Goonyella Line, Queensland |
---|
|
QR electric loco 3136 (in Bicentennial paint scheme) on the Goonyella line |
Overview |
---|
Type |
Heavy Rail (Coal Freight) |
---|
Locale |
Queensland, Australia |
---|
Termini |
Hay Point North Goonyella Mine |
---|
Website |
http://www.aurizon.com.au/ |
---|
Operation |
---|
Opening |
1971 |
---|
Owner |
Aurizon |
---|
Operator(s) |
Aurizon |
---|
Depot(s) |
Jilalan |
---|
Technical |
---|
Line length |
477 km (296 mi) |
---|
Track gauge |
3 ft 6 in (1,067 mm) |
---|
Electrification |
25 kV 50 Hz AC OHLE |
---|
Operating speed |
100 km/h (62 mph)[1] |
---|
Route map |
Goonyella Line |
Legend
|
|
144 |
Coppabella |
|
0 |
Oaky Creek branch |
|
2 |
Peak Downs Hwy |
|
8 |
Moorvale |
|
16 |
Millenium |
|
46 |
Peak Downs 248m |
|
47 |
Peak Downs |
|
68 |
Saraji Mine |
|
|
Lake Vermont |
|
89 |
Dysart |
|
111 |
Norwich Park Mine |
|
134 |
German Creek Mine |
|
152 |
Oaky Creek Mine |
|
|
to Gregory and Central West System |
|
|
|
|
157 |
Broadlea |
|
160 |
Carborough Downs |
|
168 |
Burton Coal |
|
169 |
Mallawa |
|
170 |
Isaac Plains |
|
|
174 |
Wotonga |
|
0 |
Blair Athol branch |
|
7 |
Isaac River |
|
18 |
Moranbah |
|
39 |
Villafranca |
|
60 |
Mt McLaren |
|
86 |
Blackridge 359m |
|
103 |
to Clermont and Central West System |
|
108 |
Blair Athol Mine |
|
|
|
|
|
191 |
Isaac River |
|
192 |
Moranbah North |
|
198 |
Goonyella Mine |
|
203 |
Riverside Mine |
|
212 |
Future Newlands - Goonyella Link |
|
214 |
North Goonyella 310m |
|
|
Distance in km. Distance shown from beginning of branch line. |
|
|
The Goonyella railway system is located in Central Queensland, Australia. It services the coal mining area of the Bowen Basin, carrying coal to the Hay Point and Dalrymple Bay Coal Terminals 20 km southeast of Mackay, as well as products to other destinations by way of connections to the North Coast Line at Yukan and the Central Line at Burngrove via the Gregory coal mine branch. It is also connected to the coal loading terminal at Abbot Point (20 km northwest of Bowen) by the GAP line.
The Goonyella system is narrow gauge 3 ft 6 in (1,067 mm) and electrified using 25 kV 50 Hz. The line has been duplicated from Hay Point to Wotonga (174km) and features CTC signalling over the entire system.
Mines
The Goonyella Coal Chain services 24 mines, carrying coal from BHP Billiton Mitsubishi Alliance, Anglo Coal, Macarthur Coal, Peabody Energy Australia, Xstrata and ANCI. The system currently operates under a demand-pull model, with rail haulages being designated by the ports, and the shipping stem.
[2]
The rail line transports coal from Gregory Mine, Oaky Creek coal mine, German Creek coal mine, Foxleigh coal mine, Norwich Park coal mine, Lake Vermont Mine, Saraji coal mine, Peak Downs Mine, Millennium Mine, Poitrel Mine, Moorvale Mine, Burton Downs Mine, Carborough Downs Mine, Issac Plains Mine, Moranbah North coal mine, Goonyella Riverside Mine, Hail Creek coal mine, Clermont Mine, Riverside Mine, North Goonyella coal mine, South Walker Creek coal mine, and Blair Athol coal mine.
QR loco 1740 hauls a special train through a coal loading facility, Goonyella line
See also
References
External links
|
---|
| | | | | Proposed or under construction |
---|
| |
| | Tourist & heritage railways |
---|
| |
|
|
|
---|
| By state | | |
---|
| By capital | |
---|
| Stations | |
---|
| Related articles | |
---|
|