Emory S. Land-class submarine tender
USS Emory S. Land approaches USS La Salle while in Italy. | |
Class overview | |
---|---|
Builders: | Lockheed Shipbuilding and Construction Company, Seattle, Washington |
Operators: | United States Navy |
Preceded by: | L. Y. Spear-class |
Built: | 1976–1979 |
In commission: | 1979– |
Completed: | 3 |
Active: | 2 |
Laid up: | 1 |
General characteristics | |
Type: | Submarine tender |
Tonnage: | 9,000 LT tons deadweight (DWT) |
Displacement: | 13,800 long tons (14,021 t) light 23,000 long tons (23,369 t) full load |
Length: | 649 ft (198 m) |
Beam: | 85 ft (26 m) |
Draft: | 26–29 ft (7.9–8.8 m) |
Propulsion: | 2 × boilers Steam turbine 1 shaft 20,000 shp (14,914 kW) |
Speed: | 18 knots (33 km/h; 21 mph) |
Complement: | 1,350 |
Armament: | 2 × 40 mm AA guns 4 × 20 mm AA guns |
The Emory S. Land class submarine tender is a class of three submarine tenders in the United States Navy. USS Emory S. Land (AS-39) is the lead ship in the class, the others are USS Frank Cable (AS-40) and USS McKee (AS-41).
|