Line 7, Beijing Subway

Line 7
七号线
Overview
Type Rapid transit
System Beijing Subway
Stations 19
Daily ridership 182,800 (2014 Avg.)[1]
226,200 (2014 Peak)
Operation
Operator(s) Beijing Mass Transit Railway Operation Corp., Ltd
Technical
Line length 23.7 km (14.7 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Route map
Lines 9, 7
[{{fullurl:{{{1}}}|action=edit}}    ]
[{{fullurl:{{{1}}}|action=edit}}    ]
Beijing West
[{{fullurl:{{{1}}}|action=edit}}    ]
Wanzi
Lines 16, 7
[{{fullurl:{{{1}}}|action=edit}}    ]
Daguanying
Line 16 opens 2017
[{{fullurl:{{{1}}}|action=edit}}    ]
Guang'anmennei
[{{fullurl:{{{1}}}|action=edit}}    ]
Caishikou
[{{fullurl:{{{1}}}|action=edit}}    ]
Hufangqiao
Lines 8, 7
[{{fullurl:{{{1}}}|action=edit}}    ]
Zhushikou
Line 8 opens 2017
[{{fullurl:{{{1}}}|action=edit}}    ]
Qiaowan
Lines 5, 7
[{{fullurl:{{{1}}}|action=edit}}    ]
[{{fullurl:{{{1}}}|action=edit}}    ]
Ciqikou
[{{fullurl:{{{1}}}|action=edit}}    ]
Guangqumennei
[{{fullurl:{{{1}}}|action=edit}}    ]
Guangqumenwai
Lines 5, 7
[{{fullurl:{{{1}}}|action=edit}}    ]
Shuangjing
Lines 14, 7
[{{fullurl:{{{1}}}|action=edit}}    ]
Jiulongshan
Line 14 opens Dec. 28, 2015
[{{fullurl:{{{1}}}|action=edit}}    ]
Dajiaoting
[{{fullurl:{{{1}}}|action=edit}}    ]
Guangqumenwai
[{{fullurl:{{{1}}}|action=edit}}    ]
Baiziwan
[{{fullurl:{{{1}}}|action=edit}}    ]
Huagong
[{{fullurl:{{{1}}}|action=edit}}    ]
Nanlouzizhuang
[{{fullurl:{{{1}}}|action=edit}}    ]
Happy Valley Scenic Area
Fatou
[{{fullurl:{{{1}}}|action=edit}}    ]
Shuanghe
[{{fullurl:{{{1}}}|action=edit}}    ]
Jiaohuachang

Line 7 of the Beijing Subway (Chinese: 北京地铁7号线; pinyin: běijīng dìtiě qīhàoxiàn) is a rapid transit rail line in Beijing. It runs parallel and to the south of Line 1 and Batong Line, from the Beijing West Railway Station in Xuanwu District to Jiaohuachang (Coking Plant) in Tongzhou District. Construction began in January 2010.[2] It started test runs in September 2014 with full operation beginning on December 28, 2014.[3]

Route

Line 7 currently has 19 operational stations and is planned to have a total of 23 stations. The stations will have longer platforms that accommodate 8-train cars than existing Beijing subway station platforms which can only accommodate 6-train cars.[4] The line was originally slated to have 17 stations, from the Beijing West Station to Baiziwan.[5] A revised plan approved by the Planning Committee of the Beijing Municipal government called for 22 stations over 23.9 km, ending in Jiaohuachang (Coking Plant) further east.[6] A 23rd station was added at the eastern 4th Ring Road to accommodate nearby residents.[7]

Stations

List of stations from west to east.[8]

Station name
English
Station name
Hanzi
Transfer
Bus transfer
Location
Beijing West Railway Station 北京西站 9 3 9 21 40 50 52 53 65 67 89 96 109 122 309 349 373 374 387 410 414 616 661 662 663 673 694 695 741 820 821 840 843 890 901快 941 941快 982 997 特2 特6 特13 特14 特17 特18 特19 夜5 夜8 夜14 夜15 夜22 夜23 夜36 运通102 专3 Fengtai
Wanzi 湾子 6 38 45 46 53 57 76 85 89 109 122 133 340 390 410 414 477 691 特7 夜7 夜22 Xicheng
Daguanying 达官营 6 38 42 46 53 57 76 80 85 109 122 133 340 390 410 477 691 特7 夜7 夜22
Guang'anmennei 广安门内 5 6 19 38 40 57 76 78 109 133 381 477 676 717 741 835 835快 836 838 917快 特5 夜7
Caishikou 菜市口 4 5 6 48 57 70 83 102 105 109 381 603 特5 特14 夜4 夜7 夜10 夜18 专13
Hufangqiao 虎坊桥 5 6 7 14 15 23 34 48 57 66 70 102 105 603 特5 夜7 夜10 夜18
Zhushikou 珠市口 5 17 20 23 48 57 59 66 69 71 93 120 622 观光1 特11 夜2 夜7 夜10 夜17 夜18 Xicheng /
Dongcheng
Qiaowan 桥湾 23 57 夜7 夜10 Dongcheng
Ciqikou 磁器口 5 23 25 39 41 43 57 60 106 116 525 623 684 685 特7 夜7 夜10 夜24 夜28
Guangqumennei 广渠门内 8 12 23 57 夜7
Guangqumenwai 广渠门外 23 57 637 夜7
Shuangjing 双井 10 Chaoyang
Jiulongshan 九龙山 11 23 30 35 54 348 382 486 513 541 605 621 677 985 988 夜7 夜25 专5 Chaoyang
Dajiaoting 大郊亭 11 23 31 35 439 455 513 541 581 657 740 810快 865 特9 夜34
Baiziwan 百子湾 11 23 31 439 455 541 581
Huagong 化工
Nanlouzizhuang 南楼梓庄 30 34 41 561 657
Happy Valley Scenic Area 欢乐谷景区 31 41 专166
Fatou 垡头
Shuanghe 双合 348 457 561 637 677 夜19
Jiaohuachang 焦化厂 348 457 637 638 677 夜19

Shuangjing Station and Fatou Station are not in operation.

History

Notes

  1. "晚高峰加小圈车 地铁6号线满载率降12%". 首都之窗. 2014-08-22. Retrieved 2014-09-14.
  2. 2.0 2.1 (Chinese) 北京地铁“南北大动脉”2010底前打通 Nov. 6, 2009
  3. http://baike.baidu.com/view/1720195.htm
  4. (Chinese) “4条地铁线将装屏蔽门” ‘’法制晚报’’ Jan. 20, 2010
  5. 5.0 5.1 "Beijing Subway Line 7 and Line 14 will begin construction this year" People's Daily Online Jan. 8, 2008
  6. (Chinese) "轨道交通7号线规划方案通过专家评审" 轨道协调组 Aug. 7, 2008
  7. 7.0 7.1 (Chinese) “北京地铁7号线悄然开工 全长23.7公里工期4年” ‘’法制晚报’’ Jan. 19, 2010
  8. (Chinese)"Line 7 Information Page" BII accessed Oct. 31, 2008
  9. (Chinese) "北京地铁7号线与14号线方案获批" 京华时报 Oct. 30, 2008
  10. (Chinese) Guo, Kun. "北京地铁7号线下个月开工" 京华时报 July 19, 2009
  11. http://baike.baidu.com/view/1720195.htm