Chesapeake Beach Railway

Chesapeake Beach Railway

Map of the Chesapeake Beach Railway in 1913
Locale Washington, DC to Chesapeake Beach, Maryland
Dates of operation December 5, 1898April 15, 1935
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge
Headquarters Denver, Colorado

The Chesapeake Beach Railway (CBR), now defunct, was an American railroad of southern Maryland and Washington, DC built in the 19th century. The CBR ran 27.629 miles from Washington, D.C. on tracks formerly owned by the Southern Maryland Railroad and then on its own single track through Maryland farm country to a resort at Chesapeake Beach.[1] It was built by Otto Mears, a Colorado railroad builder, who planned a shoreline resort with railroad service from Washington and Baltimore. It served Washington and Chesapeake Beach for almost 35 years, but the Great Depression and the rise of the automobile marked the end of the CBR. The last train left the station on April 15, 1935. Parts of the right-of-way are now used for roads and a future rail trail.

History

Origins

In 1891, Baltimore lawyer (and later Maryland governor) Edwin Warfield and others organized the Washington & Chesapeake Beach Railway to connect Washington, DC with 3,000 acres (12 km²) of virgin bay front property at Fishing Creek where they would build a resort. Their Chesapeake Beach, Maryland, resort was to be a vacation spot for the rich and middle class alike, with two grand hotels, a boardwalk, racetrack, and amusements. A pier would accommodate Chesapeake Bay excursion steamers from Baltimore, Annapolis, and Eastern Shore points.[2] In 1894 the W&CBR was granted a charter to incorporate the Town of Chesapeake Beach. The grand schemes of the W&CBR were never to be implemented, however and the railway was placed in receivership in 1895.[3]

A new company, the Chesapeake Beach Railway Company, took up the idea in 1896. In 1897 Otto Mears was placed in control of the company. He started construction in October 1897 and on April 7, 1898 the Chesapeake Beach Railway was given the franchise of the W&CBR.[2] Mears optimistically anticipated that the railroad would be completed by July 1898. Before it could open, a draw span bridge over the Patuxent River would have to be built below Bristol. The Patuxent River being navigable as far north as Bristol had to be left unencumbered to steamboat traffic. Plans had to be approved by the US Army Corps of Engineers. A contract to construct the bridge was awarded to the Youngstown Bridge Company and after numerous delays, the bridge was fully operational as of May 1899.

The CBR entered into successful agreements with the B&O Railroad to extend service from their Hyattsville station to Upper Marlboro and on December 5, 1898 the line from Hyattsville to Upper Marlboro was officially opened. By 1899 the line was completed all the way to Chesapeake Beach, but the hotel was not ready, so the eastern leg of the railroad did not open until June 9, 1900.[3]

Operations

The line left the District of Columbia at Chesapeake Junction, where Minnesota Avenue NE and Nannie Helen Burroughs Avenue NE meet in the Deanwood neighborhood, where it met with the Pennsylvania Railroad. Then it traveled out of the District on the abandoned right-of-way of the Southern Maryland Railroad. It exited D.C. at Seat Pleasant, where it met with the Washington, Baltimore and Annapolis Electric Railway at a stop called District Line. From there, it went through Upper Marlboro, passing over the PRR (Pope creek branch), and then on to Chesapeake Beach.

In the early years, the fare for the round trip train ride from District Line station to Chesapeake Beach was 50 cents. Express trains took about 60 minutes to make the trip; “locals” took about 90 minutes.[4]

Southern Maryland Railroad

The CBR had taken possession of the Southern Maryland Railroad's railbed in Washington, DC in 1898. The SMR emerged from bankruptcy in 1901 as the Washington, Potomac & Chesapeake Railway and sued the CBR in 1902, claiming they still owned the railbed. The WP&CR won the case serving as another setback for the CBR.[5]

End of the line

The railroad was never financially successful and never paid off any interest on its original one million dollar mortgage. Starting in 1921, with the construction of highways throughout the territory, revenues began to decrease. The destruction of the luxurious Belvedere Hotel by a fire on March 30, 1923 further limited business. In 1929, under new management, an attempt to rehabilitate the line was made and operations continued with the hope that a new ferry across the Chesapeake Bay to a point on Trippe's Bay in Dorchester County would drive new business. The ferry was blocked by the Claiborne-Annapolis Ferry Company, a competing ferry out of Annapolis[6] and in 1935, management decided to replace the railroad with a bus line. The last train left the station on April 15, 1935.

A small, 2-mile, portion of the track continued as the East Washington Railway.

Stations on the line

  • Pennsylvania Junction
  • Mt. Calvert
  • Pindell
  • Lyons Creek
  • Chaney
  • Wilson
  • Owings
  • Mt. Harmony
  • Pushaw
  • Chesapeake Beach

Surviving landmarks

Destroyed landmarks

Notes

References

External links