Dubai International Airport

"DXB" redirects here. For the New Zealand locomotive operated by KiwiRail, see New Zealand DX class locomotive.
Dubai International Airport
مطار دبي الدولي
IATA: DXBICAO: OMDB
WMO: 41194
Summary
Airport type Public
Owner Government of Dubai
Operator Dubai Airports Company
Serves Dubai, United Arab Emirates
Location Al Garhoud
Hub for
Time zone UAE Standard Time (UTC+04:00)
Elevation AMSL 62 ft / 19 m
Coordinates 25°15′10″N 055°21′52″E / 25.25278°N 55.36444°ECoordinates: 25°15′10″N 055°21′52″E / 25.25278°N 55.36444°E
Website www.dubaiairport.com
Map
OMDB

Location in the UAE

Runways
Direction Length Surface
m ft
12L/30R 4,000 13,123 Asphalt
12R/30L 4,450 14,600 Asphalt
Statistics (2014)
Passengers 71,675,636
Aircraft movements 405,750
Cargo (metric tonnes) 2,367,574
Economic impact $26.7 billion[1]
Sources: UAE AIP,[2] ACI[3]

Dubai International Airport (IATA: DXB, ICAO: OMDB) (Arabic: مطار دبي الدولي) is the primary airport serving Dubai, United Arab Emirates, and is the world's busiest airport by international passenger traffic.[4] It is also the 6th busiest airport in the world by passenger traffic,[5] the 6th busiest cargo airport in world,[6] and the busiest hub for the Airbus A380.[7] In 2014, DXB handled 71.6 million passengers, 2.37 million tonnes of cargo, and registered 405,750 aircraft movements.[8]

Dubai International is situated in the Al Garhoud district, 2.5 nautical miles (4.6 km; 2.9 mi) east[2] of Dubai, and spread over an area of 2,900 hectares (7,200 acres) of land.[9] The airport is operated by the Dubai Airports Company and is the home base of Dubai's international airlines, Emirates, FlyDubai and Emirates SkyCargo; the Emirates hub is the largest airline hub in the Middle East; Emirates now handles 64 per cent of all passenger traffic, and accounts for about 50 per cent of all aircraft movements at the airport.[10] Dubai Airport is also the base for low-cost carrier, flydubai which handles 10.7 per cent of passenger traffic at DXB.[11] The airport consists of three terminals and has a total capacity of 75 million passengers annually. Terminal 3 is the second largest building in the world by floor space and the largest airport terminal in the world.[12] As of January 2015, there are over 8,000 weekly flights operated by 140 airlines to over 270 destinations across every continent except Antarctica.[13]

Dubai International is an important contributor to the Dubai economy, employing approximately 90,000 people, indirectly supports over 400,000 jobs and contributes over US$26.7 billion to the economy, which represents around 27 per cent of Dubai’s GDP and 21 percent of the employment in Dubai.[14] It is predicted that by 2020, the economic contribution of Dubai’s aviation sector will rise to 37.5 per cent of the city's GDP, and by 2030, the economic impact of aviation is projected to grow to $88.1 billion and support 1.95 million jobs in Dubai or 44.7% of the GDP and 35.1% of the total employment.[1][15]

History

The history of civil aviation in Dubai started in July 1937 when an air agreement was signed for a flying boat base for the aircraft of Imperial Airways with rental of the base at about 440 Rupees per month – this included the guards' wages. The Empire Flying Boats also started operating once a week flying east to Karachi and west to Southampton, England. By February 1938, there were four flying boats a week.

In the 1940s flying from Dubai was by flying boats operated by British Overseas Airways Corporation (BOAC), operating the Horseshoe line from Southern Africa via the Persian Gulf to Sydney.[16]

Construction

Dubai Airport fire station and terminal/control tower seen from the landside, early 1965.
The first jet aircraft to land on the new runway at Dubai Airport in 1965 was a Comet from Middle East Airlines.

Construction of the airport was ordered by the ruler of Dubai, Sheikh Rashid bin Saeed Al Maktoum, in 1959. It officially opened in 1960 with its first airfield, at which time it was able to handle aircraft the size of a Douglas DC-3 on a 1,800 m (5,906 ft) long runway made of compacted sand. Three turning-areas, an apron and small terminal completed the airport that was constructed by Costain.[17]

In May 1963 construction of a 9,200 ft (2,804 m) asphalt runway started. This new runway, alongside the original sand runway and taxiway opened in May 1965, together with several new extensions were added to the Terminal Building, hangars erected, Airport and Navigational aids were installed. The installation of the lighting system continued after official opening and was completed in August of that year. During the second half of the 1960s several extensions, equipment upgrades like a VHF omnidirectional range (VOR) and an instrument landing system (ILS) as well as new buildings were constructed. By 1969, the airport was served by 9 airlines serving some 20 destinations.[18]

Operations and statistics
Passenger movements
2001 13,508,073 2008 37,441,440
2002 15,973,391 2009 40,901,752
2003 18,062,344 2010 47,180,628
2004 21,711,883 2011 50,977,960
2005 23,607,507 2012 57,684,550
2006 28,788,72 2013 66,431,533
2007 34,340,000 2014 70,475,636
Airfreight movements in tonnes
2001 610,867 2008 1,824,991
2002 764,193 2009 1,927,520
2003 928,758 2010 2 270 498
2004 1,111,647 2011 2,199,750
2005 1,333,014 2012 2,279,6240
2006 1,410,963 2013 2,435,567
2007 1,668,505 2014 2,367,574
Aircraft movements
2001 141,281 2008 N/A
2002 134,165 2009 N/A
2003 148,334 2010 292,662
2004 168,511 2011 326,317
2005 195,820 2012 344,245
2006 217,1652 2013 369,953
2007 260,530 2014 357,339
Capacity
Passenger (current) 70,500,000
Passenger (ultimate) 75,000,000
Cargo (current) 2.3m tonnes
Cargo (ultimate) 2.5m tonnes
Apron (current) 189
Number of destinations
International (air) 270
Number of airlines
International 140+

The inauguration was on 15 May 1966 and was marked by the visits of the first big jets of Middle East Airlines and Kuwait Airways Comets.[19]

The advent of wide body aircraft a need for further airport development in the 1970s which had already been foreseen by the Ruler of Dubai and plans for a new Terminal, runways and taxiways capable of coping with international flights. The construction of a new terminal building consisting of a three-storey building 110 m (360 ft) long and included an enclosed floor area of 13,400 m2 (144,000 sq ft). A new 28 m (92 ft) control tower was also constructed.[20]

Expansion continued in the early 1970s including ILS Category II equipment, lengthening existing runway to 12,500 ft (3,810 m), installation of a non-directional beacon (NDB), diesel generators, taxiways, etc. This work made handling the Boeing 747 and Concorde possible. Several runway and apron extensions were carried out through the decade to meet growing demand.[21]

1971 saw the new precision category 2 Approach and Runway Lighting System being commissioned. The construction of the Airport Fire Station and the installation of the generators were completed in December of that year and was fully operational in March 1972. The ruler also commissioned and inaugurated the Long-range Surveillance System on 19 June 1973.[22]

With the expansion of the Airport Fire Services it was necessary to find more suitable accommodation and a hangar style building was made available to them at the end of 1976. This was located midway between the runway ends to facilitate efficient operations. A new building was also constructed to house the Airport Maintenance Engineer, Electronics Engineering section and Stores unit.

Expansion of the Airport Restaurant and Transit Lounge including the refurbishing of the upper level and the provision of a new kitchen was completed in December 1978.[23]

The next phase of development was the second runway, which was completed three months ahead of schedule and opened in April 1984. This runway, located 360 m (1,180 ft) north of the existing runway and parallel to it and is equipped with the latest meteorological, airfield lighting and instrument landing systems to give the airport a Category II classification.

Also several extensions and upgrades of terminal facilities and supporting systems were carried out. On 23 December 1980 the airport became an ordinary member of the Airports Council International (ACI).[24]

During the 1980s, Dubai was a stopping point for airlines such as Air India, Cathay Pacific, Singapore Airlines, Malaysia Airlines and others travelling between Asia and Europe that needed a refuelling point in the Persian Gulf. This use was made redundant with the availability of Russian airspace due to the breakup of the Soviet Union and the advent of longer-range aircraft introduced in the late 1980s and early 1990s such as the Airbus A340, the Boeing 747-400 and the Boeing 777 series aircraft, which had the range to fly between Europe and Southeast Asia nonstop.[25]

Expansion

Azerbaijan Airlines Boeing 707-300 parked at a remote stand in DXB (1995).

The opening of Terminal 2 in 1998 saw the first step of phase 1 of the new development master plan launched in 1997. As the second stage, Concourse 1 opened in April 2000 under the name of Sheikh Rashid Terminal. The concourse is 0.8 km (0.50 mi) in length and connects to the check-in area by a 0.3 km (0.19 mi) underground tunnel containing moving walkways (conveyor belt/travelators). It also contains a hotel, business centre, health club, exchanges, dining and entertainment facilities, internet services, medical centre, post office, prayer room. The next step was the reconfiguration of the runway system, already part of phase 2, and aprons and taxiways were expanded and strengthened in 2003–2004. In addition, the Dubai Flower Centre opened in 2005 as part of the development. The airport saw the need for this as the city is a hub for import and export of flowers and the airport required a specialist facility since flowers need special conditions.[26][27]

Construction of Terminal 3 began in 2004 as the next stage of phase 2 of the development, with an estimated cost of around $4.55 billion. Completion was originally planned for 2006, but was delayed by two years.[28]

On 30 May 2008, a topping out ceremony was conducted. The terminal became operational on 14 October 2008, with Emirates Airline (EK2926) from Jeddah, Saudi Arabia, being the first flight to arrive at the new terminal, and EK843 to Doha, Qatar being the first departing flight. The terminal increased the airport's maximum passenger capacity annually by 47 million, bringing the total annual capacity up to 75 million passengers.[29]

On 29 October 2010, the airport marked its 50th anniversary. The airport has seen over 402 million passengers at an average annual growth rate of 15.5 per cent, and handled over 3.87 million aircraft at an average annual growth rate of 12.4 per cent.[30]

With the arrival of the Airbus A380, the airport made modifications costing $230 million. These included the building of 29 gates capable of handling the large aircraft, five of which are in Terminal 3, and two in Terminal 1. Other important projects at the airport include the next stage of the phase 2 development, which includes the construction of Concourse 3. This will be a smaller version of Concourse 2, which is connected to Terminal 3.

Also as part of the expansion, the airport is now able to handle at least 75 million (an increase of 19 million) passengers per annum with the opening of Concourse 3, which is part of Terminal 3. However, recent communications predict a further increase to 80 million passengers with additional reassessments of existing capacities. In 2009, Terminal 2 expanded its facilities to handle 5 million (an increase of 2 million) passengers annually, taking the airport's total capacity to 62 million passengers. The Department of Civil Aviation has said that Terminal 2 will continuously be upgraded and expanded to bring the total capacity of the airport from the initial 75 million passengers to 80 million passenger capacity by 2012.[31]

The Cargo Mega Terminal, which will have the capacity to handle 3 million tonnes of cargo a year, is a major development; it is going to be built in the long term. Completion of the Mega terminal is expected to be no later than 2018. Terminal 2 will be completely redeveloped to match the status of the other two terminals. With all of these projects completed by 2013, the airport expects to be able of handling at least 75–80 million passengers and over 5 million tonnes of cargo.[32]

Aircraft parked at concourse C. Concourse C has a capacity of 33 million passengers

The airport's landside facilities were modified to allow construction of two stations for the Red Line of Dubai Metro. One station was built at Terminal 1 and the other at Terminal 3; both are in operation. The line was launched on 9 September 2009, and opened in phases over the next year.[33] The second Metro line, the Green Line, runs near the Airport Free Zone, and has served the airport's north-eastern area with the Terminal 2 from September 2011.[34]

The proposed 52 km (32 mi) Purple Line will link Dubai International Airport and Al Maktoum International Airport, which is currently being built at Jebel Ali.[35]

With phase 2 of DXB's expansion plan complete, the airport now has three terminals and three concourses, two cargo mega terminals, an airport free zone, an expo centre with three large exhibition halls, a major aircraft maintenance hub and a flower centre to handle perishable goods.[31] A phase 3 which has been included in the master-plan involves the construction of a new Concourse 4.

The airport revealed its future plans in May 2011, which involve construction of a new Concourse D for all airlines currently operating from concourse C. Concourse D is expected to bring the total capacity of the airport to over 90 million passengers, and will be operating by 2016. The plan also involves Emirates solely operating from Concourse C along with Concourse A and B which it is already operating.[36]

In September 2012, Dubai Airports changed the names of concourses to make it easier for passengers to navigate the airport. Concourse 1, in which over 100 international airlines operate, became Concourse C. Concourse 2 became Concourse B and Concourse 3 became Concourse A. The gates in Terminal 2 have changed and are numbered F1 to F6. The remaining alpha-numeric sequences are being reserved for future airport facilities that are part of the Dubai Airports' $7.8 billion expansion programme, including Concourse D.[37]

Dubai's government has announced the construction of a new airport in Jebel Ali, named Dubai World Central - Al Maktoum International Airport. It is expected to be the second largest airport in the world by physical size, though not by passenger metrics. It opened 27 June 2010,[52] however construction is not expected to finish until 2017. The airport is expected to be able to accommodate up to 160 million passengers.[53] There has been an official plan to build the Dubai Metro Purple Line to connect Al Maktoum International Airport to Dubai International Airport; construction is set to begin in 2012. There have been rumours that the Purple Line is on hold, or even cancelled.[54]

Growth in traffic at Dubai International Airport[55][56]
Airlines1990199419982002200620102014
Passenger movements4.347 million 6.299 million 9.732 million15.973 million28.788 million47.181 million70.476 million
Airfreight movements (tonnes)144,282 243,092 431,777 764,193 1.410 million 2.19 million2.37 million
City links3654110170195210270
Weekly scheduled flightsN/AN/A2,3502,8504,5506,1008,000
AirlinesN/AN/A80102113135140

Air traffic

Main airlines based at DXB

Emirates operations at Dubai International

Recreational flying to Dubai is catered for by the Dubai Aviation Club, which undertakes flying training for private pilots and provides facilities for private owners.[61]

The Government of Dubai provides short and long range search and rescue services, police support, medical evacuation and general purpose flights for the airport and all VIP flights to the airport.[62]

Infrastructure

Infrastructure[63][64]
Taxiways
Length 25,300 m (83,000 ft)
Width 30 m (98 ft)
Passenger terminal buildings
Total
Floor area 1,972,474 m2 (21,231,530 sq ft)
Handling capacity c. 75 million passengers[65]
Parking bays 73 (aerobridge)
146 (remote)
Terminal One + (Concourse C)[66]
Opened 1 April 2000 (operational)
Floor area 246,474 m2 (2,653,020 sq ft)
Handling capacity 22 million passengers
Parking bays 27 (aerobridge)
48 (remote)
Concourse D[67]
Opened 2015
Floor area 150,000 m2 (1,600,000 sq ft)
Handling capacity 18 million
Parking bays 16 (aerobridge)
Terminal Two[68]
Opened May 1 1998 (operational)
Floor area 13,000 m2 (140,000 sq ft)
Handling capacity 10 million passengers
Parking bays 43 (remote)
Terminal Three + (Concourse A and B)[69]
Opened 14 October 2008 (operational)
Floor area 1,713,000 m2 (18,440,000 sq ft): Terminal 3 (515000m2) + Concourse A (528000m2) + Concourse B (670000m2)
Handling capacity 43 million passengers: Concourse A (19 million) + Concourse B (24 million)
Parking bays 46 (aerobridge)
27 (remote)
VIP Pavilion
Opened January 2005 (operational)
Floor area N/A
Handling capacity N/A
Parking bays 8 (remote)
Aircraft parked at remote stands at DXB

Dubai International Airport was conceptualised to function as Dubai's primary airport and the region's busiest for the foreseeable future without the need for relocation or the building of another airport when passenger figures increased. The area was chosen near to Dubai, to attract passengers from the city of Dubai, rather than travel to the busier Sharjah International Airport. The planned location originally was Jebel Ali.[70]

The original master plan for the existing airport initially involved a dual-terminal and one runway configuration over two phases with provisions for another two passenger terminals in the near future. Phase 1 included the construction for the first passenger terminal, the first runway, 70 aircraft parking bays, support facilities and structures, including a large maintenance hangar, the first fire station, workshops and administrative offices, an airfreight complex, two cargo agents' buildings, in-flight catering kitchens and a 87 m (285 ft) control tower. Construction for the second phase would commence immediately after the completion of Phase 1 and include the second runway, 50 new aircraft parking bays in addition to the existing 70 bays, a second fire station and a third cargo agent building.[71]

The third phase included construction of a new terminal (now the parts of Terminal 1's main building and Concourse C) and an additional 60 parking bays, as well as new aircraft maintenance facility. Then, in the early 2000s a new master plan was introduced which began the development of the current concourses and terminal infrastructure.[72]

Paul Griffiths(Dubai Airports’ CEO) in his interview with Vision (Magazine), cited plans to build infrastructure to support the expansion of Emirates and budget airline Flydubai, and ascend the ranks of global aviation hubs.[73]

Airport traffic control tower

The airport traffic control tower (ATCT) is an 87 m (285 ft) control tower was constructed as part of phase two of the then-development plan.[74]

Terminals

Dubai International Airport has four terminals. Terminal 1 has one concourse, Terminal 2 is set apart from the other two main buildings and Terminal 3 is divided into Concourse A and B. The cargo terminal is capable of handling 3 million tonnes of cargo annually and a general aviation terminal (GAT) is close by.[75] In 2015, a fourth concourse will open (Concourse D) and will see all airlines currently operating from concourse C shift operations there. Thus, concourse A, B, and C will become part of Terminal 3 and concourse D will be part of Terminal 1.

A aerial view of concourse B and C. Concourse A (not shown) is connected to Terminal 3 via an Automated People Mover. Concourse D will also be connected to Terminal 1 via an APM when complete in 2015.
Aircraft parked at Concourse C before most of Emirates' operations moved to Concourse B. Emirates will take over operations of concourse C in 2015 once all airlines currently operating from concourse C move to concourse D.
Interior of Concourse C. In 2013 Dubai Airports announced a renovation program of concourse C and Terminal 1 expected to be completed in 2015.

Passenger terminals

Dubai Airport has three passenger terminals. Terminals 1 and 3 are directly connected with a common transit area, with airside passengers being able to move freely between the terminals without going through immigration, while Terminal 2 is on the opposite side of the airport. For transiting passengers, a shuttle service runs between the terminals, with a journey time of around 20 minutes from Terminal 2 to Terminal 1, and 30 minutes to Terminal 3.[76] Passengers in Terminal 3 who need to transfer between concourse A and the rest of the Terminal have to travel via an Automated People Mover. In 2015 when concourse D is complete, passengers will be required to use another Automated People Mover to connect to concourse D from Terminal 1.[77]

Situated beside Terminal 2 is the Executive Flights Terminal, which has its own check-in facilities for premium passengers and where transportation to aircraft in any of the other terminals is by personal buggy.[78]

The three passenger terminals have a total handling capacity of around 80 million passengers a year.[79]

Terminals 1 and 3 cater to international passengers, whilst Terminal 2 is for budget passengers and passengers flying to the Sub-Continent and Persian Gulf region; Terminals 1 and 3 handle 85 per cent of the passenger traffic; and the Executive Flights terminal are for the higher end travellers and important guests.

Terminal 1

Terminal 1 has a capacity of 22 million passengers. It is used by over a 100 airlines and is connected to Concourse C, the so-called, 1 km (0.62 mi) long Sheikh Rashid Terminal by an underground, 300 m (980 ft) long tunnel. It is spread over an area of 520,000 m2 (5,600,000 sq ft) and offers 221 check in counters.[80]

The Terminal was originally built to handle 18 million passengers, however with extreme congestion at the terminal, the airport was forced to expand the terminal to accommodate with the opening of 28 remote gates. Over the years, more mobile gates were added to the airport bringing the total as of 2010 to 28.

In 2013, Dubai Airports announced a major renovation for Terminal 1 and concourse C. The renovations include upgraded baggage systems, replacement of check-in desks, and a more spacious departure hall. Arrivals will also see improvements to help reduce waiting times. The renovation is expected to be completed by the middle of 2015.[81]

Concourse C

Concourse C, part of Terminal 1, was opened in 2000 and used to be the largest concourse at Dubai International Airport before Concourse B in Terminal 3 opened. It incorporates 50 gates, including 28 air bridges and 22 remote gates located at a lower level of the terminal. The gates are labelled C1 – C50.[37]

The concourse includes over 17 food and beverage cafes and restaurants, with the food court being located on the Departures Level. Also located in the concourse is a 5 star hotel, and a 5,400 m2 (58,000 sq ft) duty-free shopping facility. Other facilities include prayer rooms, and a medical centre.[82] Emirates continues to maintain a presence in Concourse C, operating 12 gates there as well as the Emirates first Class and Business Class Lounges at the Terminal.[83] Other airline lounges include the Gulf Air, British Airways, KLM and the Star Alliance have their own dedicated lounges.

Concourse C will become part of Terminal 3 in 2015 after concourse D opens.

Concourse D

Planning begun for further expansion of Dubai Airport, with the construction of Terminal 4, it was revealed on the day Emirates completed its phased operations at the new Terminal 3, on 14 November 2008.[84] According to Dubai Airport officials, plans for Terminal 4 had begun and extensions would be made to Terminal 3. These are required to bring the capacity of the airport to 80–90 million passengers a year by 2015.[85]

In May 2011, Paul Griffiths, chief executive of Dubai Airports revealed the Dubai Airport masterplan. It involves the construction of a Concourse D (previously Terminal 4). With a capacity of 15 million, it would bring the total capacity of the airport to 90 million passengers by 2018 – an increase of 15 million. It also will see Emirates take over the operation at Concourse C, along with concourse A and B which it will already be operating. All remaining airlines will shift to Concourse D, or move to Al Maktoum International Airport. The airport projects that international passenger and cargo traffic will increase at an average annual growth rate of 7.2 per cent and 6.7 per cent respectively and that by 2020 passenger numbers at Dubai International Airport will reach 98.5 million and cargo volumes will top 4.1 million tonnes.[86]

Concourse D will have a capacity of 15 million passengers, include 17 gates and will be connected to Terminal 1 via an automated people mover.[87] The concourse is expected to open at the end of the second quarter of 2015.[88]

Terminal 2

FlyDubai aircraft parked at Terminal 2 aircraft stands

Terminal 2 built in 1998 has an area of 47,000 m2 (510,000 sq ft) and has a capacity of 10 million as of 2013, after several, decent reconstructions and a major expansion in 2012 which saw capacity double. It is used by over 50 airlines, mainly operating in the Persian Gulf region. Most flights operate to Pakistan, Saudi Arabia, Iran, India and Afghanistan.

In June 2009, Terminal 2 became the hub of Air India Express & Flydubai,[89] and the terminal houses the airline's corporate head office.[90]

Terminal 2 has undergone a major refurbishment recently, extending check-in and boarding facilities, changing the interior and exterior décor and offering more dining choices to passengers. Capacity was increased to allow for 10 million passengers, an increase of 5 million.[91]

The terminal has now increased the number of facilities available to passengers. Check-in counters have increased to 37.The boarding area is more spacious, with more natural light. Also the new open boarding gates allow several flights to board simultaneously, improving passenger and aircraft movements. There are a total of 43 remote stands at the terminal. However passengers cannot move between Terminal 2 to 1 or from 2 to 3 and vice verse inside the airport. They have to make use of Taxi service or public transport facility available in plenty outside. Passengers can also make use of Buses outside the Terminal-1 to reach the nearest Metro Station from where you can travel to any other place as it being a cost effective solution. But be sure to have nol-Card (prepaid) before boarding any public transport in Dubai, incidentally they will not sell this card any where near the Airport.

The Dubai duty-free shopping area covers 2,400 m2 (26,000 sq ft) in departures and 540 m2 (5,800 sq ft) in arrivals. The 3,600 m2 (39,000 sq ft) extension included a larger arrivals hall as well.

Terminal 3

The Departures area of Terminal 3, with the arrivals area located underground. The metro station and lines can be also be seen
The baggage claim area in Terminal 3

The partly underground Terminal 3 was built at a cost of US$8 billion, exclusively for Emirates and has a capacity of 47 million passengers. The terminal has 5 Airbus A380 gates at Concourse B, and 20 at Concourse A.[92] It was announced on 6 September 2012 that Terminal 3 would no longer be Emirates exclusive, as Emirates and Qantas had set up an extensive code sharing agreement. Qantas would be the second and only one of two airlines to fly in and out of Terminal 3. This deal also allows Qantas to use the A380 dedicated concourse.[93]

Upon completion, Terminal 3 was the largest building in the world by floor space, with over 1,713,000 m2 (18,440,000 sq ft) of space, capable of handling 60 million passengers in a year. A large part is located under the taxiway area and is directly connected to Concourse B: the departure and arrival halls in the new structure are 10 m (33 ft) beneath the airport's apron. Concourse A is connected to the terminal via an APM.[94] It has been operational since 14 October 2008, and opened in four phases to avoid collapse of baggage handling and other IT systems.[95]

The building includes a multi level underground structure, first and business class lounges, restaurants, 180 check-in counters and 2,600 car-parking spaces. The terminal offers more than double the previous retail area of concourse C, by adding about 4,800 m2 (52,000 sq ft) and Concourse B's 10,700 m2 (115,000 sq ft) of shopping facilities.[96]

In arrivals, the terminal contains 72 immigration counters, and 14 baggage carousels.[97][98] The baggage handling system – the largest system and also the deepest in the world – has a capacity to handle 8,000 bags per hour. The system includes 21 screening injection points, 49 make-up carousels, 90 km (56 mi) of conveyor belts capable of handling 15,000 items per hour at a speed of 27 km/h (17 mph), and 4,500 early baggage storage positions.[99] The car park includes 1,870 car spaces, 168 car rental spaces, and 45 Emirates bus spaces.[100]

Concourse A

Concourse A part of Terminal 3 has a capacity of 19 million passengers and is connected to the two major public levels of Terminal 3 via an automated people mover (APM) in addition to the vehicular and baggage handling system utility tunnels for further transfer. The concourse opened on 2 January 2013 and was built at a cost of US$3.3 billion.[101] The building, which follows the characteristic shape of Concourse B, 924 m (3,031 ft) long, 91 m (299 ft) wide and 40 m (130 ft) high in the centre from the apron level, and accommodates 20 air bridge gates, of which all are capable of handling the Airbus A380-800.[102][103] There are also 6 remote lounges for passengers departing on flights parked at 13 remote stands. The gates in concourse A are labelled A1- A24.[37][104]

The concourse includes one 4 star hotel and one 5 star hotel, first and business class lounges, and duty-free areas. The total built-up area is 540,000 m2 (5,800,000 sq ft).[105] The concourse allows for multi-level boarding and boasts the largest first and business class lounges in the world. Each lounge has its own dedicated floor offering direct aircraft access from the lounges.[106] The total amount of retail space at the concourse is 11,000 m2 (120,000 sq ft), and there is also a total of 14 cafe's and restaurants.

  1. ^ http://www.dubaiairport.com/en/media-centre/facts-figures/Pages/factsheets-reports-statistics.aspx?id=10
Concourse B

Concourse B is directly connected to terminal 3, and is dedicated exclusively to Emirates. The total built up area of the concourse itself is 675,000 m2 (7,270,000 sq ft). The concourse is 945 m (3,100 ft) long, 90.8 m (298 ft) wide (at midpoint) and 49.5 m (162 ft) high. The terminal has 10 floors (4 basements, a ground floor, and 5 above floors). The building currently includes a multi-level structure for departures and arrivals and includes 32 gates, labelled B1- B32.[37] The concourse has 26 air bridge gates and 5 boarding lounges for 14 remote stands that are for the Airbus A340 and Boeing 777 aircraft only. For transit passengers the concourse has 3 transfer areas, and 62 transfer desks.[107]

The concourse also includes the Emirates first and Business class lounges and the Marhaba lounge. The First class lounge has a capacity of 1,800 passengers and a total area of 12,600 m2 (136,000 sq ft). The Business class lounge has a capacity of 3,000 passengers, and a total area of 13,500 m2 (145,000 sq ft). The Marhaba lounge, the smallest lounge at the concourse has a capacity of 300 passengers at a time.[108]

The total retail area at the concourse is 120,000 m2 (1,300,000 sq ft) completely operated by Dubai Duty Free, and the food court includes 18 restaurants.[109] There are also 3 hotels in the concourse; a 5 star hotel, and a 4 star hotel.[110]

There is a direct connection to Sheikh Rashid Terminal (Concourse C) located at the control tower structure through passenger walkways. There is also a 300-room hotel and health club including both five and four star rooms. Concourse B includes five aerobridges that are capable of handling the new Airbus A380.[111] Emirates Airline continues to maintain a presence in Concourse C, operating 12 gates at the concourse as well as the Emirates First Class and Business Class Lounges.[83]

Al Majalis VIP Pavilion and Dubai Executive Flight Terminal

Dubai Royal Air Wing is the main airline operating from the VIP Pavilion

The AL Majalis VIP pavilion, was exclusively built for the Dubai Royal Air Wing and opened on 1 July 2008. The entire facility is a 3,400 m2 (37,000 sq ft) terminal, and includes a Royal Majlis, and an antenna farm. It also includes eight aircraft hangars with a total built up area of 69,598 m2 (749,150 sq ft) and maintenance hangars for Boeing 747s and Airbus A380s and a 1,200 m2 (13,000 sq ft) gatehouse for VIP service.[45] In 2010 there were 47,213 customers, 13,162 movements, and in 2009 there were a total of 43,968 customers and 14,896 movements.[112]

Executive Flight Services (EFS) caters to those passengers of high class or special importance that travel through Dubai International Airports. It is the largest dedicated business aviation terminal of its kind in the Middle East. It is located at the Dubai Airport Free Zone close to Dubai International's Terminal 2. It only caters to private flights exclusive to the terminal. Airlines operating from the terminal are expected to maintain a lounge. In 2010 EFS handled 7,889 aircraft movements and 25,177 passengers.[113]

The centre itself is located close to Terminal 2, and includes a 5,500 m2 (59,000 sq ft) two-storey main building, a 3,700 m2 (40,000 sq ft) hangar, a 3,700 m2 (40,000 sq ft) ramp area for aircraft parking, and a special VIP car park for long term parking.[114] The centre also has its own immigration and customs sections, its own Dubai Duty Free outlet, a fully equipped business and conference centre, eight luxury private lounges and a limousine service between aircraft and the terminal.[115]

The ramp area of the terminal can accommodate up to 22 small sized private jets, between 8 and 12 medium-sized jets, or up to 4 large sized jets such as the Boeing Business Jet (BBJ), the Boeing 727 or the Airbus A319.[116]

The facility makes EFC the largest dedicated business aviation terminal in the Middle East.[78][117]

Cargo Mega Terminal

Qatar Airways Cargo Airbus A330-200F taking off from DXB, with a British Airways Boeing 777-200, Emirates Boeing 777-300ER and Emirates Boeing 777-200LR in the foreground
Aircraft stands at the Cargo Terminal

The cargo village at Dubai International Airport is one of the world's largest and most central cargo hubs, with most of the cargo for Asia and Africa coming through the facility. Forecasts in 2004 for cargo growth predicted that additional major cargo handling facilities were needed to satisfy demands. Plans were put in progress to construct the first stage of the cargo mega terminal, which by 2018 will have the ability to handle three million tons of freight.[118] Phase 1 of the cargo mega terminal was completed by 2004 and the next phase of expansion was scheduled for completion in late 2007. Presently the airport has a cargo capacity of 2.5 million tonnes, and will be expanded to handle 3 million.[119]

Flower centre

Dubai airport has constructed a flower centre to handle flower imports and exports, as Dubai is a major hub for the import and export of flowers and the airport required a specialist facility since these products need special conditions.[120] The flower centre's first phase was completed in 2004 at a cost of $50 million.[121]

The flower centre is not yet finished and construction will continue in another two phases. The centre will offer an enhanced level of automation over a five to seven-year period for processing flower products. It will begin with a semi-automated system with manual sorting before eventually becoming fully automated.[122]

The centre when completed and functioning will have a floor area of approximately 100,000 m2 including different export chambers and offices. The handling capacity of the centre is expected to be more than 300,000 tonnes of product throughput per annum. The entire facility (with the exception of the offices) will be maintained at an ambient temperature of just 2 to 4 °C (36 to 39 °F).[123]

Runways

Aircraft taxiing to runway 12L/30R

Dubai Airport has two runways, 12R/30L is 4,450 m × 60 m (14,600 ft × 200 ft), 12L/30R is 4,000 m × 60 m (13,120 ft × 200 ft). The runways are equipped with four sets of ILS to guide landing aircraft safely under very poor weather conditions. The runways were recently expanded to accommodate the Airbus A380.[124] In 2009, it was announced that the airport installed a Category III landing system, allowing planes to land in low visibility conditions, such as fog. This system will be the first of its kind in the United Arab Emirates.[125]

In 2013 Dubai Airports announced an 80-day runway refurbishment program which started on 1 May 2014 and was completed on 21 July 2014. The northern runway was resurfaced while lighting upgrades and additional taxiways were built on the southern runway to help boost its capacity. The southern runway was closed from 1 May to 31 May 2014, while the northern runway was closed from 31 May to 20 July 2014. Due to extra congestion on one runway, all freighter, charter and general aviation flights were diverted to Al Maktoum International Airport.[126][127] Flights at DXB were reduced by 26 percent and 14 airlines moved to Al Maktoum International Airport whilst the runways works were being done. Emirates cut 5000 flights and grounded over 20 aircraft during the period.[128]

Accommodating the Airbus A380

An Emirates Boeing 777-300 and Airbus A380 seen in the background

With Dubai-based Emirates being one of the launch customers for the Airbus A380 and also the largest customer, Dubai Airport needed to expand its existing facilities to accommodate the very large aircraft. The Department of Civil Aviation spent $120 million in upgrading the two of its terminals and airport infrastructure, including enlarged gate holdrooms, new finger piers, an enlarged runway, new airbridges and extended baggage belt carousels from the normal 70 to 90 m (230 to 300 ft).[129]

Dubai Airport also invested $3.5 billion into a new Concourse A, exclusively for handling Emirates A380s. With the changes made, the airport does not expect embarking and disembarking passengers and baggage from the A380 to take longer than it does for Boeing 747-400s, which carry fewer passengers. On 16 July 2008, Dubai Airport unveiled the first of two specially-built gates capable of handling the aircraft. Costing $10 million, the gates will enable passengers to get on the upper cabin of the new 555-seater aircraft directly from the gate hold rooms. The hold rooms themselves have been enlarged to cater for the larger number of passengers flying the A380s. In addition to the two gates at Terminal 1, five more A380-capable gates were opened at concourse B on 14 October 2008.[130] Concourse A opened on 2 January 2013.[131]

Labour Controversy

Most of the staff employed at construction sites across the country are foreign short-term workers from neighboring poorer Arab states, India and East Asia. This is generally because of UAE government welfare, most locals would rather rely on these benefits and not go to work.[132] Workers building a new terminal at Dubai International Airport went on strike in sympathy.[133] Another strike took place in October 2007. 4,000 strikers were arrested. Most of them were released some days later and those who are not local were then deported from Dubai.[134]

Airlines and destinations

Lufthansa Airbus A340-600 taking off from DXB
Cathay Pacific Airbus A330-300 at DXB
British Airways Boeing 777-200ER taking off from DXB
SriLankan Airlines Airbus A330-200 landing at DXB
Qantas Airbus A380-800 at DXB
KLM Airbus A330-200 taking off from DXB
Saudi Arabian Airlines Boeing 747-400 at DXB
FlyDubai Boeing 737-800 taking off from DXB
Mahan Air Boeing 747-300 at DXB
Scandinavian Airlines Airbus A340-300 taking off from DXB
Pakistan International Airlines Boeing 777-300ER landing at DXB
Emirates Airbus A380-800 taxiing to the runway at DXB
Qatar Airways Airbus A330-200 at DXB
Ethiopian Airlines Boeing 777-200LR landing at DXB
Air India Boeing 777-300ER landing at DXB
Virgin Atlantic Airbus A340-600 taking off from DXB

Passenger flights

This transport-related list is incomplete; you can help by expanding it.
Airlines Destinations Terminal
Aeroflot Moscow-Sheremetyevo 1
African Express Airways Berbera, Hargeisa, Mogadishu, Nairobi, Wajir 2
Afriqiyah AirwaysTripoli 1
Air Algérie Algiers 1
Air Astana Almaty 1
Airblue Islamabad, Karachi, Lahore, Peshawar 1
Air Canada Toronto-Pearson (begins 3 November 2015)[135] 1
Air China Beijing-Capital 1
Air France Paris-Charles de Gaulle 1
Air IndiaBangalore, Chennai, Delhi, Goa, Hyderabad, Kozhikode, Mumbai, Visakhapatnam 1
Air India ExpressAmritsar, Jaipur, Lucknow, Kochi, Kozhikode, Mangaluru, Pune, Thiruvananthapuram, Tiruchirapalli 2
Air Malta Charter: Malta 1
Alexandria Airlines Alexandria-El Nouzha 2
Ariana Afghan Airlines Kabul, Kandahar 2
Arik Air Abuja (ends 3 May 2015),[136] Lagos (ends 5 May 2015)[137] 1
Arkefly Seasonal charter: Amsterdam 1
Austrian Airlines Vienna 3
Azerbaijan Airlines Baku 1
Belavia Seasonal: Minsk-National 1
Biman Bangladesh Airlines Chittagong, Dhaka, Sylhet 1
British Airways London-Heathrow 1
Caspian Airlines Ahwaz, Tabriz, Tehran-Imam Khomeini 2
Cathay Pacific Bahrain, Hong Kong 1
Cebu Pacific Manila 1
China Eastern AirlinesKunming, Shanghai-Pudong 1
China Southern Airlines Guangzhou, Urumqi 1
Daallo Airlines Djibouti, Hargeisa, Mogadishu 1
Delta Air Lines Atlanta 1
Djibouti Air Djibouti 1
Dniproavia Seasonal: Kiev-Boryspil 1
EgyptAir Alexandria-El Nouzha, Cairo 1
Emirates Abidjan, Abuja, Accra, Addis Ababa, Adelaide, Ahmedabad, Algiers, Amman-Queen Alia, Amsterdam, Athens, Auckland, Baghdad (suspended),[138] Bahrain, Bangalore, Bangkok-Suvarnabhumi, Barcelona, Basra, Beijing-Capital, Beirut, Birmingham, Boston, Brisbane, Brussels, Budapest, Buenos Aires-Ezeiza, Cairo, Cape Town, Casablanca, Chennai, Chicago-O'Hare, Christchurch, Colombo, Copenhagen, Dakar, Dallas/Fort Worth, Dammam, Dar es Salaam, Delhi, Denpasar (begins 3 June 2015),[139] Dhaka, Doha, Dublin, Durban, Düsseldorf, Entebbe, Erbil, Frankfurt, Geneva, Glasgow-International, Guangzhou, Hamburg, Harare, Ho Chi Minh City, Hong Kong, Houston-Intercontinental, Hyderabad, Islamabad, Istanbul-Atatürk, Jakarta-Soekarno-Hatta, Jeddah, Johannesburg, Kabul, Karachi, Khartoum, Kochi, Kolkata, Kozhikode, Kuala Lumpur, Kuwait, Lagos, Lahore, Larnaca, Lisbon, London-Gatwick, London-Heathrow, Los Angeles, Luanda, Lusaka, Lyon, Madrid, Mahé, Malé, Malta, Manchester, Manila, Mauritius, Medina, Melbourne, Milan-Malpensa, Moscow-Domodedovo, Mumbai, Munich, Muscat, Nairobi-Jomo Kenyatta, New York-JFK, Newcastle, Nice, Orlando (begins 1 September 2015),[140] Osaka-Kansai, Oslo-Gardermoen, Paris-Charles de Gaulle, Perth, Phuket, Prague, Rio de Janeiro-Galeão, Riyadh, Rome-Fiumicino, Saint Petersburg, San Francisco, São Paulo-Guarulhos, Seattle/Tacoma, Seoul-Incheon, Shanghai-Pudong, Sialkot, Singapore, Stockholm-Arlanda, Sydney, Taipei-Taoyuan, Tehran-Imam Khomeini, Thiruvananthapuram, Tokyo-Haneda, Tokyo-Narita, Toronto-Pearson, Tunis, Venice-Marco Polo, Vienna, Warsaw-Chopin, Washington-Dulles, Zürich 3
Enter Air Seasonal: Katowice, Warsaw-Chopin 1
Equatorial Congo Airlines Brazzaville 2
Eritrean Airlines Asmara 2
Ethiopian Airlines Addis Ababa 1
Euro-Asia Air Atyrau 2
Eurowings
operated by SunExpress Deutschland
Cologne/Bonn (begins 3 January 2016)[141] 1
FinnairSeasonal: Helsinki 1
flydubai Abha, Addis Ababa, Aden, Ahmedabad, Ahwaz, Alexandria-Borg el Arab, Almaty, Amman-Queen Alia, Ashgabat, Baghdad, Bahrain, Baku, Bandar Abbas, Basra, Beirut, Belgrade, Bishkek, Bratislava, Bucharest, Bujumbura, Chennai,[142] Chișinău, Chittagong, Colombo, Dammam, Dar es Salaam, Delhi, Dhaka, Djibouti, Dnipropetrovsk, Doha, Dushanbe, Entebbe, Erbil, Gassim, Ha'il, Hamedan, Hyderabad, Isfahan, Istanbul-Sabiha Gökçen, Jeddah, Juba, Kabul, Kandahar, Karachi, Kathmandu, Kazan, Kharkiv, Khartoum, Kiev-Boryspil, Kiev-Zhulyany, Kochi, Krasnodar, Kuwait, Lar (begins 2 May 2015), Lucknow, Malé, Mashhad, Medina, Mineralnye Vody, Moscow-Vnukovo, Multan, Mumbai, Muscat, Najaf, Nejran, Nizhny Novgorod (begins 7 October 2015),[143] Novosibirsk (begins 4 October 2015),[143] Odessa, Osh, Port Sudan, Prague, Riyadh, Rostov-on-Don, Salalah, Samara, Sana'a, Sarajevo, Shiraz, Shymkent, Sialkot, Skopje, Sofia, Sulaymaniyah, Sylhet Tabriz, Tabuk, Ta'if, Tbilisi, Tehran-Imam Khomeini, Thiruvananthapuram, Ufa, Volgograd, Yanbu, Yekaterinburg, Yerevan, Zagreb, Zanzibar 2
Flynas Dammam, Jeddah, Madinah,[144] Riyadh 1
Georgian Airways Tbilisi 1
Gryphon Airlines Bagram, Kandahar, Kuwait, Ras al Khaimah 2
Gulf Air Bahrain1
I-Fly Charter: Moscow-Vnukovo 2
IndiGo Bangalore, Chennai, Delhi, Hyderabad, Kochi, Kozhikode, Mumbai, Thiruvananthapuram 1
Iran Air Bandar Abbas, Isfahan, Shiraz, Tehran-Imam Khomeini 1
Iran Aseman Airlines Abadan, Bandar Abbas, Bandar Lengeh, Bushehr, Gheshm, Kermanshah, Lar, Mashhad, Shiraz, Tehran-Imam Khomeini, Zahedan 2
Iraqi Airways Baghdad, Basra, Erbil, Mosul, Najaf 1
Jazeera Airways Bahrain, Kuwait 1
Jet Airways Delhi, Kochi, Mangaluru, Mumbai 1
Jordan Aviation Amman-Queen Alia, Aqaba 1
Jubba Airways Hargeisa, Mogadishu 2
Jupiter Airlines Arbil, Baghdad, Basra 2
Kabo Air Kano 1
Kam Air Kabul 1
Kenya Airways Nairobi-Jomo Kenyatta 1
Kish Air Isfahan, Khasab, Kish, Qeshm, Tabriz 2
KLM Amsterdam 1
Korean Air Seoul-Incheon 1
Kuwait Airways Kuwait, Muscat 1
Kyrgyzstan Aircompany Bishkek 2
Libyan Airlines Benghazi, Tripoli (all temporarily suspended) 1
Lufthansa Frankfurt, Munich 1
Mahan Air Tehran-Imam Khomeini 1
Malaysia Airlines Kuala Lumpur 1
MIAT Mongolian Airlines Charter: Ulan Bator 1
Middle East Airlines Beirut 1
Nordstar Airlines Krasnoyarsk-Yemelyanovo 1
Norwegian Air Shuttle Copenhagen, Oslo-Gardermoen
Seasonal: Stockholm-Arlanda
1
Oman Air Muscat, Salalah 1
Pakistan International Airlines Dera Ghazi Khan, Islamabad, Karachi, Lahore, Peshawar, Quetta 1
Pegasus Airlines Istanbul-Sabiha Gökçen 1
Philippine Airlines Manila 1
Primera Air Gothenburg-Landvetter, Malmö 1
Qantas London-Heathrow, Melbourne, Sydney 3
Qatar Airways Doha 1
Qeshm AirlinesIsfahan, Qeshm, Tehran-Imam Khomeini 2
Royal Brunei Airlines Bandar Seri Begawan, London-Heathrow 1
Royal Jordanian Amman-Queen Alia
Seasonal: Aqaba
1
RwandAir Kigali, Mombasa 1
S7 Airlines Novosibirsk 1
Safi Airways Bagram, Kabul 1
Saudia Dammam, Jeddah, Medina, Riyadh 1
Shaheen Air International Islamabad, Karachi, Lahore, Peshawar 1
Singapore Airlines Singapore 1
SmartWings
operated by Travel Service[145]
Prague 1
Somon Air Dushanbe, Jeddah 1
SpiceJet Ahmedabad, Amritsar, Delhi, Kochi, Madurai, Mangaluru, Mumbai, Pune 1
SriLankan Airlines Colombo 1
Sudan Airways Khartoum 1
Swiss International Air Lines Muscat, Zürich 1
Syrian Air Damascus 1
TAAG Angola Airlines Luanda 2
Taban Air Isfahan, Mashhad 2
TAROM Bucharest 1
Thai Airways Bangkok-Suvarnabhumi 1
Transaero Airlines Moscow-Vnukovo 1
Transavia Seasonal: Amsterdam 2
Travel Service Hungary Seasonal: Budapest 2
Tunisair Tunis 1
Turkish Airlines Istanbul-Atatürk 1
Turkmenistan Airlines Ashgabat 2
Ukraine International Airlines Kiev-Boryspil 1
United Airlines Washington-Dulles 1
Ural Airlines Chelyabinsk, Kazan, Krasnodar, Nizhny Novgorod, Samara, Ufa, Yekaterinburg 1
Uzbekistan Airways Tashkent 1
Virgin Atlantic Airways London-Heathrow 1
Yemenia Aden, Mukalla, Jakarta-Soekarno-Hatta, Kuala Lumpur, Sana'a 1

^1 Some of these flights may make a stop en route to the listed destination. However, the airline does not have the rights to carry passengers solely between Dubai and the intermediate stop.

Cargo

See also Dubai World Central - Al Maktoum International Airport

A FedEx McDonnell Douglas MD-11F at DXB
UPS Boeing 767-300ER at DXB
A DHL Aviation Boeing 777F operated by AeroLogic at DXB
Iran Air Cargo Boeing 747-200 taking off from DXB
Airlines Destinations
Air France Cargo Paris-Charles de Gaulle
British Gulf International Airlines Baghdad
Cargolux Hong Kong, Komatsu, Luxembourg[146]
Coyne Airways Baghdad, Bagram, Balad, Djibouti, Erbil, Kabul, Kandahar, Sana'a
DHL Aviation
operated by AeroLogic
Leipzig/Halle
Ethiopian Airlines Addis Ababa
FedEx Express Bangalore, Chengdu, Delhi, Goa, Hong Kong, Milan-Malpensa, Mumbai, Paris-Charles de Gaulle
FitsAir Abu Dhabi, Baghdad, Bagram, Balad, Colombo, Erbil, Herat, Jalalabad, Kabul, Kandahar, Lashkar Gah, Sharana, Sulaymaniyah, Tarin Kowt, Thumrait
Jett8 Airlines Amsterdam, Singapore
Iran Air Cargo Tehran-Imam Khomeini
Maximus Air Cargo Lahore, Karachi
Polar Air Cargo Seoul-Incheon
Qatar Airways Cargo Doha, Karachi
Polet Cargo Airlines Toulouse, Voronezh
Royal Airlines Karachi
Royal Jordanian Cargo Amman-Queen Alia
SAS Cargo Group Gothenburg-Landvetter
Shaheen Air International Cargo Karachi
Silk Way Airlines Baku
Star Air Aviation Karachi
TAROM Bucharest
TCS Couriers Lahore, Karachi
TNT Airways Delhi, Liege
Trans Mediterranean AirwaysBeirut
UPS Airlines Bangkok-Suvarnabhumi, Clark, Cologne/Bonn, Guangzhou, Hong Kong, Mumbai, Singapore, Sydney

Services

Passenger services

The airport has over 26,000 m2 (280,000 sq ft) of retail space spread between its three main terminals and includes many shopping and eating outlets.[147] The Dubai duty-free shopping area in Terminal 2 covers 1,400 m2 (15,000 sq ft) in departures and 50 m2 (540 sq ft) arrivals. The 3,437 m2 (37,000 sq ft) extension included a larger arrivals hall as well.

Extensive upgrading work on existing retail areas since 2004 in Terminals 1 and 2 has increased sales. Dubai Duty Free announced annual sales of Dhs5.9 billion (US$1.6 billion) in 2012, representing a 10 per cent increase on the previous year. In 2008, Dubai Duty Free doubled its retail space from 7,000 to 15,000 m2 (75,000 to 161,000 sq ft) with the inauguration of the new Emirates Terminal 3 in October 2008. Dubai Duty Free recorded more than 23.5 million transactions in 2012.[147] As of August 2009, Dubai Duty Free was the biggest single airport retail operation in the world ahead of London Heathrow and Seoul Incheon airports.

In addition to a wide array of duty-free shops and eating outlets, Dubai Airport has two open-air garden areas. Dubai Airport has numerous business centres located around the airport. Within the international transit area of the interconnected Terminals 1 and 2, internet and games facilities, prayer rooms, showers, spas, gym, swimming pool and three hotels are provided. Various lounge areas are provided, some including children's play areas or televisions showing news, movies and sports channels.[148]

The Emirates Flight Catering centre which was expanded in 2007, is capable of producing 115,000 meals per day[149]
Emirates Aircraft Hangars

Aviation services

Ground handling

Ground handling services at Dubai International Airport has been provided by Dnata Ground Handling Services. Emirates Airlines is handled by its own 2000+ strong Airport Services department .[150]

Services include cargo ramp and technical support services to airlines at Dubai Airport.[151]

Aircraft maintenance

Emirates Engineering, based in Dubai, operates the aircraft maintenance and engine test cell technical facilities at the airport. Emirates Engineering currently provides full support for the Emirates Airline fleet and all the other international operations at the airport.[152]

Current facilities include:[153][154]

Safety and security

Passport entry stamp from Dubai International Airport (right in black ink). Exit stamp is from Abu Dhabi International Airport.
E-gate counters, at Passport Control. The new system was introduced to make access into the UAE easier.

The Civil Aviation Authority of Dubai manages the overall safety and security of the airport. Pre-screening takes place in all terminals at the entrance of the airport.[156]

Retinal scanning has been implemented in all UAE airports. This type of scanning prevents those deported from the UAE for serious criminal charges from returning again using fradulent documents (UAE nationals are exempt from retinal scans). Carry-on luggage and personal screening are conducted at the individual departure gates, while check-in luggage is screened in the backrooms and secured before loading. Dubai Airport Police plans to introduce a biometric identification system for access into restricted areas.[157]

In view of the 2006 transatlantic aircraft plot, security screening checks have been stepped up on passengers and their hand-carry luggage, as well as checked-in luggage on flights bound for destinations in the United Kingdom and the United States from Dubai. Prospective passengers should especially note that measuring tapes of all kinds, ropes & electrical cables are likely to be confiscated from hand-carry luggage, as well as the items regularly prohibited elsewhere.

In early 2007, Dubai Airport introduced a new type of airport screening device which not only detected weapons, but also could screen the passenger for drugs in the blood. With the new system in place, travellers entering Dubai can be jailed for four years or more if found in possession (including in the bloodstream and the bottom of the shoes[158]) of illegal drugs (even in quantities as small as 0.001 g (3.5×10−5 oz)), including poppy seeds from bagels and prescription and over-the-counter medicines such as codeine.[159] A senior Dubai judge was quoted on 11 February 2008, by Seven Days saying, "These laws help discourage anyone from carrying or using drugs. Even if the amount of illegal drugs found on someone is 0.05 grams, they will be found guilty. The penalty is death. The message is clear – drugs will not be tolerated."[159] A number of travellers have been held pending charge while Dubai authorities test their possessions, blood and urine for any trace of contraband.[160]

Operations

Passenger operations

Busiest Routes from DXB (2014)
Annual Passengers Carried
RankAirportPassengers Handled[161]O&D Passengers (thousands)[162]
1  United Kingdom, London Heathrow 2,626,357 1,014
2  Qatar, Doha 2,355,959 N/A
3  Kuwait Kuwait City 1,942,479 430
4  India, Mumbai 1,939,116 N/A
5  Saudi Arabia, Jeddah 1,699,061 423 5
Top Country Destinations from DXB (2014)
Annual Passengers Carried
RankCountryPassengers Carried[163]
1  India 8,908,362
2  United Kingdom 5,381,909
3  Saudi Arabia 4,883,438
4  Pakistan 3,313,431

As all passenger traffic out of the airport is international in nature, the three major terminals in operation are equipped with immigration-processing facilities for international travel.

Since there are international flights operating out from the airport, the terminals of the airport are equipped with immigration processing facilities and security scanning for all passengers including domestic, and regional passengers. Terminals 1, and 3 handle 95 per cent of the international flights, whilst Terminal 2 mainly caters to regional flights and international flights routed to other airports in Iran and Saudi Arabia. Emirates Airline operates from only Terminal 3. Conversely, low cost carriers such as Flydubai operate flights out of terminal 2.[164]

Passenger growth at the airport has been growing at an average rate of 18 per cent. The airport reached its capacity of 33 million passengers per annum by 2007, however this was still not enough to handle the growing over congestion at the airport. As 2013 the airport's capacity reached 75 million with the opening of concourse A and expansion of Terminal 2.

Passenger traffic for 2014 grew by 7.5 percent as 70.48 million passengers passed through Dubai International, compared to 66.43 million during the corresponding period in 2013.[8] Growth slowed down in 2014 due to the 80 day runway resurfacing project, which saw DXB operate with only 1 runway between May and July.

In 2014, India was DXB's biggest destination with 8.91 million passengers. The UK, Saudi Arabia and Pakistan followed with 5.38 million, 4.88 million and 3.13 million respectively. London Heathrow became the top city destination, recording 2,626,357 passengers. Doha followed it with 2,355,959.[165]

Cargo

The airport handled 2.37 million tonnes of air cargo in 2014, a decrease of 3.1 percent over 2013, making it the 6th-busiest airfreight hub in the world and the busiest in the Middle East.[3] The decline was due to the runway closure, and the shifting of many cargo flights from DXB to Al Maktoum International Airport.

Ground transportation

Road

D 89 leading to Dubai Airport

The airport is connected by the road D 89. One of the longest intra-city roads, D 89 begins at the Deira Corniche and runs perpendicular to D 85 (Baniyas Road). From Deira, the road progresses south-eastward towards Dubai International Airport, intersecting with E 311 (Emirates Road) past the airport.[166]

Metro

Main article: Dubai Metro

The airport is served by Dubai Metro, which operates two lines through or near the airport. The Red Line has a station at each of Terminal 3 and Terminal 1. Services run between 6 am and 11 pm every day except Friday, when they run between 1 pm and midnight. These timings differ during the Islamic holy month of Ramadan. The stations are located in front of both terminals, and can be accessed directly from the arrivals areas.

The Green Line has at a station near the Airport Free Zone, from which passengers can connect to Terminal 2.[167]

Bus

Dubai Buses operated by RTA run a number of routes to the city but mainly Deira, and are available at the Airport Ground Transportation centre and the Arrivals at every terminal.

Passengers who need to transfer between Terminal 1 and 3 and Terminal 2 can use the inter-terminal shuttle bus service which operates frequently.

Bus stations are situated opposite both Terminal 1, 2, and 3. Local buses 4, 11, 15, 33 and 44 can be used to connect with Terminal 1 and 3, while bus 2 connects with Terminal 2. Dubai International Airport Buses provide air-conditioned transport into the city centre and over 80 hotels in the city.[168]

Emirates offers a complimentary coach service, which operates 3 daily services to and from Al Ain, and 4 daily, to and from Abu Dhabi.[169]

Service[170] Destination Notes
RTA Buses
4 Al Rashidiya Bus Station
33 Al Qusais Industrial Station
34 Al Rashidiya Bus Station
44 Al Gubaiba Bus Station
48 Al Rashidiya Bus Station
64 Ras Al Khor Terminus
401 Deira Terminus
402 Al Karama Terminus
11A Awir Terminus
11C CWC Terminus
32C Satwa Bus Station
11M Khawaneej
C01 Gold Souk Terminal Station
C8 Zabeel
C26 Safa Park
X28 Jebel Ali Terminus

Taxi

The airport is served by the Government owned Dubai Taxi Agency, which provides 24-hour service at the arrivals in every terminal.

Accidents and incidents

In media

In 2013, Dubai International Airport was featured in a 10 part documentary series called Ultimate Airport Dubai that aired on National Geographic and was produced by Arrow Media and National Geographic Channels International.[176] The documentary focused on the everyday operations of the airport.[177][178] The series returned for a second season in 2014 and is due to air in 2014 and 2015 on National Geographic.[179]

Accolades

See also

References

  1. 1.0 1.1 http://content.emirates.com/downloads/ek/pdfs/int_gov_affairs/Oxford_Economics_Quantifying_the_Economic_Impact_of_Aviation_in_Dubai_November_2014_Final_v1.pdf
  2. 2.0 2.1 United Arab Emirates AIP (login required)
  3. 3.0 3.1 "Preliminary 2012 World Airport Traffic and Rankings". Aci.aero. Retrieved 29 March 2013.
  4. Iyer, Srinivasan (30 December 2014). "Dubai International is world’s busiest airport". The National. Retrieved 4 January 2015.
  5. http://www.aci.aero/Data-Centre/Monthly-Traffic-Data/Passenger-Summary/Year-to-date
  6. http://www.aci.aero/Data-Centre/Monthly-Traffic-Data/Freight-Summary/Year-to-date
  7. "Dubai Airport is world's busiest A380 hub". Emirates 24|7. 23 March 2015. Retrieved 24 March 2015.
  8. 8.0 8.1 http://www.dubaiairports.ae/corporate/media-centre/press-releases/detail/dxb-takes-over-top-spot-for-international-passenger-traffic
  9. "Dubai International Airport". World Airport Guide. Retrieved 12 August 2008.
  10. http://www.arabianbusiness.com/emirates-lose-272m-during-dubai-int-l-runway-closures-547042.html#.U1K87_ldXqM
  11. Largest international airline is worth US,1 billion Airport needs to add 100-million-passenger. Eturbonews.com (28 July 2013). Retrieved on 16 August 2013.
  12. "Fact sheets, Reports & Statistics". Dubaiairport.com. Retrieved 4 July 2013.
  13. http://www.dubaiairport.com/en/media-centre/Pages/press-releases.aspx?id=166
  14. http://khaleejtimes.ae/biz/inside.asp?xfile=/data/aviation/2014/December/aviation_December35.xml&section=aviation
  15. http://english.alarabiya.net/en/business/aviation-and-transport/2014/11/17/Aviation-to-drive-37-of-Dubai-economy-by-2020-study-.html
  16. "Dubai's First International Airport". Dubaiasitusedtobe.com. Retrieved 16 July 2009.
  17. Costain: Did you know? – item 27
  18. Dubai FAQs. "Dubai Airport". Dubaifaqs.com. Retrieved 16 July 2009.
  19. "Kuwait airways | Flight Archive". Flight International. Retrieved 16 July 2009.
  20. "Dubai's Original Airport". Dubaiasitusedtobe.com. Retrieved 16 July 2009.
  21. "Dubai Airport (DXB) Information: Airport in Dubai Area, United Arab Emirates". Dubai-dxb.airports-guides.com. 9 July 2009. Retrieved 16 July 2009.
  22. "Dubai International Airport". Dubaiairport.com. Archived from the original on 14 June 2008. Retrieved 16 July 2009.
  23. "Dubai International Airport". Dubaiairport.com. Archived from the original on 22 June 2008. Retrieved 16 July 2009.
  24. Official website on Airport History visited 4 August 2008
  25. "Dubai International Airport". Dubai.airporthotelguide.com. Retrieved 16 July 2009.
  26. "Airport-technology.com". Airport-technology.com. 14 October 2008. Retrieved 20 September 2010.
  27. "Airport.ae". Airport.ae. Retrieved 20 September 2010.
  28. "Welcome to Zawya". Zawya.com. Retrieved 16 July 2009.
  29. Advanced Digital Technology www.adtworld.com (14 October 2008). "Gulfnews: First flight sails through Emirates Terminal 3". Archive.gulfnews.com. Retrieved 16 July 2009.
  30. "Dubai International Airport celebrates 50th year". gulfnews. Retrieved 23 April 2012.
  31. 31.0 31.1 31.2 "Concourse 3 to be completed by late 2012". Retrieved 2 September 2012.
  32. New projects
  33. "Welcome to Zawya". Zawya.com. Retrieved 16 July 2009.
  34. "Welcome to Zawya". Zawya.com. Retrieved 16 July 2009.
  35. "Dubai Airport suggests alternative to Purple Line of Dubai Metro". Dubai Chronicle. 20 June 2009. Retrieved 16 July 2009.
  36. "Dubai Airports to launch plans for Concourse 4 this year". gulfnews. 4 May 2011. Retrieved 23 April 2012.
  37. 37.0 37.1 37.2 37.3 "New signage at Dubai airport". Khaleejtimes.com. 19 September 2012. Retrieved 29 October 2012.
  38. "Airports & Flights: Dubai Intl. Airport (DXB/OMDB)". Travel.theemiratesnetwork.com. Retrieved 20 September 2010.
  39. UAE: Dubai Airport targets 25 million passengers by year end. – IPR Strategic Business Information Database. Encyclopedia.com (16 October 2005). Retrieved 16 July 2009.
  40. "DubaiAirport.com" (PDF). Retrieved 20 September 2010.
  41. "Dubai International Airport | dubai airport | intl airport dubai | airport dubai | airport uae". Airport.ae. Retrieved 25 November 2012.
  42. "Dubai International Airport (DXB/OMDB)". Airport Technology. Retrieved 29 October 2012.
  43. "The apron area around the new concourse B was upgraded in a project completed in 2003; this new strengthened area provides for 27 wide-bodied aircraft stands. – Image – Dubai International Airport (DXB/OMDB)". Airport-technology.com. Retrieved 16 July 2009.
  44. "Dubai flower hub could be a thorn for the Dutch. (21 October 2005) Asia Africa Intelligence Wire". Accessmylibrary.com. 21 October 2005. Retrieved 25 November 2012.
  45. 45.0 45.1 "Dargroup.com" (PDF). Retrieved 20 September 2010.
  46. "Dubai Airport Terminal 3 launch date likely to be decided in August". Gulfnews.com. Retrieved 25 November 2012.
  47. "Emirates Engineering". Theemiratesgroup.com. 17 May 2011. Retrieved 25 November 2012.
  48. "Emirates Flight Catering". Theemiratesgroup.com. Retrieved 25 November 2012.
  49. "Dubai Airports launches new facility for Executive Flights Centre | Dubai Airports". Ameinfo.com. 17 November 2008. Archived from the original on 25 September 2012. Retrieved 25 November 2012.
  50. http://www.dubaiairports.ae/corporate/media-centre/fact-sheets/detail/runway-closure-may-july-2014
  51. "Business – Dubai's Terminal 2 capacity to double by June". Khaleejtimes.com. Retrieved 4 July 2013.
  52. Dubai World Central celebrates inauguration of Al Maktoum International Airport at the Wayback Machine (archived 31 August 2010)
  53. "Dubai World Central to go live in 2010 – Construction & Industry". ArabianBusiness.com. Retrieved 26 August 2009.
  54. "Dubai metro's Purple line faces year-long delay". Meed.com. 18 January 2009. Retrieved 16 July 2009.
  55. "Dubai International Airport". Dubaiairport.com. Retrieved 16 July 2009.
  56. http://www.dubaiairports.ae/docs/default-source/pdf/dubaiairports_infographic-pdf.pdf?sfvrsn=2
  57. Thome, Wolfgang H. (3 September 2008). "Move To Occur in Mid-October Emirates moving to new Terminal 3 in Dubai". eTurboNews.com. Retrieved 16 July 2009.
  58. Advanced Digital Technology www.adtworld.com. "Emirates SkyCargo ready to handle bigger cargo traffic as non-stop LA flights commence". Gulfnews. Retrieved 16 July 2009.
  59. "Flydubai to fly from Terminal 2 | Aviation". Ameinfo.com. Retrieved 16 July 2009.
  60. "Qantas, Emirates announce global aviation partnership". Qantas.com. Retrieved 6 September 2012.
  61. "The Aviation Club". Aviationclub.ae. Retrieved 16 July 2009.
  62. "Dubai International Airport". Dubaiairport.com. 6 May 2007. Retrieved 16 July 2009.
  63. Al Maktoum International at Dubai World Central (DWC)
  64. Royal Airwing
  65. http://www.dubaiairports.ae/corporate/media-centre/fact-sheets/detail/dubai-airports-terminal-1
  66. Dubai International Airport Concourse D
  67. Dubai International Terminal 2 at the Wayback Machine
  68. Dubai International Terminal 3 at the Wayback Machine
  69. "As a response to soaring passenger numbers, major airport expansion projects are taking place throughout the UAE.". Airport Technology. Retrieved 16 July 2009.
  70. "$82 bn earmarked for Dubai airport expansion". Projectsmonitor.com. 22 October 2007. Retrieved 16 July 2009.
  71. "Dubai International Airport [DXB/OMDB] – TEN Travel & Tourism [UAE]". Travel.theemiratesnetwork.com. Retrieved 16 July 2009.
  72. http://vision.ae/en/special_report/delivering_the_vision_dubai_international_airport
  73. "Aviation Dubai" (PDF). Retrieved 16 July 2009.
  74. "Dubai International Airport (DXB/OMDB)". Airport Technology. Retrieved 16 July 2009.
  75. "Dubai International Airport". Dubaiairport.com. Retrieved 16 July 2009.
  76. http://www.railway-technology.com/news/newsbombardier-build-automated-people-mover-system-dubai-airport
  77. 78.0 78.1 "Dubai International Airport". Dubaiairport.com. 19 November 2008. Retrieved 16 July 2009.
  78. "Dubai International Airport". Dubaiairport.com. 16 June 2009. Retrieved 16 July 2009.
  79. "Dubai International Airport". Dubaiairport.com. Retrieved 16 July 2009.
  80. http://www.thenational.ae/news/uae-news/major-renovations-planned-for-dubai-airports-terminal-1
  81. "Dubai Airport". Dubai Airport. 1 May 1998. Retrieved 20 September 2010.
  82. 83.0 83.1 "Full Throttle at Emirates Terminal 3". Emirates. 5 November 2008. Retrieved 27 August 2009.
  83. "Dubai Airports: No decision yet on Terminal 4". ArabianBusiness.com. 15 November 2008. Retrieved 16 July 2009.
  84. "Dubai plans Terminal 4". Ameinfo.com. Retrieved 20 September 2010.
  85. "Dubai Airports to launch plans for Concourse 4 this year". gulfnews. 4 May 2011. Retrieved 23 April 2012.
  86. https://www.zawya.com/story/Dubai_Airport_to_handle_200_million_passengers_by_2030-ZAWYA20150313034436/
  87. https://www.zawya.com/story/New_Dubai_airport_to_handle_20m_passengers_in_2020-GN_25032015_260347/
  88. Sarah Cowell (9 June 2009). "Terminal 2 handed over to Flydubai | Supply Chain News". ArabianSupplyChain.com. Retrieved 16 July 2009.
  89. "Terms and conditions." Flydubai. Retrieved 21 June 2010. "The website is owned and operated by flydubai, whose principal office is at Dubai International Airport, Terminal 2, PO Box 353, Dubai, United Arab Emirates. flydubai is a Dubai corporation formed by the government of Dubai in July 2008."
  90. "Flydubai to fly from Terminal 2". Ameinfo.com. Retrieved 20 September 2010.
  91. "The Sky is the Limit". Atwonline.com. Retrieved 27 August 2009.
  92. "Qantas and Emirates partnership". Qantas.com.au. 4 October 2012. Retrieved 25 November 2012.
  93. http://www.mitsubishitoday.com/peoplemover/ht/d/sp/i/2668/pid/2668
  94. "Dubai Airport Terminal 3 Set To Open". Dubai Informer. 28 February 2009. Retrieved 27 August 2009.
  95. "Dubai Airports' CEO, Paul Griffiths, takes us on a tour of the new terminal at the world's fastest growing airport". Arabianbusiness.com. 12 November 2008. Retrieved 20 September 2010.
  96. Dubai Government. "eGate Card for Dubai & Abu Dhabi". Dubai.ae. Retrieved 20 September 2010.
  97. "Dubai International Airport Terminal 3, Editorial, world architecture news, architecture jobs". Worldarchitecturenews.com. 23 October 2008. Retrieved 27 August 2009.
  98. Advanced Digital Technology www.adtworld.com (12 October 2008). "Xpress: News | Terminal 3 wows all". Xpress4me.com. Retrieved 27 August 2009.
  99. "Businesstraveller.com". Businesstraveller.com. Retrieved 20 September 2010.
  100. http://www.dubaiairport.com/en/media-centre/facts-figures/pages/factsheets-reports-statistics.aspx?id=10
  101. "Concourse 3 at Dubai International Airport | Construction Projects". ConstructionWeekOnline.com. 5 May 2009. Retrieved 26 August 2009.
  102. "Firm pulls out of Dubai airport project – The National Newspaper". Thenational.ae. 16 April 2009. Retrieved 16 July 2009.
  103. "Fact sheets, Reports & Statistics". Dubaiairport.com. 4 October 2012. Retrieved 29 October 2012.
  104. "/ Concourse 3 contract award". Trend-news.com. Retrieved 27 August 2009.
  105. "Super-sized for a super-jumbo: Dubai opens new airport concourse specially designed for the Airbus A380". Daily Mail (London).
  106. "T3 revealed – Transportation". ArabianBusiness.com. Retrieved 27 August 2009.
  107. "Lounges | Emirates Online Booking and Planning". Emirates. 18 August 2009. Retrieved 27 August 2009.
  108. "Terminal 3 Dubai International Airport | Business Lounge". Dubai-online.com. 28 April 2009. Retrieved 27 August 2009.
  109. "Airport Hotel | Emirates Online Booking and Planning". Emirates. 18 August 2009. Retrieved 27 August 2009.
  110. "Dubai Airports to start first phase of operations at T3 from Oct 14". Eyeofdubai.ae. 14 October 2008. Retrieved 16 July 2009.
  111. "Fact sheets, Reports & Statistics". Dubaiairport.com. Retrieved 23 April 2012.
  112. "Fact sheets, Reports & Statistics". Dubaiairport.com. 3 April 2012. Retrieved 23 April 2012.
  113. "Dubai Weekly Newsletter Blog – Dubai Airports launches new facility for Executive Flights Centre". Dubaitourism.ae. Retrieved 20 September 2010.
  114. "Dubai Airports launches new facility for Executive Flights Centre – Industry Press Releases". Arabianbusiness.com. 16 November 2008. Retrieved 20 September 2010.
  115. "Dubai Airport launches Executive Flights Centre at Dubai International Airport. | Management > Personal & Business Support Services from". AllBusiness.com. 19 November 2008. Retrieved 20 September 2010.
  116. Dubai Airports launches new facility for Executive Flights Centre
  117. "Gulfnews: DCV: Promoting Dubai's image as the freight hub". Archive.gulfnews.com. Retrieved 16 July 2009.
  118. "Gulfnews: It's all about trade". Archive.gulfnews.com. Retrieved 16 July 2009.
  119. "Dubai Flower Centre to accommodate retail sector". ArabianBusiness.com. 1 November 2007. Retrieved 16 July 2009.
  120. www.freezonesuae.com. "Dubai Flower Center Free Zone". Freezonesuae.com. Archived from the original on 16 December 2009. Retrieved 27 August 2009.
  121. "Coolchain.org" (PDF). Retrieved 20 September 2010.
  122. UAEinteract.com. "Dubai Flower Centre to tap US$1 billion Indian floriculture export market UAE – The Official Web Site". Uaeinteract.com. Retrieved 27 August 2009.
  123. "DBX A380 ready". Airport-technonlogy.com. Retrieved 29 October 2012.
  124. "Dubai Airports gets approval for upgraded landing system". Dubai Airport. 8 March 2009. Retrieved 8 March 2009.
  125. David Black (23 May 2013). "Dubai International Airport runway upgrades to reduce flights in 2014 – The National". Thenational.ae. Retrieved 4 July 2013.
  126. "Dubai International Airport to upgrade runways". GulfNews.com. 9 May 2013. Retrieved 4 July 2013.
  127. http://www.thenational.ae/uae/transport/dubai-international-runway-closures-emirates-details-plan-to-cut-5-400-flights
  128. "MCLI.co.za". Retrieved 20 September 2010.
  129. "Dubai International Airport". Dubaiairport.com. Retrieved 16 July 2009.
  130. "Dubai opens new A380 airport terminal – Transport". ArabianBusiness.com. Retrieved 4 July 2013.
  131. http://www.thenational.ae/thenationalconversation/comment/emiratisation-wont-work-if-people-dont-want-to-learn
  132. "Workers Riot at Site of Dubai Skyscraper", by Jim Krane, Breitbart.com, March 22, 2006
  133. "Striking Workers Released From UAE Jail", by Barbara Surk, The Associated Press, October 31, 2007
  134. Air Canada to Launch Non-stop Service to Dubai
  135. "Arik Air Dubai Service Changes from May 2015". Airlineroute.net. 24 April 2015. Retrieved 25 April 2015.
  136. "Arik Air New York Aircraft Changes; Dubai Suspension from May 2015". Airlineroute.net. 30 April 2015. Retrieved 30 April 2015.
  137. http://www.newkerala.com/news/2015/fullnews-12055.html
  138. "Emirates to commence daily service to Bali" (Press release). Emirates. 2 March 2015. Retrieved 2 March 2015.
  139. "Emirates to Start Orlando Operation from Sep 2015". AirlineRoute. Retrieved 24 March 2015.
  140. https://www.facebook.com/KoelnBonnAirport/posts/899956090049850
  141. http://www.flydubai.com/en/news/article/flydubai-announces-three-new-routes/
  142. 143.0 143.1 http://www.traveldailymedia.com/220777/flydubai-expands-its-russia-network/. Missing or empty |title= (help)
  143. "flynas Adds Madinah – Dubai Route from April 2015". Airlineroute.net. 27 February 2015. Retrieved 28 February 2015.
  144. "SmartWings Contact". smartwings.com.
  145. http://www.flightradar24.com/flight/cv8564
  146. 147.0 147.1 "Dubai Duty Free's 2012 sales hit $1.6bn – Retail". ArabianBusiness.com. 2 January 2013. Retrieved 4 July 2013.
  147. "Annual Reports, Facts and Figures | The Emirates Group". Mediacentre.ekgroup.com. 9 July 2009. Retrieved 16 July 2009.
  148. "Emirates | Flight Catering". Ekfc.com. Retrieved 23 April 2012.
  149. "Ground Handling EKAS". Emirates Airport Services.
  150. "Ground Handling". Dnata. Retrieved 16 July 2009.
  151. "Emirates | Engineering". Emiratesengineering.com. Retrieved 16 July 2009.
  152. "Emirates starts building one of the world's largest and most sophisticated engine test facilities | Emirates Engineering". Ameinfo.com. 26 February 2007. Retrieved 16 July 2009.
  153. "Location and Facilities | Emirates Group Careers Centre". Emiratesgroupcareers.com. 29 March 2009. Retrieved 16 July 2009.
  154. World's%20Largest%20airport%20hangar "Dubai builds 'World's Largest' airport hangar". Zawya.com. 15 May 2005. Retrieved 27 August 2009.
  155. "Dubai International Airport". Dubaiairport.com. Retrieved 27 August 2009.
  156. "Dubai airport guide – security". Dubaiairport.com. Retrieved 20 September 2010.
  157. "Briton jailed for four years in Dubai after customs find cannabis weighing less than a grain of sugar under his shoe". Daily Mail (UK). 8 February 2008. Retrieved 2 January 2014.
  158. 159.0 159.1 Paul McLennan and Ali Al-Shouk (11 February 2008). "Tourists get drug warning". Seven Days. Archived from the original on 10 May 2008. Retrieved 12 February 2008.
  159. "Charity issues urgent warning to all travellers to UAE after Briton is imprisoned for 4 years". Fair Trials International. 7 February 2008. Retrieved 12 February 2008.
  160. http://www.dubaiairports.ae/docs/default-source/pdf/dubaiairports_infographic-pdf.pdf?sfvrsn=
  161. http://newsroom.mastercard.com/mea/files/2014/07/Mastercard_GDCI_2014_FINAL1.pdf
  162. http://www.dubaiairports.ae/docs/default-source/pdf/dubaiairports_infographic-pdf.pdf?sfvrsn=
  163. "Flydubai reveals Terminal 2 launch". Arabianbusiness.com. Retrieved 20 September 2010.
  164. passengers.http://www.dubaiairports.ae/docs/default-source/pdf/dubaiairports_infographic-pdf.pdf?sfvrsn=
  165. "Dubai International Airport Ground Transportation". Airport-dubai.net. Retrieved 16 July 2009.
  166. "Dubai Metro – Most Advanced Urban Rail Systems". Railway Technology. Retrieved 16 July 2009.
  167. "Dubai International Airport". Dubaiairport.com. 1 May 1998. Retrieved 16 July 2009.
  168. "Free Shuttle Service | Emirates United Arab Emirates". Emirates.com. 10 March 2012. Retrieved 23 April 2012.
  169. "Dubai Airport Guide (DXB)". Worldairportguide.com. Retrieved 16 July 2009.
  170. "Captain Jim Futcher". The Daily Telegraph (London). 31 May 2008. Retrieved 31 May 2008.
  171. "Aviation Safety Network Report". Aviation Safety Network. 12 March 2007.
  172. "Dubai Jet Accident Injures 14". CNN. 12 March 2007.
  173. Flight International 20–26 March 2007
  174. "N571UP Accident description". Aviation Safety Network. Retrieved 3 September 2010.
  175. http://www.dubaiairport.com/en/media-centre/pages/press-releases.aspx?id=105
  176. http://www.thenational.ae/business/industry-insights/aviation/national-geographic-to-feature-dubai-international-in-10-part-series
  177. http://gulfnews.com/arts-entertainment/television/ultimate-airport-dubai-tv-show-premieres-on-national-geographic-channel-1.1227202
  178. https://en-maktoob.entertainment.yahoo.com/news/ultimate-airport-dubai-returns-season-2-055048056.html
  179. "ASQ Award for Best Airport in Middle East" Airports Council International. 14 February 2012. Retrieved 13 April 2012
  180. "ASQ Award for Best Improved – Middle East" Airports Council International. 14 February 2012. Retrieved 13 April 2012

External links

Media related to Dubai International Airport at Wikimedia Commons
Dubai International Airport travel guide from Wikivoyage