Kharagpur Junction railway station

Kharagpur
Indian Railway Junction Station

Outside view of Kharagpur station
Location Kharagpur, Paschim Medinipur district, West Bengal
 India
Coordinates 22°20′24″N 87°19′30″E / 22.3399°N 87.3249°ECoordinates: 22°20′24″N 87°19′30″E / 22.3399°N 87.3249°E
Elevation 29 metres (95 ft)
Owned by Indian Railways
Operated by South Eastern Railway
Line(s) Howrah-Nagpur-Mumbai line
Howrah-Chennai main line
Howrah-Kharagpur line
Asansol–Tatanagar–Kharagpur line
Kharagpur-Puri line
Platforms 10 (1,1A,2,2A,3,3A,4,4A,5,6)
Construction
Structure type Standard (on ground station)
Parking Available
Other information
Status Functioning
Station code KGP
Zone(s) South Eastern Railway Zone (India)
Division(s) Kharagpur
History
Opened 1898-99
Previous names Bengal Nagpur Railway
Services
Preceding station   Indian Railway   Following station
Jakpur
South Eastern Railway zone
Howrah-Kharagpur line
Terminus
Jakpur
South Eastern Railway zone
Hijli
Jakpur
South Eastern Railway zone
Howrah-Nagpur-Mumbai line
Nimpura
TerminusSouth Eastern Railway zone
Adra–Kharagpur line
Girimaidan

Kharagpur is a railway station in Kharagpur subdivision of Paschim Medinipur district in the Indian state of West Bengal.

History

Kharagpur Junction came up in 1898-99. On one side, Bengal Nagpur Railway’s Kharagpur-Cuttack line was opened on New Year’s Day in 1899. On the other hand, the opening of the bridge over the Rupnarayan River at Kolaghat, on 19 April 1900, connected Howrah with Kharagpur. Kharagpur was also linked with Sini the same year. The line was ready in 1898-99. The Kharagpur-Midnapore branch line was opened to traffic in 1901.[1]

Platform length

After Gorakhpur, and Kollam junction, Kerala, Kharagpur has the world's third longest railway platform with a length of 1,072.5 metres (3,519 ft).[2][3][4] Remodelling of Gorakhpur railway station was completed and the new platform inaugurated on 6 October 2013. Till then Kharagpur boasted of the longest platform in the world for many years.[5]

Coromandal Express halted at Kharagpur Junction

Platform nos. 1 and 3, and 2 and 4 of Kharagpur Junction are contiguous. The 24 coach Coromandel Express stops at the start of platform no. 3 and its tail extends some distance in to platform no. 1.[2]

Longest

The longest railway platforms are:

Kharagpur Junction Facts File

It is the busiest junction station in South Eastern Railway Zone after Howrah. Hence, it is termed as Gateway to South Eastern Railway. It is a junction which connects Howrah to Mumbai, Chennai, Adra/Purulia and New Delhi via Tatanagar as well. It also connects Bhubaneshwar to New Delhi. Everyday approximately 275 trains pass through this station which includes freight traffic. In terms of passenger traffic it handles 176 trains on a daily basis. So, in a bid to decongest Kharagpur station and speed up locomotives, South Eastern Railway has decided to develop Hijli (close to IIT-Kharagpur) as an alternative station for Kharagpur. In future, most of the new trains coming from Balasore side and going towards Adra or Tatanagar will stop at Hijli and bypass Kharagpur. In order to increase passenger commute between Kharagpur and Hijli, new EMU services have been introduced between these two stations.

The Howrah-Nagpur-Mumbai line is classified under Route A of Indian Railways which allows trains to run at maximum permissible speed of 160 km/hr. However, as a result of the automated block section between Howrah and Kharagpur, the speed is restricted to 120 km/hr. The Howrah-Kharagpur section has been identified as one of the high density Automatic Block Section routes on Indian Railways. Thus plans are to deploy TPWS (Train Protection and Warning System) on this section to mitigate the risk of Signal passed at danger (SPAD) by train drivers leading to accidents.

It has also been identified as one of the Dedicated Freight Corridors (DFC) - on the East-West : Howrah-Mumbai via Kharagpur-Bilaspur-Nagpur, and on the East-Coast : Kharagpur-Vijayawada via Khurda Road-Duvvada. These routes would be operational well before 2020. This would create adequate capacity to meet the freight demand and also elevate the quality of service to global standards.

Due to increasing number of trains on Howrah - Kharagpur section, construction of a third line from Panskura to Kharagpur has been initiated. Upon completion of this project, the traffic on this section may be eased to some extent (Howrah - Panskura section has already 3 lines).

Due to passenger demand, new Ladies Special EMU service has been introduced between Howrah - Kharagpur. Plans are also to introduce more new suburban trains between Howrah-Narayangarh (towards Balasore) and Howrah-Ghatsila (towards Tatanagar).

The below is a list of some of the Important Trains that Pass through Kharagpur Junction:-

TOWARDS TATANAGAR / MUMBAI

TOWARDS BHUBANESHWAR / CHENNAI / SECUNDERABAD / BANGALORE

TOWARDS PURULIA / DELHI / PATNA

TOWARDS GUWAHATI

LIST OF DURONTO TRAINS BEING HANDLED:-

Apart from these there are currently 30 pairs of EMU/MEMU trains that ply between Howrah Jn. and Kharagpur Jn. In addition to these, there are 15 pairs of passenger trains either pass through or terminate (at) Kharagpur. The average total of passenger trains that pass through Kharagpur is 176 per day.

Kharagpur Junction has total 10 platforms.

Platforms - 1,2,3,4,5 and 6 serve Mail/Express trains. Platforms - 1A,2A,3A,4A serve EMU/MEMU/Passenger trains.

2new platforms are under construction - Platform 7 & 8. Once functional the number of platforms at Kharagpur will be 12.

Gallery

External links

Kharagpur travel guide from Wikivoyage

References

External links