Jagorawi Toll Road
Coordinates: 06°15′11.20″S 106°52′21.52″E / 6.2531111°S 106.8726444°E
Jakarta-Bogor-Ciawi Jagorawi | |
---|---|
Route information | |
Maintained by PT Jasa Marga Tbk | |
Length: | 47 km (29 mi) |
Major junctions | |
From: | Cililitan |
Jakarta Inner Ring Road Jakarta-Cikampek Toll Road Jakarta Outer Ring Road Jakarta Outer Ring Road 2 Bogor Ring Road. | |
To: | Ciawi |
Location | |
Major cities: | Cibubur, Cimanggis, Gunung Putri, Cibinong, Sentul, South Sentul, Bogor, Ciawi, Sukabumi |
Highway system | |
Roads and Highways in Indonesia |
The Jagorawi Toll Road was the first toll road in Indonesia. Construction on the highway began in 1973 by some 200 workers at a cost of 350 million Indonesian rupiah per kilometer; it was officially opened by President of Indonesia Suharto on 9 March 1978.[1]
The Jagorawi Toll Road links the capital city of Jakarta to the West Javanese cities of Bogor and Ciawi. It has a length of more than 60 km going north and southbound and is operated by PT Jasa Marga, a state-owned enterprise. The name Jagorawi is an acronym of areas which it connects, which are Jakarta, Bogor, and Ciawi.
The toll road has achieved break-even point, making it the cheapeast toll road in Indonesia based on price per kilometer.
History
In 1973, the Indonesian government began building the first highway linking the capital Jakarta with the city of Bogor. When the road was still in its construction phase, it was not officially a toll road. When the highway was nearly finished, the government began considering ways to execute the operation and maintenance of the highway autonomously, without burden on governmental financing. For that purpose, the Labor Department suggested that the portion of the road between Jakarta and Bogor be changed to a toll road. Private investors, with government financing, created the semi-private corporation Jasa Marga and arranged to manage the highway two weeks before its opening.
Exits
Kilometer No. | Exits | Location | Remarks |
---|---|---|---|
KM 3 | Cililitan | roswpan==4 | East Jakarta, DKI Jakarta | Exit To Cawang, UKI And Halim |
KM 4 | Cililitan Toll Barrier | East Jakarta, DKI Jakarta | Access to Jakarta Inner Ring Road, Cawang, Tanjung Priok, Soekarno-Hatta Airport. |
KM 7 | Taman Mini | East Jakarta, DKI Jakarta | Exits To TMII, Pondok Gede, Kramat Jati. |
KM 9 | Dukuh Interchange | East Jakarta, DKI Jakarta | Access to Pasar Rebo, Jakarta Outer Ring Road South, Cipularang Toll Road, Soekarno-Hatta Airport |
KM 12 | Cibubur | Depok, West Java | Exits to Cibubur, Depok, Cileungsi, Cikeas, Bekasi, Cimanggis, Jonggol |
KM 13 | Cibubur Utama | Depok, West Java | Central toll gate From Jakarta And Ciawi. |
KM 16 | Cisalak Interchange | Depok, West Java | Connected to Jakarta Outer Ring Road 2, Cisalak, Margonda, Depok |
KM 18 | Cimanggis Utama | Depok, West Java | Central Toll Gate From Ciawi to Jakarta |
KM 19 | Cimanggis | Depok, West Java | Exits to Cimanggis, Cikeas, Depok (From Jakarta Way Only) |
KM 24 | Gunung Putri | Bogor Regency, West Java | Exits to Gunung Putri, Karanggan, Cikeas |
KM 27 | Citeureup | Bogor Regency, West Java | Exits to Citeureup, Cibinong, Bogor Regency Government Office |
KM 34 | Sentul | Bogor Regency, West Java | Exits to Sentul Circuit, IPSC(Indonesia Peace And Security Center), Nanggewer |
KM 37 | Sentul Selatan | Bogor Regency, West Java | Exits to South Sentul, Sentul City, connected with Bogor Ring Road, Kedunghalang. |
KM 40 | Bogor | Bogor, West Java | Exits to Bogor, Kebun Raya, Sukaraja, Baranangsiang |
KM 47 | Ciawi Toll Barrier | Bogor Regency, West Java | As The end of Jagorawi toll road, Exits to Ciawi, Puncak, Taman Safari, Sukabumi and Bocimi Toll Road (Planned) |
Facilities
The Jagorawi Toll Road is three lanes wide (in each direction) from Jakarta to Sentul, and it is planned that the road will be widened again through Bogor.
The toll road has two Pertamina gas stations which are combined with restaurants, rest areas, and outlet stores.
Notable accidents
On September 8, 2013, the toll road has been a major point for an accident involving Ahmad Dhani and Maia Estianty's youngest son Dul, primarily on the km 8+200 mark. 7 people were killed in the accident and 8 people were severely injured due to the crash. It was revealed that Dul was driving a black Mitsubishi Lancer, as he lost control of his car and hit the metal separator while going home from Bogor to Jakarta, crashing an oncoming Daihatsu Gran Max and a Toyota Avanza.
Floods
For the first time in January 2014, Jagorawi Toll Road was flooded from Cipinang River at Kilometer 4. The toll road was still operational in both directions, with vehicles driving slowly through the flood. Consequently, the toll road suffered from severe gridlock. [2]
Ciawi-Sukabumi Toll Road
Ciawi-Sukabumi Toll Road is a planned 54-km extension of Jagorawi Toll Road, subdivided into 4 sections:[3]
- Ciawi-Cigombong, 15 kilometers
- Cigombong-Cibadak, 12 kilometers
- Cibadak-West Sukabumi, 14 kilometers
- West Sukabumi-East Sukabumi, 13 kilometers
Concession is held by PT Trans Jabar Toll and land acquisition at January 2013 is 40 percent and predicted the construction will be initialized at end of 2013. However, construction is delayed due to problematic land acquisition.[4]
References
- ↑ Arief Rahman Topan, "Jagorawi", Jurnal Republik, 15 September 2007.
- ↑ "Jagorawi Toll Road Paralyzed due to Heavy Rain". January 13, 2014.
- ↑ "Pembangunan tol Ciawi-Sukabumi dimulai akhir 2013". February 6, 2013.
- ↑ Suryanis, Afrilia. "Pemprov Geber Pembangunan Tol Bocimi". Republika Online. Retrieved 14 March 2014.
External links
|