Chaika gas field
Chaika | |
---|---|
Country | Bulgaria |
Region | Black Sea |
Block | Galata |
Offshore/onshore | offshore |
Operator | PetroCeltic |
Field history | |
Discovery | 2013 |
Start of production | 2018 |
Production | |
Current production of gas |
1.12×10 6 m3/d 40×10 6 cu ft/d 0.4×10 9 m3/a (14×10 9 cu ft/a) |
Estimated gas in place |
2.3×10 9 m3 80×10 9 cu ft |
The Chaika gas field natural gas field located on the continental shelf of the Black Sea. It was discovered in 2013 and developed by PetroCeltic. It will begin production in 2018 and will produce natural gas and condensates. The total proven reserves of the Chaika gas field are around 80 billion cubic feet (2.3 km³), and production is slated to be around 40 million cubic feet/day (0,56×106m³) in 2018.[1]
References
- ↑ "Melrose Acquires 3D Data in Western Black Sea". subseaiq.com. 2014-04-03. Retrieved 2014-04-23.