The Los Teques Metro is a suburban mass-transit system that is being built in the city of Los Teques, Venezuela with connections to important surrounding cities and communities. It was opened to public service on November 3, 2006.[1] The Los Teques Metro currently operates as one line connecting 2 stations; however, additional stations are now under construction.

The system connects the city of Los Teques with the capital of Caracas. The Los Teques Metro is operated by Metro de Caracas – as such, it is effectively a subsidiary/extension of the Caracas Metro, and is widely viewed as part of that system.[2] It is ascribed to the Venezuelan government and the Ministry of Infrastructure. The government of Miranda State and the mayorship of the Guaicaipuro Municipality are also financing its development.

The currently operating line runs for 9.5 kilometers (5.9 mi),[1] parallel to the San Pedro River, establishing a link between Las Adjuntas station 900 metres above sea level to the Alí Primera (formerly El Tambor) station 1300 metres above sea level in Los Teques, with a fifteen minutes travel calculated in between, and no intermediate stops.

History

The subway plans date back to 1982, when it was first proposed. However, it wouldn't be until October 19, 1998 when the Metro de Los Teques transit corporation was created (now defunct) in order to carry out management, administrative duties and civil works related to the project. It was supposed to alleviate the congestion of the Panamerican Highway and ease commuting between the two cities, because of their proximity. The operation was subsequently taken over by Metro de Caracas and plans were extended to include expansion to San Antonio and a 3rd line to connect to 2nd point in Caracas.

Construction for the first phase began in 2001 with works including the cannalization of the San Pedro River, the tunnelling and building of the bridges until reaching Las Adjuntas. It is estimated that the project cost was about 800 million US dollars.

The metro system began with restricted operations:

on November 3, 2006.

Operations

The second rail within the same tunnel was formally inaugurated October 22, 2007. Trial and testing period continued with additional trains and full 7 day service from 5:10 a.m. until 11:00 p.m. implemented on November 19, 2007.

The 9.5-kilometer (5.9 mi)[1] ride between Las Adjuntas and Alí Primera as of January 2, 2007 is 1,500 bolívares (1.5 bolívares fuertes, 75 US cents) for a one way ride and the price includes a subway ride within the Caracas Metro network.

Type Coverage Fare Notes
Subway One Way One ride to or from Los Teques to any Caracas Metro station 1,500 bolívares (1.5 bolívares fuertes, 0.72 USD) Valid for all Caracas Metro stations
Return Trip 2 rides 2,900 bolívares (Bs.F 2.9, 1.38 USD) same as above
Multi-Abono 10 rides 14,000 bolívares (Bs.F 14, 6.20 USD) Available at all Caracas Metro stations or on departure from Alí Primera
Student Multi-Abono 10 rides 9,000 bolívares (Bs.F 9, 4.10 USD) Available at some Caracas Metro stations: Maternidad; Caño Amarillo; Parque del Este; El Silencio and Caricuao.

Future plans

Construction of the extension formally started March 20, 2007. This extension known as Line 2 to the system will be 12 km (7.5 mi) with 3 new stations within the city, 2 in nearby communities and finally terminating in San Antonio de Los Altos with the central Los Teques stations opening in 2010 and 100% completion is expected by 2015.

Line 2 adds six stations that are currently under construction are:

Line 3 has been proposed 18.5 km (11.5 mi) to be awarded by 2010 and completed by 2015. It will commence from San Antonio and connect some communities before looping towards the La Rinconada Caracas Metro Station.[3]

Timeline of line extensions

Line Station Station Length Status
1 Las Adjuntas Ayacucho -.- km under construction, for service in 2014
Las Adjuntas Alí Primera 9.5 km[1] In everyday service
2 Alí Primera Guaicaipuro 0.7 km opened on December 11, 2012
Guaicaipuro Independencia 1.0 km opened on December 1, 2013
Independencia Los Cerritos 1.7 km under construction, for service in 2017
Los Cerritos Carrizal 1.7 km under construction, for service in 2017
Carrizal La Carbonera -.- km under construction, for service in 2018
Carrizal Las Minas 4.3 km under construction, for service in 2019
Las Minas San Antonio 2.5 km under construction, for service in 2019
3 San Antonio La Morita 1.5 km planning
La Morita San Diego 1.6 km planning
San Diego Potrerito 4.9 km planning
Potrerito La Mariposa 3.0 km planning
La Mariposa La Rinconada 7.5 km planning

See also

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "SISTEMA METRO - CARACTERÍSTICAS POR LÍNEAS" [METRO SYSTEM - CHARACTERISTICS BY LINE] (in Spanish). C.A. Metro de Caracas. Retrieved 2014-06-06.
  2. Robert Schwandl. "Caracas". UrbanRail.net. Retrieved 2014-06-06.
  3. "Metro Los Teques Line 2 contract signed". Railway Gazette International.

External links