Bunji Dam
Bunji Dam |
---|
Official name |
Bunji Hydro-power Project |
---|
Country |
Pakistan |
---|
Location |
Gilgit Baltistan |
---|
Status |
Design stage |
---|
Construction cost |
Base cost: US$ 6838 million |
---|
Owner(s) |
Water And Power Development Authority (WAPDA) |
---|
Dam and spillways |
---|
Type of dam |
Gravity RCC |
---|
Height |
190 m |
---|
Spillway capacity |
1900 m3/s |
---|
Reservoir |
---|
Creates |
Indus River |
---|
Power station |
---|
Hydraulic head |
428 m |
---|
Turbines |
20 Francis type |
---|
Installed capacity |
7100 MW |
---|
Annual generation |
24088 GWh |
---|
Bunji Dam or Rondu Bunji Dam or Haramosh Bunji Dam is proposed large hydro-power project on Indus River in Gilgit Baltistan, Pakistan.[1]
The feasibility study of the project was carried out by joint consultant firms Artelia of France & Mott MacDonald of UK. The Gravity RCC dam will be 190 m high and will have an installed capacity of 7100 MW.[2] In 2009, Pakistan and China signed a MoU for the construction of Bunji Dam. The accord was signed between Ministry of Water and Power, Pakistan and Three Gorges Project Corporation, China.[3]