Evka 3 (İzmir Metro)

Evka 3
Coordinates 38°27′54″N 27°13′42″E / 38.46500°N 27.22833°ECoordinates: 38°27′54″N 27°13′42″E / 38.46500°N 27.22833°E
Owned by İzmir Metro
Line(s) Üçyol-Bornova
Platforms 2 side platforms
Tracks 2
Construction
Structure type Underground
Disabled access Yes
History
Opened 30 March 2012
Electrified 750V DC Third Rail

Evka 3 is a station on the currently operating line of the Izmir Metro system. Opened on 30 March 2012 it is the current eastern terminus of the line. It is located between Istanbul Avenue and Genghis Khan Street and offers connections to ESHOT city buses via a small bus hub adjacent to the station. An extension into Bornova's center is planned and construction is expected to begin in 2015.