Guiyang–Guangzhou High-Speed Railway

Guiyang-Guangzhou
High Speed Railway
贵广高速铁路
Overview
Status Operational
Locale Guiyang
Guangzhou
Termini Guiyang East
Guangzhou South
Services 1
Operation
Opening December 26th 2014
Operator(s) China Railway High-speed
Technical
Line length 856 km (532 mi)[1]
Track gauge 1,435 mm (4 ft 8 12 in)
Operating speed 250 km/h (155 mph)
Guiyang-Guangzhou HSR Route Map
Legend
Chongqing-Guizhou HSR
Chengdu-Guiyang HSR
Shanghai-Kunming HSR
Guiyang North
Shanghai-Kunming HSR
Guiyang
Longli North
Changming
Tuyun East
Sandu County
Rongjiang
Congjiang
Guizhou/Guangxi border
Sanjiang South
Wutong
Hunan–Guangxi Railway
Guilin West
Hunan–Guangxi Railway
Guilin North
Hunan–Guangxi Railway
Yangshuo
Gongcheng
Zhongshan North
Luoyang–Zhanjiang Railway
Hezhou
Luoyang–Zhanjiang Railway
Guangxi/Guangdong border
Huaiji
Guangning
Nanning-Guangzhou HSR
Zhaoqing East
Sanshui South
Foshan West
Wuhan-Guangzhou HSR
Guangzhou South
GZ-SZ-HK Express Rail Link

Guiyang-Guangzhou High Speed Railway, is a high-speed rail (HSR) line in southern China between Guiyang and Guangzhou, the provincial capitals, respectively of Guizhou and Guangdong Province. The line, also known as the Guiguang HSR, is dedicated to high speed passenger rail service.[2] The line is 856 km (532 mi) in length and can carry trains at speeds of up to 250 km/h (155 mph).[1] The line was built from 2008 to 2014 and opened on December 26, 2014.

The line traverses rugged karst terrain in Guizhou and Guangxi and relies on extensive bridges and tunnels, which comprise 83% of the line's total length.[2] The travel time by train between the two terminal cities was reduced from 20 hours to 4 hours.[1]

History

Construction progress on the Guiyang-Guangzhou High Speed Railway, bridge over the Xingping Reservoir in Xingping district of Yangshou county, Guilin, August 2013.

The Guiguang HSR was a major trunk route planned in the 11th Five Year Plan by the Chinese government. It is designed to serve as a rapid rail link between the southwest China and the Pearl River Delta. Construction began in 2008 and was completed in 2014. The line was built to accommodate train speeds of up to 250 km/h (155 mph), with the capacity to be remodelled to allow train speeds of up to 300 km/h (186 mph).

Route

The Guigang HSR takes a more direct route between its terminal cities, and crosses exceptionally difficult and mountainous terrain, which made construction very costly. The project cost an estimated 85.8 billion RMB (USD$12.6 billion).[3]

The line runs from Guangzhou through Foshan, Sanshui and Zhaoqing in the densely populated Pearl River Delta and then crosses the Lingnan mountain range via Huaiji into Guangxi. It continues in a northwesterly direction through Hezhou and Zhongxiang to the famed scenic cities of Yangshuo and Guilin and then on to Sanjiang. The line enters Guizhou at Congjiang near the southeast tip of the province and passes Rongjiang, Sandu, Duyun, and Longli on to Guiyang in the center of the province.

This line traverses 270 tunnels and 510 valleys across the karst landscape.[2] Bridges and tunnels account for 83% of the line's total length, including 92% in Guizhou Province.[2] A total of 238 tunnels, totaling 464 km, were built along route including nine tunnels over 10 km in length.[1] The longest tunnel, through the Yan Mountain in Rongjiang, is 14.693 km.[1]

References