Kigamboni Bridge

Kigamboni Bridge
Daraja la Kigamboni  (Swahili)

Kurasini Creek
Coordinates 6°51′33″S 39°17′59.14″E / 6.85917°S 39.2997611°ECoordinates: 6°51′33″S 39°17′59.14″E / 6.85917°S 39.2997611°E
Carries 6 lanes dual carriageway
Crosses Kurasini Creek
Locale Kurasini, Dar es Salaam
Owner NSSF (60%)
GoT (40%)
Characteristics
Design Cable-stayed bridge
Total length 680 metres (2,230 ft)
Width 27.5 metres (90 ft)
History
Designer Arab Consulting Engineers
Constructed by China Railway Jiangchang Engineering (T) Ltd &
China Major Bridge Engineering Company
Construction begin February 2012
Construction end July 2015 (projected)
Construction cost US$ 136 million
Replaces MV Magogoni ferry
Statistics
Toll TBA

Kigamboni Bridge is a bridge currently under construction in Tanzania.[1][2] It will connect the Dar es Salaam central business district to the Kigamboni ward across the Kurasini creek. Construction work began in February 2012 and is expected to complete in 36 months. At present, the Kivukoni ferry links the two places.

Gallery

References

  1. "SPECIFIC PROCUREMENT NOTICE Invitation for Pre-qualification Tender No: PA/004/2010-11/HQ/W/28" (PDF). nssf.or.tz. Retrieved 7 March 2013.
  2. "Construction of Kigamboni Bridge launched". TANROADS. September 2012. Retrieved 7 March 2013.

External links