Lanzhou–Zhongchuan Airport Intercity Railway
Lanzhou-Zhongchuan Airport Intercity Railway 兰州至中川机场铁路 | |
---|---|
Overview | |
Type | High-speed rail |
Status | Under Construction |
Locale | China |
Termini |
Lanzhou Lanzhou Zhongchuan Airport |
Stations | 6 |
Operation | |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 61 km (38 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Minimum radius | 3,500 m (11,483 ft) |
Electrification | 50Hz 25,000V |
Operating speed | 250 km/h (155 mph) |
Maximum incline | 6.0% |
Lanzhou Zhongchuan Airport Intercity Railway route map | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Legend | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Lanzhou Zhongchuan Airport Intercity Railway is a high-speed railway in China, located in Gansu Province, connecting the Lanzhou urban area and Lanzhou Zhongchuan Airport. The Lanzhou Zhongchuan Airport is quite distant from the actual city area of Lanzhou itself. Regular ground transport currently takes about an hour to make the journey and taxi journeys are expensive at around 150RMB, but with little to no time advantage over the airport bus service. Thus a high-speed rail connection was initiated by the Lanzhou government in order to improve access to the airport.
Overview
The Lanzhou Zhongchuan Airport Intercity Railay is proposed to be the first section of a longer Lanzhou-Zhangye Intercity Railway, connecting western Gansu cities. Length of the railway will be 61 km. Starting from Lanzhou West Railway Station to Fuliqu, the route will parallel the Lanzhou-Xinjiang High-Speed Railway. From Fuliqu to Lanzhou Zhongchuan Airport will have 48.2 km of new railway, built as a double tracked electrified line. Total investment will be over 9.1 billion yuan RMB. A total of six stations will be constructed, Lanzhou West Railway Station will allow transfers to the future Lanzhou Metro Line 2, Chenguanying will allow transfers to Metro Line 1.
An initial groundbreaking ceremony was held on December 27, 2010. However works were not actually started. On December 21, 2012, another groundbreaking ceremony was held again with full construction now underway.[1]
References
- ↑ 敦煌至格尔木和兰州至中川机场铁路开工建设 (Work started on the Dunhuang-Golmud Railway and on the railway from Lanzhou to Zhongchuan Airport), 2012-12-23