The following is a list of the current in service 64 stations and the other planned stations on the Cairo Metro. Underground stations are marked in bold type. Planned stations and planned interchanges are marked in italics.

Line 1

Cairo Metro

Line 2

Line 3

North Bound

South Bound

The currently in service section of this line is station between Ataba Station and Ahram Station. According to the website of the National Authority for Tunnels (NAT), the first part of phase three of this line which starts at Ataba Station and ends at Kit Kat Station is due to enter the construction phase in the summer of 2014. The construction fourth phase of this line (from Haron Station to Nadi El Shams station) is due to start in early 2015. The previous two sections is expected to be completed by 2019.

Future lines

Line 4

This line is till under study, construction of the first phase (El Malek El Saleh - Giza) expected to start in early 2016 according to NAT.

Other lines

There are also plans for other lines including a circular line (Line 5) connecting Lines 1,2,3 and 4 along with the final line (Line 6) which will run from Shubra up-north until the heart of Maadi and Helwan districts in the south through running from Ataba Station (Interchange with both Line 2 and Line 3) through El Kalaa street شارع القلعة in bored tunnels to Salah Eldin Citadel Station (Interchange with Line 4) and moving on from there to both districts via bored tunnels using the existing route El-Mahager Railway as a guide through both Maadi and Helwan.