Connecticut Route 11

Route 11 marker

Route 11
ConnDOT Employees Memorial Highway
Route information
Maintained by ConnDOT
Length: 17.24 mi (27.75 km)
Existed: 1972 (reconstruction in the late 2020s) – present
Major junctions
South end: I95 in East Lyme (proposed)
Route 82 in Salem
North end: Route 2 in Colchester
Location
Counties: New London
Highway system
Route 10Route 12

Route 11 is a state highway in east-central Connecticut, serving traffic between the Hartford and New London areas (which also use Route 2). Route 11 originally was planned to be a freeway/expressway, running northwest-to-southeast, from Colchester to Waterford. However, only about half of the freeway was constructed; one end is in Salem. The delays, and eventual effective cancellation of the project in 2009, were due to funding and environmental issues; However, more recently, there has been a push to complete the expressway. This would be done by installing tolls on Route 11 to make up for the expenses.[1]

Route 11 is also known as the ConnDOT Employees Memorial Highway'.[2]

History

An expressway connecting Route 2 in Colchester and the Connecticut Turnpike in New London had been planned as far back as the 1950s. It was originally designated the Route 85 Expressway. Construction began in 1966 but was halted due to lack of funding. The half-finished expressway opened in 1972 as Route 11.[3]

Plans to finish Route 11 were revived in the late 1990s due to increased traffic in the area (primarily due to Foxwoods Resort Casino and Mohegan Sun). Contrary to local opposition to new highways, most of the residents of the area were in favor of completing the highway. Subsequently, Route 11 was submitted to the U.S. Department of Transportation for inclusion on the federal government's "fast-track" streamlining process, designed for federal agencies to quickly complete necessary steps on stalled projects, and was approved in August 2004. Funding for Route 11 has also been included in the proposed 2006 Connecticut state transportation bill. The State of Connecticut purchased, and still owns, the right-of-way for the project in Salem.

Route description

Route 11's southern terminus is the interchange with Route 82 (Exit 4) in the town of Salem. When eventually completed, Route 11's southern terminus will end at Interstate 95 and Interstate 395 in the town of East Lyme. It proceeds northward, soon crossing the Eightmile River. The road continues about 2.3 miles (3.7 km) crossing over Witch Meadow Road (Exit 5) at a diamond interchange, which leads to Salem center. Route 11 soon crosses into the town of Colchester, then has an interchange with Lake Hayward Road (Exit 6) about 2.8 miles (4.5 km) after crossing the town line. Lake Hayward Road, an unsigned state highway known as State Road 637, provides access to eastbound Route 2, Route 85, and Route 354. Northbound Route 11 merges onto westbound Route 2 0.6 miles later.[2]

Recent developments

The Final Environmental Impact Statement for extending Route 11 was issued on October 26, 2007. The EIS was published three months behind schedule due to a dispute between CONNDOT and the consulting firm that prepared the EIS—the Macguire Group—over payment for services rendered.

Environmental and funding issues

A Record of Decision from federal officials was expected by the end of 2007,[4] but the Environmental Protection Agency had expressed concern over the environmental mitigation plan for Route 11, and expressed it still favored the Route 82/85 upgrade over extending Route 11. Because the EPA has veto power over Army Corps of Engineers permits, EPA opposition could have forced the delay or cancellation of the Route 11 extension.

In December 2007, Federal Highway Administration extended the FEIS review period through the end of January 2008 to provide the EPA with a detailed environmental mitigation plan. Additionally state and federal elected officials requested the FHWA and CONNDOT present a detailed financial management plan for activities related to the extension.

In September 2009, CONNDOT indicated that due to funding constraints, it will indefinitely suspend further work on Route 11.

Proposed tolling

In 2011, Governor Dan Malloy indicated that completing Route 11 to the I-95/I-395 interchange was a high priority for the state and ordered CONNDOT to resume environmental and funding studies. In August 2011, CONNDOT initiated a financial study that focuses on building the Route 11 extension as a toll road, which could potentially accelerate construction of the extension by using a combination of funds from tolls and traditional state and federal highway funds.[5]

Route 11 greenway design

The final section of Route 11 was proposed to be built not to Interstate highway standards. While it would have been built as a fully controlled-access freeway, it would not have met Interstate standards due to two key design features: First, opposing lanes of traffic would have been separated by a concrete Jersey barrier versus the wide median on the existing Route 11 section. Secondly, the greenway was being planned to have curve radii that would have been tighter than what is allowed by Interstate standards, although it would have still had a design speed of 70 mph (110 km/h). With these two features, Route 11 would have been built using a footprint that is less than half the size required for an expressway built to Interstate standards.

The Route 11 Greenway Authority was created by the state legislature in 2000 as a committee designated with the responsibility of purchasing land on either side of the completed Route 11 to be preserved as hiking and biking trails and open space. As of 2010, the Authority still holds monthly meetings and the funds from the State of Connecticut still exist to purchase land for the Greenway, despite the near certainty the expressway itself will never be completed. The Authority does not have the power of eminent domain. The cross-section profile for the Route 11 Greenway would have been similar to that of the Route 8 expressway through the Naugatuck State Forest between Beacon Falls and Naugatuck.

Unused bridges, roadbed, and ramps

The northernmost mile (1.6 km) of Route 11 would have been built more to Interstate standards as it transitions between the Greenway profile and the profile of the existing segment at Exit 4 in Salem. When Route 11 opened to its present-day terminus at Route 82, crews had cleared and graded the roadbed for about a mile beyond Route 82 for the anticipated extension south. The "ghost ramps" built during the 1970s for a southward extension of Route 11 at Route 82 would have been paved as the new roadway was built. The Greenway would have used two rock cuts and a pair of unused bridges over Route 82, just south of the present Route 11 terminus. The bridges and rock cuts were left behind when work stopped on Route 11 in 1972.

An interchange with Interstate 95 and 395 was also planned to be built as part of the highway extension, and accounted for about half of the $1 billion cost of the project.

Reconstructing plans

ConnDOT is going to make decisions and plans to reconstruct Route 11 throughout New London County to build a concrete median in the center of the section, and to put up traffic cameras, mileage signs/upcoming exits, lightposts, guard rails, message signs, road merges, cable barriers and road sign gantries. The intersection of Route 2 (Exits 7 E-W) is going to use a Semi-directional T interchange at the ending terminus of Route 11 in Colchester, Route 82 (Exit 4) will use a Single-point urban interchange in Salem and Route 161 (Exit 3) will use a Partial cloverleaf interchange with a chain fence on the overpass in the E. Lyme town line and in E. Lyme and Salem Connecticut Route 11 is going to use specific service signs for exits 5 (Witch Meadow Rd.), 4 (CT 82) and 3 (CT 161), at the ending sections of Interstates 95 (Exits 1 N-S) and 395 (Exit 2) it can use a multi-stack interchange with flyover ramps that has left and right exits after Connecticut Route 11 ends, the exits off Route 11 is going to use fitch water barriers, gore points and quadguards. Plus, a Connecticut Adopt a Highway sign for advertisements.

Route 11 will use a partial diamond interchange for Lake Hayward Rd. (Exit 6) with an "Exit only" sign and arrows on the northbound side. It will have an exit ramp on the northbound and a merge ramp on the southbound.

Exit list

The entire route is in New London County.

LocationmikmExitDestinationsNotes
East Lyme7.4211.941 I95 New London, New HavenProposed multi-stack interchange
8.1913.182 I395 north NorwichProposed multi-stack interchange
9.5615.393 Route 161 – Chesterfield, FlandersProposed partial cloverleaf interchange
Salem10.1216.294 Route 82 Salem, HadlymeCurrent southern terminus, proposed single point interchange
12.0819.44Bridge over the Eightmile River
13.0921.075Witch Meadow Road  Salem
Colchester14.0122.556 To Route 2 / Route 85 / Route 354 (Lake Hayward Rd.) Norwich, ColchesterNo northbound entrance
17.2427.757 Route 2 west HartfordSemi-directional T interchange proposed to allow access to Route 2 east
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

Route map: Bing

External links

Wikimedia Commons has media related to Connecticut Route 11.