Kelana Jaya Line
5 Kelana Jaya Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
The Kelana Jaya Line is coloured rose on system maps. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Light metro | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Klang Valley | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini |
KJ1 Gombak KJ24 Kelana Jaya | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 24 plus 13 under construction[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | Gombak - KL - Petaling Jaya | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line number | 5 (rose) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website |
www | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opening | 1 September 1998 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Prasarana Malaysia | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Rapid Rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Elevated, underground, and at-grade | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Subang | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock |
2-car & 4-car trainsets of Bombardier Innovia Metro | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length |
29 km (18 mi) 17.4 km (10.8 mi) under construction [1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track length | 0 km (0 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Third Rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 60 km/h (37 mph) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Kelana Jaya Line is a light rapid transit (LRT) lines in Klang Valley operated by Rapid Rail, one of the subsidiaries of Prasarana Malaysia.
The line is one of the components of the Klang Valley Public Transport System.
The Kelana Jaya Line was formerly known as PUTRA LRT, "PUTRA" standing for Projek Usahasama Transit Ringan Automatik Sdn Bhd, the company which developed and operated it, now owned by Prasarana Malaysia Berhad (Prasarana).
Since 28 November 2011, the Kelana Jaya Line and the Ampang Line & Sri Petaling Line were integrated with a single ticketing system, allowing transfer at Masjid Jamek station without the need to buy a new ticket.
History
The first operation commenced on 1 September 1998 between Subang Depot and Pasar Seni, with phase two, Pasar Seni to Terminal Putra, in June 1999.
In 2002, the line carried its 150 millionth passenger, with an average of 160,000 passengers daily.[2] Today, it carries over 190,000 passengers a day and over 350,000 a day during national events.[3]
The line will undergo a 17 km extension with construction expected to commence in early 2010 through 2012. With 13 new stations to the line, the new terminus will be at Putra Heights, extended from Kelana Jaya.[4]
Chronology
- 15 February 1994 - Projek Usahasama Transit Ringan Automatik (Putra LRT) was incorporated.
- 1 September 1998 - Section 1 from Subang Depot to Pasar Seni commenced operation.
- 1 June 1999 - Section 2 from Pasar Seni to Terminal Putra commenced operation. The new section included Malaysia's first underground railway.
- 1 September 2002 - Putra LRT comes under management of Syarikat Prasarana Negara and renamed Putraline under the first phase of the restructuring of Kuala Lumpur's public transport system. Prasarana also takes over Star LRT and is renamed Starline.
- November 2004 - Operational aspects of the two lines is transferred to the new government-owned Rapid KL under the second phase of the restructuring process. Ownership of their assets remains with Syarikat Prasarana Negara.
- July 2005 - Name changed from Putraline to Kelana Jaya Line. Signage to be changed by 2006.
- 24 July 2006 - Failure of the back-up computer to kick in caused the line to stop functioning during the evening rush hour. Passengers were trapped in trains and some had to force open doors to get out.
- 29 August 2006 - Malaysian Deputy Prime Minister Najib Abdul Razak announces that this line will be extended from Lembah Subang to Subang Jaya and USJ.
- 6 October 2006 - A "technical problem" caused a train to stall between Dato Keramat and Damai at 7am, causing a shut-down of the Masjid Jamek-Terminal PUTRA stretch. Normal service restored at 5pm.
- 13 October 2006 – Prasarana signed an agreement with Bombardier-Hartasuma Consortium (BHC)for the purchase of 22 four-car sets with an option of an additional 13 train sets for RM1.2 billion. Trains were targeted to be delivered in 2008.
- 12 December 2006 - An accident occurred during a peak hour as a train was approaching Pasar Seni LRT station. The train stopped abruptly as if it hit something. No casualties occurred.
- 8 October 2007 – Prasarana purchased an additional 13 Advanced Rapid Transit (ART) MK II train sets (52 cars) for €71 million. Delivery was expected in 2010.[5]
- 27 July 2009 - Malaysian Prime Minister Najib Abdul Razak announced that 35 new four-car trains will be operational by end-2012.[6]
- 15 September 2009 – Syarikat Prasarana Negara begins a 3-month public display of the proposed alignment of the extension (and the Ampang Line extension) for feedback.[7][8]
- October 2009 - Test runs for the new four-car trains begin.[9] Passengers were not allowed to board these trains.
- 30 December 2009 - Three four-car trains officially begin service, while the remaining 32 four-car trains will be gradually introduced into service through April 2011.[10]
- 24 December 2010 - Sri Rampai opens.
- 28 November 2011 - Kelana Jaya and Ampang - Sri Petaling Line integrated with a single ticketing system.
Line information
Line and stations
The line runs from Kelana Jaya to Gombak, serving the Petaling Jaya region to the south; southwest and central Kuala Lumpur, and Kuala Lumpur City Centre to the centre; and ow density residential areas further north. At 29 km in length, it is the fourth longest fully automated driverless metro system in the world, after Dubai Metro in Dubai(74.6 km), the SkyTrain in Greater Vancouver, Canada (68.7 km) and the Lille Metro VAL in Lille, France (32 km).
The stations are given in a north-south direction, consists primarily of elevated stops and a handful of underground and at-grade stations. Of the 24 stations, 18 are elevated, 1 lies on the ground and 5 stops, Masjid Jamek, Dangi Wangi, Kampung Baru, KLCC and Ampang Park are underground. A new station is Sri Rampai.
The stations, like those of the Ampang Line, are styled in several types of architectural designs. Elevated stations, in most parts, were constructed in four major styles with distinctive roof designs for specific portions of the line. KL Sentral station, added later, features a design more consistent with the Stesen Sentral station building. Underground stations, however, tend to feature unique concourse layout and vestibules, and feature floor-to-ceiling platform screen doors to prevent platform-to-track intrusions. 13 stations (including two terminal stations and the five subway stations) utilise a single island platform, while 11 others utilize two side platforms. Stations with island platforms allow easy interchange between north-bound and south-bound trains without requiring one to walk down/up to the concourse level.
The stations were built to support disabled passengers, with elevators and wheelchair lifts alongside escalators and stairways between the levels. The stations have platform gaps smaller than 5 cm to allow easy access for the disabled and wheelchair users. They are able to achieve this with:
- Tracks that are non-ballasted, lessening rail and train movements.
- Trains that have direct rubber suspension, lessening train body movements.
- Trains that do not rapidly run through stations.
- Stations that have straight platforms.
The stations are currently the only rapid transit stations in the Klang Valley designed to provide a degree of accessibility for handicapped users.
The stations have closed-circuit security cameras for security purposes.
Code | Name | Platform type | Position | Interchange/Notes |
KJ1 | Gombak | Terminus | Elevated |
Formerly known as Terminal PUTRA, a new leveled carpark is built next to the station named 'Kompleks Parkir Bertingkat LRT Gombak', which can only be accessed using the MyRapid card. |
KJ2 | Taman Melati | Side | Elevated | |
KJ3 | Wangsa Maju | Island | Elevated | |
KJ4 | Sri Rampai | Side | Surface |
The station is opened to public of 24 December 2010 after being closed since operation. |
KJ5 | Setiawangsa | Island | Elevated | |
KJ6 | Jelatek | Side | Elevated | |
KJ7 | Dato' Keramat | Side | Elevated | |
KJ8 | Damai | Island | Elevated | |
KJ9 | Ampang Park | Island | Underground | Proposed interchange with 10 Sungai Buloh-Serdang-Putrajaya Line |
KJ10 | KLCC | Island | Underground | |
KJ11 | Kampung Baru | Island | Underground | |
KJ12 | Dang Wangi | Island | Underground | 350 meter walking distance exit paid area station to Bukit Nanas for 8 Monorail Line towards Titiwangsa or KL Sentral. |
KJ13 ST5 | Masjid Jamek | Island | Underground | Exit to 3 Ampang Line & 4 Sri Petaling Line elevated platforms. |
KJ14 | Pasar Seni | Island | Elevated | Exit to upcoming 9 Sungai Buloh-Kajang Line underground platform and walking distance of 250 meter exit paid area station to Kuala Lumpur for 1 Seremban Line & 2 Port Klang Line. The bus hubs below the station for buses route to Kajang, Petaling Jaya, Subang, Shah Alam & Klang. |
KJ15 MR1 | KL Sentral | Side | Elevated |
Exit paid area station to 1 Seremban Line & 2 Port Klang Line, 6 KLIA Ekspres, 7 KLIA Transit, 200 meter walking distance to 8 Monorail Line & and 650 meter walking distance to upcoming Muzium Negara for 9 Sungai Buloh-Kajang Line. |
KJ16 | Bangsar | Side | Elevated | |
KJ17 | Abdullah Hukum | Side | Elevated | Exit paid area station to proposed new rail transit Eco City for 2 Port Klang Line. The proposed station will be build beside the existing Abdullah Hukum . The KL Eco City also will be developed as transit hub with the proposed of 3rd Klang Valley Mass Rapid Transit line's station for MRT Circle Line. |
KJ18 | Kerinchi | Side | Elevated | |
KJ19 | Universiti | Island | Elevated | |
KJ20 | Taman Jaya | Side | Elevated | |
KJ21 | Asia Jaya | Island | Elevated | |
KJ22 | Taman Paramount | Side | Elevated | |
KJ23 | Taman Bahagia | Side | Elevated | |
KJ24 | Kelana Jaya | Terminus | Elevated |
After the station is the maintenance depot near Lembah Subang. The main terminal, filled with long-term parking, bus hub and shops and another bus stop after crossing the LDP. There are shops nearby. |
KJ00 | Subang Depot | Depot | At-grade |
This is train depot in Lembah Subang where the maintenance facility whereby trains are stored, repaired and examined before service. The shuttle train from Subang Depot to Kelana Jaya provided for staff 2 times in the morning & 2 times in the afternoon. Passenger aboard & alight at island platform of pseudo station nearby depot. |
Extension Opening Q3-2016 | ||||
---|---|---|---|---|
KJ25 | Lembah Subang | Side | Elevated | Under construction. The station is located on top of the existing Lembah Subang depot reception track ramp. |
KJ26 | Ara Damansara | Side | Elevated | Under construction. |
KJ27 | Glenmarie | Island | Elevated | Cross-platform interchange to future LRT3 towards Johan Setia or Bandar Utama. |
KJ28 | Subang Jaya | Island | Elevated | Exit paid area station platform to 2 Port Klang Line platforms. |
KJ29 | SS15 | Island | Elevated | Under construction. |
KJ30 | SS18 | Island | Elevated | Under construction. |
KJ31 | USJ 7 | Island | Elevated | Under construction. Exit to upcoming BRT Sunway Line. |
KJ32 | Taipan | Side | Elevated | Under construction. |
KJ33 | Wawasan | Side | Elevated | Under construction. |
KJ34 | USJ 21 | Side | Elevated | Under construction. |
KJ35 | Alam Megah | Island | Elevated | Under construction. |
KJ36 | Subang Alam | Island | Elevated | Under construction. |
KJ37 PH21 | Putra Heights | Island | Elevated | Cross-platform interchange to 4 Sri Petaling Line towards Sentul Timur. |
Rolling stock
The rolling stock, in use since the opening of the line in 1998, consists of 35 Mark II Bombardier Advanced Rapid Transit (ART) trains[4][11] with related equipment and services supplied by the Bombardier Group and train electronics company Quester Tangent. They consist of two-electric multiple units, which serve as either a driving car or trailer car depending on its direction of travel. The trains utilise linear motors and draw power from a third rail located at the side of the steel rails. The plating in between the running rails is used for accelerating and decelerating the train. The reaction plate is semi-magnetised, which pulls the train along as well as helps it to slow down.
The ART is essentially driverless, automated to travel along lines and stop at designated stations for a limited amount of time. Nevertheless, manual override control panels are provided at each end of the trains for use in an event of an emergency.
The interior of the ART, like its Ampang Line counterparts, consists of plastic seating aligned sideways towards the sides of the train, with spacing for passengers on wheelchair, and spacing in the middle for standing occupants. Since its launch in 1998, the ART rolling stock has remained relatively unchanged; only more holding straps have been added and the labeling has been modified from Putra-LRT to RapidKL. Some of the rolling stock has the majority of the seats removed for added passenger capacity during rush hours.
On 13 October 2006, Syarikat Prasarana Negara signed an agreement with Bombardier Hartasuma Consortium for the purchase of 88 Mark II ART cars (22 train sets of 4-cars) with an option for another 13 for RM1.2 billion.[12] The 22 train sets, initially targeted to be delivered from August 2008 onwards, will have four cars each and will boost the carrying capacity of the fleet by 1,500 people. On 8 October 2007, Syarikat Prasarana Negara exercised its option to purchase an additional 52 Mark II ART cars (13 train sets of 4-cars) for €71 million, expected to be delivered in 2010.
Although the trains were expected to arrive in August 2008, the delivery was delayed to November 2008 by the manufacturer. RapidKL said that the trains will only be usable by September 2009 after having sufficient rolling stocks, power line upgrades and safety testing.[13] Transport Minister, Datuk Seri Ong Tee Keat has said in Parliament that the new trains will begin operations by December 2009.[14] However, in July 2009, Prime Minister Najib Tun Razak announced that the four-car trains will only be fully operational by end-2012.[6]
On 30 December 2009, 3 of the 35 new four-car trains entered commercial service.[15] New features other than increased capacity up to 950 passengers per trip are seat belts for wheel-chair bound travelers, door alarm lights for hearing impaired and more handles for standing commuters.[16]
The Kelana Jaya Line fleet consisted of the following models:
- 35 trainsets of 2-cars INNOVIA ART 200 EMU manufactured by Bombardier Transportation currently in operation since 1998.
- 35 trainsets of 4-cars INNOVIA ART 200 EMU manufactured by Bombardier Transportation currently in operation since end 2012.
- 14 trainsets of 4-cars INNOVIA ART 300 EMU manufactured by Bombardier Transportation on order.
Extensions
On 29 August 2006, Malaysian Deputy Prime Minister Mohd Najib Abdul Razak announced that the western end would be extended to the suburbs of Subang Jaya which are USJ and Putra Heights to the south-west of Kuala Lumpur. The extension will be part of a RM10 billion plan to expand Kuala Lumpur's public transport network.
The expansion plan will also see the Ampang Line extended to the suburbs of Puchong and the south-west of Kuala Lumpur The plan also involved the construction of an entirely new line, tentatively called the Kota Damansara-Cheras Line, running from Kota Damansara in the western portion of the city, to Cheras which lies to the south-east of Kuala Lumpur.
As of August 2008, Syarikat Prasarana Negara was reportedly running land and engineering studies for the proposed extension.[17]
In September 2009, Syarikat Prasarana Negara began displaying the alignment of the proposed extensions over a 3-month period for feedback. The Kelana Jaya extension will see 13 new stations over 17 km from Kelana Jaya to Putra Heights. Construction is expected to commence in early-2010.[4][7][8][18]
On November 2010, Prasarana announced that it has awarded RM1.7 billion for first phase of the project. The winners include Trans Resource Corp Bhd for the Kelana Jaya line extension. UEM Builders Bhd and Intria Bina Sdn Bhd were appointed as subcontractors for the fabrication and supply of segmental box girder jobs for the Kelana Jaya line.[19]
Construction works on the Kelana Jaya Line and the Ampang Line Extension project are targeted to escalate at the end of March, with commencement of structural works, subject to approval from state government and local authorities.[20]
As of 2014, completion of the extension is targeted for 2016.[21] Refer to the previous table in Line and Station section above.
Gallery
-
The street entrance of the KLCC station
-
The recently refurbished concourse level of the Pasar Seni LRT station
-
The concourse level of the Ampang Park station.
-
The platform of Masjid Jamek station is one of only five underground stations along the Kelana Jaya Line.
-
The platform of Dang Wangi LRT station
-
The Kelana Jaya Line station in Kuala Lumpur Sentral.
-
A train of the Kelana Jaya line passing through Asia Jaya
-
The Universiti station at night. It is one of the elevated stations in the system.
-
A 2-car ART Mark II train at Kuala Lumpur Sentral
-
The signage point the way to Line 5 or Kelana Jaya Line platforms taken at Masjid Jamek LRT station.
-
The signage point the way to Line 4 & 5 or Ampang Line and Sri Petaling Line platforms.
-
Putra LRT in 2005
See also
- Prasarana Malaysia Berhad
- Rapid Bus Sdn Bhd
- Rapid KL
- Rapid Penang
- Rapid Kuantan
- Rapid Rail Sdn Bhd
- Rapid KL
- LRT1 - Ampang Line & Sri Petaling Line
- LRT2 - Kelana Jaya Line
- Monorail Line
- LRT3 - Shah Alam Line
- Rapid KL
- Rapid Bus Sdn Bhd
- MRT Corp
- Klang Valley Mass Rapid Transit Project
- MRT1 - Sungai Buloh-Kajang Line
- MRT2 - Sungai Buloh-Serdang-Putrajaya Line
- MRT3 - Circle Line
- Klang Valley Mass Rapid Transit Project
- List of rapid transit systems
- List of driverless trains
- Rail transport in Malaysia
- Public transport in Kuala Lumpur
References
- ↑ 1.0 1.1 "Kelana Jaya Line". RapidKL. Retrieved 2015-04-21.
- ↑ Kelana Jaya Line (Formerly known as PUTRA Line)
- ↑ "RapidKL Puts Marketing Retail Space on Fast Lane". 9 October 2007.
- ↑ 4.0 4.1 4.2 Thousands to Benefit from LRT Extension
- ↑ Bombardier Press release on 71 Million Euro Order by Prasarana
- ↑ 6.0 6.1 "Targets set for the six Key Result Areas". The Star. 28 July 2009.
- ↑ 7.0 7.1 "New LRT Line Extensions on Display from Tomorrow". The Malaysian Insider. 14 September 2009.
- ↑ 8.0 8.1 "Public May Give Feedback on LRT Extension Project". The New Straits Times. 14 September 2009.
- ↑ "Four-carriage trains provide double capacity". The Malay Mail. 8 October 2009.
- ↑ "Four-star ride on LRT with longer coaches". The Star. 31 December 2009.
- ↑ Railway Technology - Kuala Lumpur Driverless Metro System, Malaysia
- ↑ Prasarana Homepage - Prasarana in RM1.2b deal for 35 LRT trains
- ↑ "New trains for Kelana Jaya line will only be usable by Sept 2009". New Straits Times. 4 September 2008.
- ↑ Bernama (5 November 2009). "Ong: Six new LRT trains to run next month". The Edge.
- ↑ "Four-star ride on LRT with longer coaches". The Star. 31 December 2009.
- ↑ Nuradzimmah Daim (1 January 2010). "In for a better ride with new four-car coaches". New Straits Times.
- ↑ "Two extra LRT lines being studied". The Star. 21 August 2008.
- ↑ "RM7bn LRT Extension". The Star. 15 September 2009.
- ↑ "Prasarana awards RM1.7bil jobs for LRT extension". The Star. 27 November 2010.
- ↑ "Construction Works for LRT Extension Project to Commence". Rapid KL. 11 March 2011.
- ↑ http://www.lrtextension.com/about-project/front-page/information-kelana-jaya-line-extension
External links
Wikimedia Commons has media related to Kelana Jaya Line. |
- LRT Line Extension Website (LRT1 KL & LRT2 KL)
- Land Public Transport Commission
- Syarikat Prasarana Negara Berhad
- Rapid KL
- KL MRT Line Integrations
- Klang Valley Mass Rapid Transit (KVMRT) Project
- TransitMy
- App Store
Route Maps
- Route search - Interactive transport guide of Kuala Lumpur public transport system
- Train Journey Planner & Fare Calculator from thepricechat.com
- Route Map from malaysiaexpat.com
- Route Map from ktmb.com.my
- Route Map from prasarana.com.my
- Route Map from stesensentral.com
|
|
|