Dehradun Express


Dehradun Express
Overview
Service type Express
Current operator(s) Western Railways
Route
Start Bandra Terminus
Stops 96 as 19019 Dehradun Express, 89 as 19020 Dehradun Express
End Dehradun
Distance travelled 1,682 km (1,045 mi)
Average journey time 41 hours 30 minutes as 19019 Dehradun Express, 41 hours 45 minutes as 19020 Dehradun Express
Service frequency Daily
Train number(s) 19019 / 19020
On-board services
Class(es) AC 2 tier, AC 3 tier, Sleeper, General Unreserved
Seating arrangements Yes
Sleeping arrangements Yes
Catering facilities No
Observation facilities No rake sharing but multiple rakes required to maintain daily service.
Technical
Rolling stock Standard Indian Railways coaches
Track gauge 1,676 mm (5 ft 6 in)
Operating speed 110 km/h (68 mph) maximum
40.41 km/h (25 mph), including halts
Route map

The 19019/19020 Bandra Dehradun Dehradun Express is a Express train belonging to Indian Railways that runs between Bandra & Dehradun in India. It is a daily service.

It operates as train number 19019 from Bandra to Dehradun and as train number 19020 in the reverse direction.

Coaches

It has 1 AC 2 tier, 1 AC 3 tier, 10 Sleeper class, 7 General class coaches. As with most train services in India, Coach Composition may be amended at the discretion of Indian Railways depending on demand.

It also carries High Capacity parcel vans on a frequent basis. About 4 sleeper class coaches & 2 general coaches are detached/attached from/to the train at Haridwar Junction.

Service

It is a daily train & covers the distance of 1682 kilometres in 41 hours 30 mins as 19019 Dehradun Express (40.53 km/hr) & 41 hours 45 mins as 19020 Dehradun Express (40.29 km/hr).

Traction

Before the Mumbai region changed traction to AC system, a WCAM 1 engine would haul the train until Vadodara from where a Vadodara based WAP 4 or WAP 5 would take over until Hazrat Nizamuddin after which a WDM 3A engine from the Tuglakabad shed would take over until Dehradun.

Since Western Railways has switched over to AC traction, a Ghaziabad based WAP 7 hauls the train until Hazrat Nizamuddin after which a WDM 3A engine from the Tuglakabad shed takes over until Dehradun.

It has 2 direction reversals at Saharanpur & Laksar Junction.

19019 Dehradun Express

Time Table

19019 Bandra Dehradun Dehradun Express leaves Bandra Terminus every day at 00:05 hrs IST and reaches Dehradun at 17:35 hrs IST the next day.

19020 Dehradun Bandra Dehradun Express leaves Dehradun every day at 10:35 hrs IST and reaches Bandra Terminus at 04:20 hrs IST on the 3rd day.

Station Code Station Name

19019 - Bandra to Dehradun [1]

Distance
from Source
in km
Day

19020 - Dehradun to Bandra[2]

Distance
from Source
in km
Day
Arrival Departure Arrival Departure
BDTS Bandra Terminus Source 00:05 0 1 04:20 Destination 1682 3
PLG Palghar 01:35 01:37 75 1 02:02 02:06 1616 3
ST Surat 04:40 04:45 252 1 22:30 22:38 1430 2
BRC Vadodara Junction 06:40 06:50 381 1 19:55 20:05 1301 2
RTM Ratlam Junction 12:20 12:40 642 1 14:15 14:35 1040 2
KOTA Kota Junction 19:00 19:30 909 1 07:30 07:50 773 2
GGC Gangapur City 22:40 22:45 1081 1 04:20 04:25 601 2
NZM Hazrat Nizamuddin 05:25 05:50 1366 2 21:15 21:55 316 1
MTC Meerut City Junction 07:25 08:30 1436 2 18:35 19:20 246 1
SRE Saharanpur Junction 12:10 12:45 1550 2 15:35 16:05 132 1
LAK Laksar Junction 13:45 14:10 1603 2 14:00 14:25 79 1
HW Haridwar Junction 14:50 15:15 1630 2 12:15 12:45 52 1
DDN Dehradun 17:35 Destination 1682 2 Source 10:35 0 1

Incidents

On 8 January 2014, a fire broke out on one of the trains when it was near Dahanu station in Maharashtra. Three carriages were involved. Some passengers escaped "by breaking open the back doors"[3] but nine were killed.[4]

References

External links