rail Agreement". Commonwealth Conversations: Transportation. Massachusetts Department of Transportation. 23 September 2012. Retrieved 24 December 2012.
  7. Monahan, John J. (4 October 2012). "At CSX freight yard, Murray touts increased train service". Worcester Telegram & Gazette. Retrieved 24 December 2012.
  8. Northeast Rail Service Act of 1981, Pub. L. 97-35, 45 U.S.C. ch. 20, 1981-08-13.
  9. 9.0 9.1 "MBTA Exercises Option With MBCR For Commuter Rail Service, Launches New Customer-Focused Improvements". MBTA. 2010-01-06. MBTA extends MBCR contract another two years.
  10. Commuter Rail Firm Gets Contract Extension Boston.com, accessed 16 February 2010.
  11. Boston Metro, 6 June 2008, p. 2.
  12. http://www.mbta.com/about_the_mbta/news_events/?id=6442451214&month=1&year=14 MBTA press release on Keolis Commuter Services award
  13. "Route 128 Station". New Haven Railroad Historical and Technical Association. 1 February 2000. Retrieved 1 August 2011.
  14. Karr, Ronald Dale (2010). Lost Railroads of New England (Third ed.). Branch Line Press. p. 54. ISBN 9780942147117.
  15. "Fairmount Line Improvements". Massachusetts Bay Transportation Authority. Retrieved 11 December 2011.
  16. Rocheleau, Matt (12 November 2012). "MBTA opens new commuter rail station at Talbot Avenue in Dorchester on Fairmount Line". Boston Globe. Retrieved 12 November 2012.
  17. "Boston to T.F. Green rail service debuts". NBC 10 News. 6 December 2010. Retrieved 1 August 2011.
  18. Kinsella, James (16 August 2013). "Cape Commuter Rail Is A Real Possibility". Cape News. Retrieved 18 August 2013.
  19. Jessen, Klark (12 August 2013). "West Fitchburg: New Wachusett Rail Station". Massachusetts Department of Transportation. Retrieved 16 August 2013.
  20. "Ridership and Service Statistics - Thirteenth Edition 2010" (PDF). Massachusetts Bay Transportation Authority. 2010. pp. 6877. Retrieved May 12, 2011.
  21. 21.0 21.1 21.2 21.3 21.4 21.5 21.6 21.7 21.8 21.9 21.10 21.11 21.12 21.13 21.14 21.15 21.16 21.17 21.18 21.19 21.20 21.21 21.22 21.23 21.24 21.25 21.26 21.27 21.28 21.29 21.30 "The MBTA Vehicle Inventory Page". NETransit. Retrieved 4 July 2014.
  22. Finucane, Martin (February 7, 2011). "MBTA unveils first new locomotive in 23 years". The Boston Globe. Retrieved February 8, 2011.
  23. LaBella, Mike (15 April 2014). "New train headed to city tomorrow". Eagle-Tribune. Retrieved 16 April 2014.
  24. "Ski Train To Wachusett". Wachusett Mountain Ski Area. 2012. Retrieved 2012-12-30.
  25. MBTA. "MBTA Bike Train" (PDF). Retrieved 11 August 2013.
  26. 26.0 26.1 26.2 Middleton, William D. (November 1991). "How MBTA rebuilt ridership". Railway Age. Retrieved 3 August 2008.
  27. 27.0 27.1 27.2 Thadani, Trisha (24 July 2014). "MBTA to boost Web service on commuter rail". Boston Globe. Retrieved 10 January 2014.
  28. Cox, John (28 January 2008). "Wi-Fi trial Connects Massachusetts Train Passengers". PC World. Retrieved 9 January 2015.
  29. "Framingham/Worcester Commuter Rail customers: Try our free MBTA Wi-Fi Commuter Rail Connect Test Program!". Massachusetts Bay Transportation Authority. January 2008. Archived from the original on 27 March 2008. Retrieved 9 January 2014. First, it provides one of the best opportunities from a geographical perspective to test Wi-Fi capabilities as it runs from Boston to central Massachusetts (Worcester) through various terrains (hills, wooded areas, etc.) Secondly, we are aware that the Framingham/Worcester trains have experienced significant performance issues due mainly to the owner and operator of the line (CSX). For that, we want to offer Framingham/Worcester customers the first opportunity.
  30. "Free Wi-Fi Service Expanded" (Press release). Massachusetts Bay Transportation Authority. 19 December 2008. Retrieved 10 January 2015.
  31. 31.0 31.1 31.2 31.3 "Commuter Rail Fares & Passes". MBTA.com. Massachusetts Bay Transportation Authority. Retrieved October 2, 2010.
  32. "Reduced Fares". MBTA.com. Massachusetts Bay Transportation Authority. Retrieved October 2, 2010.
  33. 33.0 33.1 "MBTA Scorecard" (PDF). Massachusetts Bay Transportation Authority. August 2010. p. 14. Retrieved October 2, 2010.
  34. "Section 101 Evasion of payment of toll or fare". Massachusetts General Laws. Commonwealth of Massachusetts. Retrieved October 2, 2010.
  35. "Sales Locations". MBTA.com. Massachusetts Bay Transportation Authority. Retrieved October 2, 2010.
  36. "Purchase Programs". MBTA.com. Massachusetts Bay Transportation Authority. Retrieved October 2, 2010.
  37. "Mobile Ticketing".
  38. Trahan, Tyler (9 December 2011). "The First T-Alert". Retrieved 9 December 2011.
  39. Wallgren, Christine (28 October 2007). "Battle lines drawn again on rail route". The Boston Globe. Retrieved 1 August 2011.
  40. "South Coast Rail: A Plan for Action" (PDF). Massachusetts Executive Office for Transportation. 4 April 2007. Retrieved 1 August 2011.
  41. Hand, Jim (11 March 2008). "Area residents, officials say give aid not MBTA rail line to South Coast". The Sun Chronicle. Retrieved 3 August 2011.
  42. "Foxborough Commuter Rail Feasibility Analysis". MBTA. Retrieved 2010-12-09.
  43. "Intermodal Planning". Rhode Island Department of Transportation. Retrieved 3 August 2011.
  44. Powers, Martine (30 May 2014). "Brighton rail station opening pushed back to 2016". Boston Globe. Archived from the original on 1 June 2014. Retrieved 30 May 2014.
  45. Leung, Shirley (6 September 2013). "State to begin innovative rail service between Seaport District and Back Bay". Boston Globe. Retrieved 6 September 2013.
  46. Annear, Steve (9 January 2014). "Take A Ride On The MBTA’s ‘New Indigo Line’ In 2024". Boston Magazine. Retrieved 11 March 2014.
  47. Monahan, John J. (30 November 2007). "$150M smile for MBTA". Worcester Telegram and Gazette. Retrieved 3 August 2011..
  48. "Patrick-Murray Administration, U.S. Transportation Secretary LaHood, Congressman Olver Kick off Wachusett Commuter Rail Extension Project". Massachusetts Bay Transportation Authority. 18 October 2010. Retrieved 3 August 2011.
  49. "Draft North Shore Transit Improvements Project-MIS: Executive Summary" (PDF). Massachusetts Bay Transportation Authority. Retrieved 3 August 2011.
  50. Priyanka Dayal (28 April 2009). "MBTA warns of cuts / Transportation future hot topic". Worcester Telegram. Retrieved 3 August 2011.
  51. "Governor Lynch Ceremonially Signs Law Supporting Development Of Commuter Rail in New Hampshire". State of New Hampshire Governor's Office. 27 July 2007. Retrieved 3 August 2011.
  52. Carey, Meghan (12 March 2008). "Haverhill chamber chief supports train stop in Plaistow". Eagle-Tribune. Retrieved 3 August 2011.
  53. Carey, Meghan (9 March 2008). "Plaistow officials hopeful MBTA considers rail extension". Eagle-Tribune. Retrieved 3 August 2011.
  54. Massachusetts Chapter Sierra Club
  55. "2030 Transportation Plan Chapter 2: The Boston Region MPO and its Existing Transportation System (Part 3)" (PDF). Boston Region Metropolitan Planning Organization. April 2007. Retrieved 3 August 2011.
  56. "NH NORTHCOAST". Boston Sand & Gravel. 2011. Retrieved 19 October 2011.
  57. "P&W Map". Providence & Worcester Railroad. Retrieved 19 October 2011.
  58. "CSX System Map". CSX Transportation. Retrieved 19 October 2011.
  59. "CSX Rail Agreement, South Coast Rail Plans Move Forward". Massachusetts Department of Transportation. 25 November 2009. Retrieved 19 October 2011.
  60. Kotsopoulos, Nick (June 17, 2013). "CSX project wrap-up means money for city". Telegram & Gazette. Retrieved 1 September 2014.
  61. "Public Art in Transit: Over the Years". mbta.com. Massachusetts Bay Transportation Authority. Retrieved 2014-06-23.

External links

Wikimedia Commons has media related to MBTA Commuter Rail.