Glanford Brigg Power Station

Not to be confused with Glanford Power Station.
Glanford Brigg Power Station

Glanford Brigg Power Station
Viewed from the east in November 2009
Location of Glanford Brigg Power Station in Lincolnshire
Country England, United Kingdom
Location North Lincolnshire, Yorkshire and the Humber
Coordinates 53°32′26″N 0°30′13″W / 53.540577°N 0.503635°WCoordinates: 53°32′26″N 0°30′13″W / 53.540577°N 0.503635°W
Status Operational
Construction began 1991
Commission date 1993
Operator(s) Fortum
(1993–2002)
Centrica Brigg
(2002–present)
Thermal power station
Primary fuel Natural gas
Secondary fuel Diesel fuel
Combined cycle? yes
Power generation
Units operational 6 x 40 MW
Make and model General Electric
Alstom
Nameplate capacity 240 MW
grid reference SE991059

Glanford Brigg Power Station (also known as Brigg Power Station) is a gas-fired power station in North Lincolnshire, England. It is capable of firing diesel as a substitute of natural gas. It is situated on the River Ancholme, beside the Sheffield to Lincoln Line, outside the town of Brigg, with its name coming from the former name for the town. It has a generating capacity of 240 megawatts (MW).

Opened in 1993, the station was originally operated by Finnish company Fortum, but is now operated by Centrica. There are currently plans to build a straw fuelled renewable energy plant alongside the station.

History

Construction of the power station started in late 1991 and it was opened in December 1993. It was built just south of a former British Sugar sugar beet factory, which is the planned location of Brigg Renewable Energy Plant,[1] by European Gas Turbines (EGT), which was a division of GEC Alsthom. GEC Alsthom won the £90m contract in March 1991. Initially, it was owned by Yorkshire Electricity, but operated by a Finnish company, Fortum, under the name Regional Power Generators Ltd. RPG was joint venture between Yorkshire Electricity and Newcastle upon Tyne-based Berisford Bristar, of which YE took 75% control in January 1991, with Total Gas Marketing owning the rest. The gas was supplied by British Gas. In 2000 it was bought by Fortum. In July 2002 the plant was bought by Centrica for £37 million, with the operating company known as Centrica Brigg Ltd.

Operations

Glanford Brigg power station is a natural gas fuelled, combined cycle gas turbine power station with four gas turbines, four Stein Industrie heat recovery steam generators (HRSGs), and two 40 MW GEC Alsthom steam turbines, divided into two modules. It can produce 240 MW of base load electricity and 272 MW at peak load, from a thermal input of around 515 MW. In the event of interruption of main fuel supply, it can burn diesel instead. It can run at a maximum thermal efficiency of 46.8% when on constant running; the actual efficiency depends on factors in the local weather conditions such as temperature and humidity. It is used to fulfill peak load requirements from the National Grid, as the electricity output can be decreased when demand is less. Each gas turbine and both steam turbines are connected to a 40 MW electrical generator (alternator).

Its position next to the River Ancholme

The station's four flue gas stacks are 70 m (230 ft) high. The gas turbines are a General Electric Frame 6 MS6001B type, producing 39.16 MW at 31.6% thermal efficiency. They rotate at 5135 revolutions per minute (rpm), and are connected via a gearbox to the electrical generator revolving at 3000 rpm. Exhaust gas reaches the steam generator at 541 °C. The gas turbine electrical generators are rated at 50.2 MVA, with a terminal voltage of 11 kilovolts (kV). The electricity enters the National Grid via a transformer at 132 kV.

The station falls within the supply area formerly ran by Yorkshire Electricity, with distribution currently run by CE Electric UK. The site employs thirty six people.

References

External links