Hardy Farm Metrolink station
Hardy Farm |
---|
Metrolink |
Location |
---|
Place |
Chorlton-cum-Hardy |
---|
Local authority |
City of Manchester |
---|
Fare zone information |
---|
Present status |
Proposed station |
---|
History |
---|
Opening |
N/A |
---|
Manchester Airport Line
|
|
|
UK Trams portal |
Hardy Farm Metrolink station was a proposed future station on the phase 3b plans to Manchester Airport. It was due to open in 2016 but was dropped from the plans.
References
Preceding station |
|
Manchester Metrolink |
|
Following station |
|
Under Construction |
|
towards Manchester Airport | | Manchester Airport Line | | |
Coordinates: 53°25′49″N 2°16′42″W / 53.4303°N 2.2784°W / 53.4303; -2.2784
|
---|
| Stations | City zone | |
---|
| Airport Line | |
---|
| Altrincham Line | |
---|
| | |
---|
| Eccles Line | |
---|
| South Manchester Line | |
---|
| Oldham & Rochdale Line | |
---|
| East Manchester Line | |
---|
| |
---|
| Operations | |
---|
| History (Timeline) | Former operators | |
---|
| Transferred lines | |
---|
| Closed stations | |
---|
| Abandoned plans | |
---|
|
---|
| Under Construction | |
---|
| Proposed | Bury Line | |
---|
| Trafford Line | |
---|
| Stockport Line |
- Gorsey Bank
- Heaton Mersey
- Kings Reach
- Stockport Interchange
![Bus interchange](../I/m/BSicon_BUS.svg.png)
|
---|
|
---|
| |
|