Interstate 86 (Pennsylvania–New York)

This article is about the current alignment of I-86 in Pennsylvania and New York. For the former alignment of I-86 east of East Hartford, Connecticut, see Interstate 84 (Pennsylvania–Massachusetts). For the highway in the state of Idaho also designated Interstate 86, see Interstate 86 (Idaho).

Interstate 86 marker

Interstate 86

Map of Pennsylvania and New York with I-86 highlighted in red. Its future routing is marked with a dashed red line.
Route information
Maintained by PennDOT and NYSDOT
Existed: December 3, 1999[1] – present
Main segment
Length: 212.69 mi[2][3] (342.29 km)
West end: I-90 near Erie, PA
Major
junctions:
US 219 near Salamanca, NY
I-390 near Avoca, NY
I-99 / US 15 near Corning, NY
East end: Tioga County line in Waverly
Eastern segment
Length: 9.96 mi[3] (16.03 km)
West end: I-81 near Binghamton, NY
East end: NY 79 in Windsor, NY
Highway system
PA 85PAPA 86
NY 85ANYNY 86

Interstate 86 (I-86) is an Interstate Highway that extends for 207 miles (333 km) through northwestern Pennsylvania and southern New York in the United States. The highway currently exists in two segments: the longer of the two begins at an interchange with I-90 east of Erie, Pennsylvania, and ends at the Chemung-Tioga County line, while the second extends from I-81 east of Binghamton to NY 79 in Windsor. When projects to upgrade the existing NY 17 to Interstate Highway standards are completed, I-86 will extend from I-90 near Erie to the New York State Thruway (I-87) in Woodbury. The current and future alignment of I-86 is known as the Southern Tier Expressway west of I-81 in Binghamton and the Quickway east of I-81.

I-86 currently travels 6.99 miles (11.25 km) in Pennsylvania and 199.86 miles (321.64 km) in New York. Except for a section of about 1.5 miles (2.4 km) that dips into Pennsylvania near the New York village of Waverly and the Pennsylvania borough of South Waverly, the rest of I-86 will be in New York. The section of NY 17 through South Waverly is maintained by the New York State Department of Transportation (NYSDOT), however. The Southern Tier Expressway section of I-86 and NY 17 comprises Corridor T of the Appalachian Development Highway System. I-86 connects to U.S. Route 219 (US 219) in Salamanca, I-390 near Avoca and I-99 / US 15 just west of Corning.

Most of the Quickway and the Southern Tier Expressway was built in stages from the 1950s to the 1980s. The I-86 designation was officially assigned on December 3, 1999, to the entirety of since-decommissioned northwestern part of Pennsylvania Route 17 (PA 17) and to the westernmost 177 miles (285 km) part of NY 17. It has been extended eastward as more sections of the existing NY 17 freeway have been upgraded to Interstate Highway standards, first to NY 14 in Horseheads in 2004, to NY 352 in Elmira in 2008, and its current terminus at the Chemung-Tioga County line in 2013. The segment of NY 17 between I-81 and NY 79 was designated as part of I-86 in 2006.

Route description

Lengths
  mikm
PA style="text-align:right;" data-sort-value="7004112605799680000"|6.997 11.26[2]
NY style="text-align:right;" data-sort-value="7005321643491840000"|199.86 321.64[3]
Total style="text-align:right;" data-sort-value="7005332892806400000"|206.85 332.89

Pennsylvania to Olean

I-86 begins at an interchange with I-90 in a relatively flat area of northwestern Pennsylvania. It heads to the southeast, meeting PA 89 at exit 3 before curving to the east and crossing into New York, where it becomes concurrent to NY 17. The freeway heads generally east–west across southwest Chautauqua County, serving the hamlet of Findley Lake and the village of Sherman via NY 426 and NY 76, respectively, as it proceeds toward Chautauqua Lake.

Entering Pennsylvania on I-86 westbound

After crossing Chautauqua Lake, I-86 merges into an older section of freeway at exit 10 near Bemus Point; this freeway is now NY 954J northwest of the newer extension. NY 954J runs into NY 430, which (along with NY 394) carried NY 17 to Westfield before the 1980s extension. From Bemus Point to Jamestown (exit 12), I-86 parallels the old NY 17  now NY 430  along the northeast shore of Chautauqua Lake. The Erie Railroad extension to Chicago (built as the Atlantic and Great Western Railroad) comes into Jamestown from the southwest, and parallels I-86 to its junction with the Erie's original main line to Dunkirk at Salamanca.

From Jamestown to Salamanca, the old NY 17 (now mostly NY 394), the new I-86 and the railroad run generally parallel through river valleys. The transportation routes run along the Chadakoin River, Conewango Creek and Little Conewango Creek to Steamburg (exit 17), cutting east to the Allegheny River at Coldspring there. The valley of the Allegheny takes the routes to Salamanca (exit 20), where the railroads merged, and beyond to Olean (exits 25 and 26). From Salamanca to Olean, the old NY 17 is now NY 417. At Olean, the Allegheny River and NY 417 (old NY 17) continue southeast, while I-86 and the Erie Railroad head northeast. NY 417 does not return to I-86 until exit 44 near Painted Post, and the Erie switches between the two alignments several times.

Olean to Elmira

I-86 and the old Erie line (now part of the Western New York and Pennsylvania Railroad) run northeast along the valleys of the Olean Creek and Oil Creek to Cuba (exit 28). From Cuba to Friendship (exit 29), they run through a valley and over a summit, then following the Van Campen Creek northeast to Belvidere (exit 30). At Belvidere, the Erie turns southeast to meet NY 417 at Wellsville, but I-86 continues northeast through the valleys of the Genesee River and Angelica Creek to Angelica (exit 31), and then east along the Angelica Creek, over a summit which is the highest point on the Interstate, and along the Karr Valley Creek to Almond (exit 33). This summit, at 2,110 feet (634 m) above sea level, is the highest point along I-86, located between exits 32 (West Almond) and 33 and marked with a sign.[4]

Signage denoting the highest point on I-86 in Almond

At Almond, I-86 rejoins the Erie Railroad, passing through the Canacadea Creek valley about halfway to Hornellsville. However, where the railroad turns southeast to Hornellsville, I-86 continues northeast across a summit and into the wide Canisteo River valley (exit 34). It leaves the valley along the Carrington Creek, but quickly turns east across a summit to follow the Big Creek and cross another summit to Howard (exit 35). I-86 runs alongside Goff Creek from Howard to the wide Cohocton River valley, where it meets the south end of I-390 (exit 36) near Avoca and turns southeast through that valley, parallel to the Erie's RochesterPainted Post line (Buffalo, New York and Erie Railroad).

I-86, NY 415 (old US 15) and the Erie branch all run southeast along the Cohocton River past Bath (exit 38) to Painted Post (exit 44), now the north end of Interstate 99 and US 15. NY 417  old NY 17  also ends at exit 44, while NY 415 continues east into Corning (exits 45–46). From Painted Post through Corning to Big Flats (exit 49), I-86, NY 352 (old NY 17) and the Erie Railroad run through the Chemung River valley. NY 352 begins at exit 45, west of downtown Corning, and is a recently bypassed four-lane road through Corning. East of East Corning (exit 48), the freeway was built as an on-the-spot upgrade of the old NY 17.

I-86 signage along the 10 miles of NY 17 co-designated as I-86 just east of the NY 17 / I-81 interchange

At Big Flats, the Chemung River (and NY 352) turns southeast to downtown Elmira, while I-86 and the Erie continue east-northeast alongside Singsing Creek to the vicinity of Elmira/Corning Regional Airport. The highway continues into Horseheads, where it becomes an elevated highway through the use of a large arrangement of embankments and bridges. It connects to NY 14 and NY 13 via exits 52 and 54, respectively, before turning south to follow Newtown Creek into Elmira. Just east of the city's downtown district, I-86 meets NY 352 (exit 56). The I-86 designation ends here; however, a 9.9-mile (15.9 km) section of NY 17 just east of Binghamton is also designated as I-86, creating a temporary gap in the designation. The Broome County segment runs from I-81 at exit 75 in Kirkwood to NY 79 at exit 79 in Windsor.

A third segment is set to open in Fall 2014, in the Middletown area. This portion extends from Interstate 84 at the brand new exit 121 to NY 17K in Bloomingburg, New York.

History

Origins and the Quickway

The first long-distance route through the modern I-86 corridor was NY 17, which extended from Westfield to New Jersey via Harriman when it was assigned in 1924.[5] Much of NY 17 followed a routing parallel or identical to that of the modern Southern Tier Expressway and Quickway; however, it followed a more northerly routing between Westfield and Bemus Point (via modern NY 394 and NY 430) and a more southerly track from Belvidere to Corning (via what is now NY 19 and NY 417).[6] NY 17 was realigned as part of the 1930 renumbering of state highways in New York to travel directly from Olean to Wellsville on modern NY 417, located well to the south of today's Southern Tier Expressway.[7]

NY 17 (future I-86) at Liberty

By the late 1940s, the portion of NY 17 through the Catskill Mountains and Orange and Rockland Counties had become prone to massive traffic jams due to both its winding and narrow composition and congestion in the villages and hamlets along the highway. As a result, the state of New York began making plans to construct an expressway leading from the New York State Thruway at Harriman to the Catskills.[8] Construction of the NY 17 freeway began in 1947 in the Hudson Valley town of Wallkill.[9] The first section of the new freeway, a bypass of Middletown between Fair Oaks (exit 118A, since removed) and Goshen (exit 123), opened to traffic in July 1951 as a realignment of NY 17. In 1954, several severe accidents occurred along parts of the surface NY 17, compelling the state to make constructing the freeway, dubbed the "Quickway", a higher priority.[8]

The road was extended east first, reaching Chester (exit 127) in October 1954 and the Thruway near Harriman in August 1955.[8] To the west, a section of the highway through Sullivan and Delaware Counties was built over the right-of-way of the defunct Ontario & Western Railway. Most of the Sullivan County section of the Quickway was completed during the 1950s, with the first section within the county—between Rock Hill (exit 108) and Wurtsboro (exit 114)—opening in December 1956. A second section, from Ferndale (exit 101) to north of Liberty (exit 98), was completed in July 1958. The gap between Wurtsboro and Fair Oaks in Orange County was filled on October 23, 1958, while the section between Ferndale and Rock Hill was completed in two stages. The section east of modern exit 104 in Monticello was opened in July 1959; the part north of that point opened in December 1960.[8]

By 1969, with the assistance of federal funding from the Appalachian Regional Commission procured by New York's U.S. Senator Robert F. Kennedy, the 130-mile (209 km) route provided nonstop access between Harriman and Binghamton, from the New York State Thruway (I-87) to I-81. Despite flaws in the highway's design it included a grade-level railroad crossing near Fair Oaks (since removed) and two stretches with intersections and driveway access the Quickway succeeded in easing travel through southern New York, cutting the driving time in half and the accident rate by 70 percent.[10]

Southern Tier Expressway

Sign along eastbound NY 17 (future I-86) marking return to New York after its brief foray into Pennsylvania.

In February 1953, New York Governor Thomas Dewey proposed constructing four superhighways across the state to supplement the New York State Thruway. One of the four proposed limited-access highways would cut across the Southern Tier, linking I-90 in the west to Binghamton in the east.[11][12] The first segments of what became known as the Southern Tier Expressway, a westward continuation of the Quickway, were completed in the mid-1960s. Four sections were opened to traffic at this time: Kennedy (exit 14) to Randolph (16); Coldspring (17) to western Salamanca (20); Campbell (41) to Corning (45); and East Corning (48) to Lowman (57), parts of which were built as a surface highway.[13][14] A fifth section, from Owego (65) to Johnson City (69), opened in early 1969.[15] The portion of the expressway between Nichols (exit 62) and Owego was opened to traffic on October 3, 1969.[16]

Route marker used along the Southern Tier Expressway

Four more segments of the Southern Tier Expressway were completed over the course of the next three years. By 1972, the gaps between Randolph and Coldspring and from Johnson City to I-81 in Binghamton were filled while the expressway was extended west from Kennedy to Falconer (exit 13) and east from Lowman to Waverly (exit 60).[17] The missing link between Waverly and Nichols was completed by 1974.[18] The portion of the freeway in and around Waverly was originally planned to be built on the right-of-way of the Delaware, Lackawanna and Western Railroad through southern Waverly; however, the plan was scrapped in favor of a more southerly alignment that passed through the borough of South Waverly, Pennsylvania. The realignment saved $2 million (equivalent to $11.6 million in 2015) in construction costs and spared a handful of industries in the highway's proposed path. Both state legislatures approved the realignment in 1966 after New York agreed to maintain the section of the freeway in Pennsylvania. As part of an agreement made between the two states, Pennsylvania acquired the necessary right-of-way and easements for the freeway at the expense of New York.[19][20]

Three other segments of the freeway were completed by 1974. Two of the three—from Jamestown (exit 11) and Falconer and between Almond (33) and Campbell—were extensions of pre-existing sections while the third, connecting Allegany (24) to Hinsdale (27), was isolated from the other portions of the highway.[18] This was only temporary, however, as the freeway was completed between Hinsdale and Belvidere (exit 30) by January 1975 and opened to traffic from Belvidere to Almond on January 30, 1975.[21] The Southern Tier Expressway was extended westward to Bemus Point by 1977, initially utilizing what is now NY 954J.[22] In the early 1980s, work began on a westward extension to the vicinity of Erie, Pennsylvania. The Findley Lake–Bemus Point (exits 410) segment was completed by 1985[23][24] while the portion from I-90 east of Erie to Findley Lake was opened by 1989. From I-90 to exit 8, the freeway was initially built as a super two highway, with both directions utilizing what are now the eastbound lanes.[25] The westbound lanes were built at a cost of $34 million (equivalent to $49.9 million in 2015) and opened to traffic on October 2, 1997.[26][19]

Salamanca and Corning

Construction of the freeway between exits 20 and 24 was delayed for several years by members of the Seneca nation, who objected to the freeway's proposed routing through the Allegany Indian Reservation. On June 29, 1976, the state of New York made an agreement with the Seneca nation that paid approximately $1.8 million (equivalent to $7.46 million in 2015) to the Seneca nation and property owners for the 795 acres (322 ha) of land comprising the highway's proposed routing. In addition, the state ceded 795 acres (3.22 km2) of land to the Seneca nation—750 of which were taken from the adjacent Allegany State Park—and agreed to support several tax and regulatory exemptions for the Senecas.[19][27] The transaction was completed in September 1981,[28] and construction on the segment began in 1982.[29] The portion of the expressway between exits 20 and 21 was completed by 1985.[24]

Eastbound on I-86 and southbound on US 219 near Salamanca

On July 21, 1985, construction was halted by protesting Seneca Indians who did not accept the authority of the Seneca nation. The protest was organized in part by two owners of property in the path of the highway and involved the construction of an encampment on the right-of-way of the Southern Tier Expressway. The state had conducted studies on realigning the highway to bypass the disputed section;[29] however, the Indians vacated the encampment five days later. A temporary injunction prohibiting further disruptions of the highway's construction was issued in early August, allowing work on the Salamanca–Seneca Junction (exit 23) section of the expressway to resume on August 13.[30] This segment was completed by 1989[25] while the last section between Seneca Junction and Allegany was opened to traffic by 1995.[31]

Work on the Corning Bypass, a freeway around the northern and eastern fringes of the city of Corning, began in the mid-1980s. The first segment of the highway—between NY 414 (exit 46) and East Corning—was completed by 1989[24][25] while the rest opened in the mid-1990s. The completion of the Corning Bypass, the last substantial gap in the freeway, created a continuous, mostly limited-access highway between Erie, Pennsylvania, and Harriman, New York. The completed highway, designated as PA 17 and NY 17,[31][32] serves as a time-saving, non-toll shortcut past the Thruway for motorists going from the New York City area to Ohio and points west. In fact, the New York State Thruway Authority initially opposed the highway's construction, fearing the loss of toll revenue on its own route from motorists shunpiking via the free alternate route.[10]

Designation and conversion

The portion of the two-state freeway from I-90 near Erie to I-81 in Binghamton is designated as Corridor T of the Appalachian Development Highway System.[33][34] In 1998, all of PA 17 and the portion of NY 17 from the Pennsylvania state line to Harriman were designated "High Priority Corridor 36" in the Transportation Equity Act for the 21st Century (TEA-21).[35] New York politicians, including Senator Daniel Patrick Moynihan, and businessmen backed the move in the hope that an efficient, high-speed roadway would inspire companies to do business in the state's southern counties.[36] Shortly after the passage of TEA-21, Corridor 36 was legislatively designated as I-86 in an amendment to the bill.[37] The American Association of State Highway and Transportation Officials formally approved the designation on November 6, 1998, as "Future I-86".[38]

Approaching exit 53 on the westbound Horseheads Bypass (I-86)

On December 3, 1999, all of PA 17 and the westernmost 177 miles (285 km) of NY 17 were officially designated as I-86 by the Federal Highway Administration (FHWA)[1][39] following improvements to bring the roadway up to Interstate Highway standards.[10] The designation was extended 8 miles (13 km) eastward to NY 14 in Horseheads on January 28, 2004,[39] after that section had been brought up to standards.[40] On May 1, 2006, the 10-mile (16 km) portion of NY 17 from I-81 in Binghamton east to NY 79 in Windsor was designated as part of I-86[39] following the elimination of at-grade intersections and the reconstruction of exit ramps along the stretch. The completion of the $30 million project increased the total mileage of I-86 to 195 miles (314 km)[41] and created a temporary gap in the designation.[39]

In Horseheads, a $60 million project to elevate the highway and remove at-grade intersections in the village between NY 14 (exit 52) and NY 13 (exit 54) began in April 2004 and was completed on August 20, 2007. NYSDOT subsequently sought permission from FHWA to extend I-86 over the new bypass and the existing NY 17 freeway to NY 352 in Elmira;[42] it was granted on March 28, 2008, adding another 5.9 miles (9.5 km) to the route.[43]

A 6.5-mile (10.5 km) portion of NY 17 between exits 56 and 59 originally had several at-grade intersections. Work on a project to eliminate the junctions began in January 2010.[44] Three discontinuous sections of County Route 60 (CR 60, named Brant Road, Oneida Road, and Old NY 17), a parallel surface road, were linked together as part of the project.[33] Two of the three at-grade junctions with CR 60—the east junction with Brant Road and the west junction with Oneida Road—were permanently closed on March 24, 2010, to allow construction to begin on the new alignment of the county route between the two locations.[45] The $65,585,000 project was completed on November 1, 2012.[44]

Future

A sign indicating NY 17's transition to I-86 near Goshen
New bridges built during the Prospect Mountain project at the junction of NY 17 with I-81

Additional portions of NY 17 will be designated as I-86 after at-grade sections are eliminated and the highway is brought up to Interstate Highway standards. Eventually, the entire portion of NY 17 west of the Monroe/Woodbury area where it intersects the Thruway/I-87 will become I-86.

The conversion was originally expected to be complete by 2009,[46] and later by 2012;[10] however, a lack of funding for the necessary upgrades has pushed the target date as far back as 2018.[46] Temporary signs mark the route as "Future I-86" where it is not already designated as I-86.[47] Cost estimates for the I-86 renovation ranged from $550 million to $900 million in the early 2000s.[10]

Several projects to improve sub-standard sections of NY 17 are either under construction or in development as part of the conversion. The largest of these involves improvements to the interchange with I-81 in Binghamton near the stretch named Kamikaze Curve. As part of the project, the NY 17 approach to the junction will be modified, a requirement for interstate designation, and exit 72 westbound will be moved further west. Work on the Prospect Mountain project, as it is known by NYSDOT, began in late 2011 and is projected to last until early 2018.[48][49] The projected total cost of the project is $331.8 million.[48][49]

Other projects that need to be completed to extend I-86 eastward include the elimination of at-grade intersections in the Catskills between exits 84 and 87 and other interchange improvements in the Catskills and in Orange County. One at-grade intersection in the Catskills, a junction in Parksville signed as exit 98, was replaced by a $96 million, 3-mile (4.8 km) bypass of the hamlet in late 2011. The eastbound lanes of the new highway opened to traffic in September; the westbound section was finished in November.[50]

Exit list

Pennsylvania uses milepost-based exit numbers on its Interstate Highways; other I-86 exits are numbered sequentially.

StateCountyLocationmi[2][3]kmExitDestinationsNotes
PennsylvaniaErieGreenfield Township0.0000.0001 I-90 Erie, BuffaloWestbound exit and eastbound entrance; signed as 1A (west) and 1B (east)
3.7306.0033 PA 89 Wattsburg, North East
6.997
0.00
11.261
0.00
New York–Pennsylvania border
New YorkChautauquaMina1.031.664 NY 426 Findley Lake
Village of Sherman9.1714.766 NY 76 Sherman
North Harmony15.3424.697Panama, Chautauqua Institution
18.8630.358 NY 394 Mayville, Lakewood
Ellery20.2232.549 NY 430 east Bemus PointEastbound exit and westbound entrance
20.2932.6510 To NY 430 Bemus Point
Ellicott26.2342.2111Strunk Road (NY 953B)
28.0045.0612 NY 60 Jamestown
30.6949.3913 NY 394 Falconer
Poland36.0458.0014 US 62 Kennedy, Warren
CattaraugusTown of Randolph39.3363.3015School House Road (NY 953A)
41.3866.5916West Main Street (NY 952M) – Randolph, GowandaHamlet of Randolph
Coldspring47.8877.0617 NY 394 Steamburg, Onoville
50.6181.4518 NY 280 Allegany State Park, Quaker Run Area
Red House54.4387.6019Allegany State Park, Red House Area
City of Salamanca58.1493.5720 NY 417 to NY 353 – Salamanca
60.4597.2821 US 219 north (Parkway Drive) – SalamancaWest end of I-86 / US 219 overlap
Carrollton67.52108.6623 US 219 south Limestone, BradfordEast end of I-86 / US 219 overlap
Town of Allegany74.07119.2024 NY 417 Allegany, St. Bonaventure University
Olean77.27124.3525Buffalo Street (NY 954E) Olean
78.77126.7726 NY 16 Olean
Hinsdale84.69136.3027 NY 16 / NY 446 Hinsdale
AlleganyVillage of Cuba91.35147.0128 NY 305 Cuba
Friendship98.72158.8729 NY 275 Friendship, Bolivar
Amity104.45168.1030 NY 19 Belmont, Wellsville
Village of Angelica108.55174.6931Angelica
West Almond115.78186.3332CR 2 West Almond
Village of Almond123.61198.9333 NY 21 Almond, Andover
SteubenHornellsville128.30206.4834 NY 36 Hornell, ArkportSigned as 34A (south) and 34B (north). Originally signed as 34S (south) and 34N (north)
Howard137.98222.0635 CR 70 Howard (NY 962B)
Village of Avoca145.17233.6336 I-390 north Rochester, Buffalo
Town of Bath146.30235.4537 NY 53 – Kanona, Prattsburg
Village of Bath149.50240.6038 NY 54 Bath, Hammondsport
Town of Bath152.61245.6039 NY 415 Bath
156.40251.7040 NY 226 Savona
Campbell161.20259.4341 CR 333 Campbell
165.24265.9342 CR 26 – Coopers Plains (NY 960M)
Erwin167.51269.5843 NY 415 Painted Post
Painted Post168.64271.4044A I-99 south / US 15 south / Robert Dann Drive WilliamsportNorthern terminus of I-99 and US 15
168.64271.4044B NY 417 Gang Mills, Painted Post
Riverside169.02272.0145 NY 352 Riverside, Downtown CorningEastbound exit and westbound entrance
45 NY 415 RiversideWestbound exit and eastbound entrance
Town of Corning171.49275.9946 NY 414 Watkins Glen, Corning Museum of Glass
174.20280.3547 NY 352 Gibson, East Corning, Downtown Corning
176.57284.1648 NY 352 – East Corning
ChemungTown of Big Flats178.85287.8349Big Flats
50CR 63 (Kahler Road) Elmira/Corning Regional Airport
182.30293.3851AChambers Road – Shopping Malls, Elmira/Corning Regional Airport
51BColonial Drive – Shopping MallWestbound exit only
Town of Horseheads52ACommerce Center Road (NY 962E)No westbound exit
184.35296.6852B NY 14 Watkins Glen, Elmira HeightsSigned as 52B (south) and 52N (north) westbound
53Horseheads
185.72298.8954 NY 13 Ithaca, Horseheads
Elmira189.90305.6156 NY 352 Elmira, Jerusalem Hill
Ashland195.68314.9257CR 2 / CR 8 / CR 60 Lowman, Wellsburg
58CR 60 Lowman
Chemung200.96323.4159 NY 427 ChemungEastern terminus of NY 427
203.22327.0559AWilawana, PA
New York–Pennsylvania border
PennsylvaniaBradfordSouth Waverly205.19330.2260 US 220 Waverly, Sayre
New York–Pennsylvania border
Temporary gap in I-86 designation; see NY 17 for exits 61 through 74
New YorkBroomeKirkwood249.62401.7275 I-81 south / US 11 Scranton, Industrial Park (NY 990G)Exit number signed westbound only
251.31404.4476Haskins Road / Foley Road
Town of Windsor77West Windsor
256.25412.3978Dunbar Road – Occanum
Village of Windsor259.64417.8579 NY 79 Windsor
Temporary east end of I-86; highway continues east as NY 17
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. 1.0 1.1 "Economic Impacts Study of I-86 and US 11 Corridors". Federal Highway Administration. Retrieved May 6, 2010.
  2. 2.0 2.1 2.2 Bureau of Maintenance and Operations (January 2013). "Roadway Management System Straight Line Diagrams". Pennsylvania Department of Transportation. Retrieved April 20, 2014.
  3. 3.0 3.1 3.2 3.3 "2008 Traffic Volume Report for New York State" (PDF). New York State Department of Transportation. June 16, 2009. pp. 52–53, 140–141. Retrieved May 6, 2010.
  4. Stuve, Eric (January 4, 2006). "Interstate 86 New York – Eastbound – Pennsylvania State Line to Almond". OKRoads. Retrieved May 7, 2010.
  5. "New York's Main Highways Designated by Numbers". The New York Times. December 21, 1924. p. XX9.
  6. Rand McNally Auto Road Atlas (western New York) (Map). Rand McNally and Company. 1926. Retrieved May 6, 2010.
  7. Dickinson, Leon A. (January 12, 1930). "New Signs for State Highways". The New York Times. p. 136.
  8. 8.0 8.1 8.2 8.3 Ingraham, Joseph C. (October 19, 1958). "Paving the Way to the Catskills". The New York Times. p. X30.
  9. National Bridge Inventory, a database compiled by the United States Department of Transportation Federal Highway Administration, available at www.nationalbridges.com. Accessed December 18, 2007.
  10. 10.0 10.1 10.2 10.3 10.4 Anderson, Steve. "Quickway (I-86 and NY 17)". NYCRoads. Retrieved October 5, 2007.
  11. Dee Rubin, Lucille (August 15, 1954). "Route 17 Bypass; Improvement is Promised for Heavily Traveled Road to the Catskills". The New York Times. pp. X15.
  12. Dales, Douglas (June 20, 1954). "Across The Map; Limited-Access Highways Spreading Rapidly from Maine to the Midwest". The New York Times. pp. XX21.
  13. New York (Map). Cartography by Rand McNally. Mobil. 1965.
  14. New York (Map) (1969–70 ed.). Cartography by General Drafting. Esso. 1968.
  15. "On Renumbering Route 17: How State Uses New Math". The Evening Press (Binghamton, NY). October 10, 1969.
  16. "Tioga expressway section to open Oct. 3". The Sun-Bulletin (Binghamton, NY). September 19, 1969.
  17. New York and New Jersey Tourgide Map (Map) (1972 ed.). Cartography by Rand McNally and Company. Gulf. 1972.
  18. 18.0 18.1 New York and New Jersey Tourgide Map (Map). Cartography by Rand McNally and Company. Gulf. 1974.
  19. 19.0 19.1 19.2 Consumer Price Index (estimate) 1800–2014. Federal Reserve Bank of Minneapolis. Retrieved February 27, 2014.
  20. Seibel, Paul E. (July 22, 1971). "N.Y. Highway Cuts Through State's Edge". Gettysburg Times. p. 9. Retrieved May 7, 2010.
  21. "Southern Tier Road Opening Set Thursday". Schenectady Gazette. January 28, 1975. p. 34. Retrieved May 7, 2010.
  22. New York (Map) (1977–78 ed.). Cartography by General Drafting. Exxon. 1977.
  23. I Love New York Tourism Map (Map). Cartography by Rand McNally and Company. State of New York. 1981.
  24. 24.0 24.1 24.2 New York (Map). Rand McNally and Company. 1985. ISBN 0-528-91040-X.
  25. 25.0 25.1 25.2 Pennsylvania Official Transportation Map (PDF) (Map). Pennsylvania Department of Transportation. 1989. Retrieved May 6, 2010.
  26. McCarthy, Sheila (October 3, 1997). "Governors Rejoice As Highway's Final Section Opens". The Buffalo News. p. 5C.
  27. "DOT-Indian Pact Paves Way to Fill Gap on Expressway". Schenectady Gazette. Associated Press. June 30, 1976. p. 10. Retrieved May 7, 2010.
  28. Levine, Richard; Douglas, Carlyle C. (September 27, 1981). "The Region; An Indian Deal On Equal Terms". The New York Times. Retrieved May 7, 2010.
  29. 29.0 29.1 "State Buys Parcels In Path of Highway Blocked by Indians". Schenectady Gazette. Associated Press. August 2, 1985. p. 12. Retrieved May 7, 2010.
  30. "Police Charge Dissident Blocked Highway Work". Schenectady Gazette. Associated Press. August 14, 1985. p. 14. Retrieved May 7, 2010.
  31. 31.0 31.1 New York (Map). Rand McNally and Company. 1995. ISBN 0-528-96764-9.
  32. Road Atlas – United States, Canada, Mexico (Map). Rand McNally and Company. 1999. pp. 69, 71. ISBN 0-528-84004-5.
  33. 33.0 33.1 "Status of Corridors in New York" (PDF). Appalachian Regional Commission. September 30, 2009. Retrieved May 6, 2010.
  34. "Status of Corridors in Pennsylvania" (PDF). Appalachian Regional Commission. September 30, 2009. Retrieved May 6, 2010.
  35. "Transportation Equity Act for the 21st Century – Subtitle B: General Provisions". Federal Highway Administration. Retrieved May 6, 2010.
  36. "New York I-86 – Economic Development". Federal Highway Administration. Retrieved May 6, 2010.
  37. "TEA-21 (PL 105-178) as amended by the TEA-21 Restoration Act (PL 105-206)" (PDF). Federal Highway Administration. p. 95. Retrieved May 6, 2010. The portion of the route referred to in subsection (c)(36) is designated as Interstate Route I–86.
  38. "Route Numbering Committee Agenda" (PDF). American Association of State Highway and Transportation Officials. November 6, 1998. p. 13. Retrieved May 6, 2010.
  39. 39.0 39.1 39.2 39.3 "N.Y.S. Route 17 Designation to I-86" (PDF). New York State Department of Transportation. November 5, 2006. Retrieved May 6, 2010.
  40. "Governor Announces Eight New Miles Of Interstate 86" (Press release). New York State Department of Transportation. February 4, 2004. Retrieved October 5, 2007.
  41. "State Route 17 Becomes Interstate 86 From Kirkwood (Exit 75) To Windsor (Exit 79) (Broome County)" (Press release). New York State Department of Transportation. October 11, 2006. Retrieved September 13, 2007.
  42. "NYSDOT Announces Completion of $60 Million Route 17 Bypass" (Press release). New York State Department of Transportation. August 20, 2007. Retrieved May 6, 2010.
  43. Ray, James D. (March 28, 2008). "Letter from the Federal Highway Administration to NYSDOT" (PDF). American Association of State Highway and Transportation Officials. Retrieved May 6, 2010.
  44. 44.0 44.1 "NYS Route 17 – Elmira to Chemung". New York State Department of Transportation. Retrieved February 1, 2013.
  45. "Route 17 Reconstruction, Towns of Elmira, Ashland & Chemung and City of Elmira Chemung County" (Press release). New York State Department of Transportation. March 22, 2010. Retrieved May 7, 2010.
  46. 46.0 46.1 Zick, John (February 19, 2012). "I-86 work still far behind schedule". Corning Leader. Retrieved June 2, 2012.
  47. "New York I-86 Statement by Martin Weiss". Federal Highway Administration. Retrieved October 5, 2007.
  48. 48.0 48.1 "Route 17 at Prospect Mountain". New York State Department of Transportation. Retrieved May 7, 2010.
  49. 49.0 49.1 "81I / 17 Interchange Reconst. Phase II". New York State Department of Transportation. Retrieved January 30, 2013.
  50. Whitman, Victor (September 21, 2011). "Part of I-86 project opens in Parksville". Times Herald-Record (Middletown, NY). Retrieved June 2, 2012.

External links

Wikimedia Commons has media related to Interstate 86 (Pennsylvania–New York).

Route map: Bing