Line 10, Nanjing Metro
Line 10 十号线 | |
|
Overview |
---|
Type |
Rapid transit |
---|
Status |
West extension under construction |
---|
Locale |
Nanjing, China |
---|
Termini |
Andemen Yushanlu |
---|
Stations |
14 |
---|
Daily ridership |
107,000 (2014 Avg.) 145,000 (2014 Peak)[1] |
---|
Operation |
---|
Opening |
July 1, 2014 |
---|
Technical |
---|
Line length |
21.6 km (13.4 mi) |
---|
No. of tracks |
2 |
---|
Track gauge |
1,435 mm (4 ft 8 1⁄2 in) |
---|
Line 10 will be a future line on the Nanjing Metro system in China. Although one section of it is already in operation, it is not officially named as Line 10 yet until the entire line is ready to stand independently on its own. Line 10 opened on July 1 with 14 stations spanning a total of 21,6 km.[2]
History
The first phase of Line 10 is the current Line 1 section between Andemen and Olympic Sport Center stations.[3]
The second phase of Line 10 is the current west extension of Line 1 from Olympic Stadium. It is now opened with 14.4 km long and have 9 stations.[2][4]
Station list
References
|
---|
| Urban Rapid Transit | Lines in operation | |
---|
| Lines under construction | |
---|
| Planned lines | |
---|
|
---|
| Suburban Rapid Transit | Lines in operation | |
---|
| Lines under construction | |
---|
| Planned lines | |
---|
|
---|
|