British Rail Class 700
British Rail Class 700 | |
---|---|
Full size mock up of the class 700 at ExCeL. | |
Class 700 mock up interior | |
In service | Due to enter service in 2016–2018[1] |
Manufacturer | Siemens[2] |
Built at | Krefeld, Germany[2] |
Family name | Desiro[2] |
Number under construction | 115 units (1140 vehicles) to be built[3] |
Formation |
60x 8-carriage (700/0)[3] 55x 12-carriage (700/1)[3] |
Fleet numbers |
700001 to 700060 (8 car)[3] 700101 to 700155 (12 car)[3] |
Capacity |
427 seats, 719 standing (8 car)[3] 666 seats, 1,088 standing (12 car)[3] |
Operator | Thameslink |
Depot(s) | Hornsey, Three Bridges[2] |
Specifications | |
Train length |
162.0 m (531.5 ft) (8 car) 242.6 m (796 ft) (12 car) |
Car length | approx 20 m |
Width | 2.80 m (9 ft 2 in) |
Floor height | 1.10 m (3 ft 7 in) |
Wheel diameter | 820 to 760 mm (32 to 30 in) (new/worn) |
Maximum speed | 100 mph (160 km/h) |
Weight |
278 t (274 long tons; 306 short tons) (8 car) 410 t (400 long tons; 450 short tons) (12 car) |
Power output |
3.3 MW (4,400 hp) (8 car, at wheel) 5.0 MW (6,700 hp) (12 car, at wheel) |
Electric system(s) |
25 kV AC Catenary 750 V DC Third rail |
UIC classification |
8 car: Bo'Bo'+2'2'+Bo'Bo'+2'2'+2'2'+Bo'Bo'+2'2'+Bo'Bo' 12 car: Bo'Bo'+2'2'+Bo'Bo'+Bo'Bo'+2'2'+2'2'+ 2'2'+2'2'+Bo'Bo'+Bo'Bo'+2'2'+Bo'Bo' |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) (Standard Gauge) |
Notes | |
Sources : Desiro City data sheet Except where noted |
The Class 700 is a class of electric multiple unit procured by the Department for Transport under the Thameslink rolling stock programme for use on expanded Thameslink, Southern & Great Northern franchise in the United Kingdom.
In 2011 the consortium Cross London Trains (XLT) consisting of Siemens Project Ventures, 3i Infrastructure and Innisfree was announced as preferred bidder with Siemens to manufacture the trains. The decision was politically controversial as the competing consortium led by Bombardier Transportation had a train factory in the UK. Both the procurement process and final close of contract were significantly delayed, resulting in the expected first delivery date moving from 2012 to 2016. The £1.6 billion contract to manufacture and provide service depots for the trains was finalised in June 2013.
A fleet of 60 eight and 55 twelve carriage trains are expected to enter service between 2016 and 2018. Associated rolling stock depots are being constructed at Hornsey and Three Bridges.
History
Background and specifications
The Department for Transport began its procurement process on 9 April 2008, with the aim of introducing more passenger capacity on Thameslink lines to match expected demand. In addition, the bidders were to provide depots for vehicle maintenance and storage, and finance for the rolling stock project whereby revenues would be generated from the long-term leasing of rolling stock to the operating Train Operating Company and associated maintenance payments.[4]
The general specifications for the rolling stock included: high reliability, short station dwell times, integrated information technology including passenger information and information for vehicle maintenance, a top speed of 100 miles per hour (160 km/h) and good acceleration and deceleration performance in line with a high frequency timetable.[note 1] Additionally the trains were to be designed for low weight and low track forces and high energy efficiency. A standard length train was to be about 240 metres (790 ft) long, with some services using trains limited to 162 metres (531 ft).[4]
The passenger accommodation was to include solutions for both "metro" and "commuter" version,[note 2] based around a 2+2 seating arrangement, with fold up seats and designed for high levels of standing passengers.[4] Ride quality and noise levels and were expected to meet or exceed current vehicles. Climate control (air conditioning) was to be fitted.[6] The vehicles were to be fitted for Driver only operation, and included GSM-R communications radio, as well as AWS, TPWS and ERTMS level 2 safety systems. The ability to be used in a "driverless" mode automatic train operation was also specified.[6]
Vehicles were to operate on 750 V DC and 25 kV AC electrification systems, and be able to brake using regenerative braking, maintenance time was to be reduced by modular components, remote diagnostics, and avoidance of overly complicated systems.[6] The Department of Transport gave a target of 384 tonnes (378 long tons; 423 short tons) when empty for a 243 m (797 ft) train.[6]
Bids
In July 2008 the Department of Transport shortlisted consortia including Alstom, Bombardier, Hitachi and Siemens as train builders.[7] The Invitations to Tender were issued to the four bidders in November 2008.[5]
Hitachi exited the bidding process in April 2009.[8]
In July 2009 Siemens unveiled the Desiro City, a development of design and technology used in its British Desiro range and the Desiro Mainline range.[9] Development of the design began in 2007, with an investment of about £45 million.[2][10]
In September 2009 Alstom unveiled the "X'trapolis UK" – an unusually articulated vehicle using 15.6 metres (51 ft) cars, with individual carriages proposed to be supported at one end by a bogie, and at the opposite end by a linkage to the next carriage. The shorter vehicle allowed a slightly wider design; the lower number of bogies was to have resulted in a train approximately 40 tonnes lighter than a conventional design.[11] However, the design would also have resulted in a higher axleload. The bid was rejected in October 2009.[12]
Bombardier Transportation offered the Aventra, a design incorporating a development of the FLEXX Eco inside frame bogie with bogie mounted traction motors.[13]
Both Bombardier's and Siemens' rolling stock designs were conventional EMUs incorporating inside frame bogies, and modern passenger and rolling stock information systems.[2][9][10][13]
Contract decision and financial close
The contract for order was originally planned to be signed in Summer 2009, with the vehicles in service by February 2012, and a full service by 2015.[4] The award of the contract was delayed by the 2010 general election,[14] and the subsequent spending review, following which the procurement was announced to be proceeding in late 2010.[15]
On 16 June 2011, Cross London Trains Ltd., a consortium formed by Siemens Project Ventures GmbH, Innisfree Ltd., and 3i Infrastructure Ltd. was named preferred bidder for the PFI contract, with the targeted entry of trains into service rescheduled to 2015–2018. Manufacturing of the vehicles would take place at Siemens' plant in Krefeld, Germany, whilst maintenance depots were to be constructed at Hornsey (London) and Three Bridges (Sussex).[2] As a result of train construction taking place outside of the UK, the decision to seek to award the contract to Siemens proved controversial, with widespread criticism of the UK government's bidding process and lack of weighting in favour of native manufacturing,[16] which in turn led to a review of governmental procurement mechanisms.[17]
The contract was significantly delayed: initially Siemens had hoped to reach agreement in early 2012;[18] by late 2011 commercial close was hoped for by the end of the year, and financial close in early 2013.[19] Key aspects of the commercial contract were reported to have been finalised by December 2012.[20]
As a result of the delays to the procurement, in late 2012 train operating company Southern began procurement of 116 new dual voltage EMUs from Bombardier that would be used temporarily on the Thameslink route until 2015; the order contract was finalised in July 2013[20][21][22][23] In mid 2013 the National Audit Office reported that the contract delay could potentially negatively impact the delivery of the entire Thameslink Programme.[24]
The £1.6 billion contract to finance, supply and maintain a 1,140 carriage fleet of passenger rolling stock was finalised between the DfT, the supplier Siemens and the Cross London Trains consortium on 14 June 2013.[25][26][27]
To finance the work loans were arranged with 19 banks, with Lloyds, Sumitomo Mitsui Banking Corporation, KfW and BTMU acting as mandated lead arrangers; the European Investment Bank also provided a debt facility. Loans for the construction of the rolling stock depots were through Siemens Financial Services.[28]
In 2014 the National Audit Office reported on the handling of Intercity Express and Thameslink rolling stock procurement projects by the Department for Transport. The report questioned the DfT's attempt to take leadership in the project, contradictory to general policy, without any prior experience of large scale rolling stock procurement; the NAO also stated their opinion that the DfT had handled communications with bidders poorly, increasing the likelihood of a legal challenge to their decisions.[29][30]
Manufacture, design and introduction
A mockup of the train was unveiled at the ExCel centre in January 2014, and then displayed at various stations in London, and surrounding area.[31][32]
- SF7000 bogie
Development of a new bogie type began in 2007; the design was intended specifically for the UK market as a replacement for the SF5000 bogie. To reduce energy consumption and track access charges a key feature of the design was reduced weight – weight saving design elements included short wheelbase, inboard frames, a bolsterless bogie design, and hollow axles. Total bogie weight is 6.3 tonnes (powered) and 4.4 tonnes (trailer), a reduction of around one third from the SF5000 design.[33][34] The decision to procure a train with a new bogie design untested in the UK was challenged by several observers at an parliamentary investigation into the train procurement – rival bidder Bombardier already had a proven low weight bogie.[35]
The primary suspension system uses layered rubber, with pneumatic secondary suspension. The bogie wheel base is 2,200 mm (87 in) (motor bogie) with 820 mm (32 in) wheels. Braking is by tread brakes, and regenerative braking on power bogies, and by two axle mounted disc brakes per axle on trailer bogies.[33][36]
Prototypes of the new SF-7000 bogie were completed at Siemens' bogie plant in Graz, Austria in late 2011.[37]
Fleet details
The new rolling stock was given the TOPS' code 'Class 700' in 2013.[3] This was divided into Class 700/0 for eight-car units, and Class 700/1 for twelve-car units.[20][38]
In July 2013 Eversholt Rail entered into an agreement with Cross London Trains to provide long term (22-year) asset management for the fleet of trains.[39]
There will be 60 eight-car units, numbered 700 001-700 060; and 55 twelve-car units, numbered 700 101-700 155.[40] Each set is to be a fixed length continuously gangwayed vehicle.[3] The initial livery will be "light grey with pastel blue doors and a white diagonal flash at the carriage ends".[3] The formation of Class 700/0 units unit will be DMCO-PTSO-MSO-TSO-TSO-MSO-PTSO-DMCO, and that of Class 700/1 units will be DMCO-PTSO-MSO-MSO-TSO-TSO-TSO-TSO-MSO-MSO-PTSO-DMCO.[41] The individual vehicles in each unit will have six-digit numbers: eight-car unit 700 001 will be formed 401001-402001-403001-406001-407001-410001-411001-412001; and twelve-car unit 700 101 will be formed 401101-402101-403101-404101-405101-406101-407101-408101-409101-410101-411101-412101.[38]
A completed unit was presented by Siemens in Krefeld, Germany in April 2015.[42]
Trains are expected to enter service in 2016, with full deployment by 2018.[1]
Depots
In 2008 the Department of Transport commissioned a study into the location of depots for the future Thameslink rolling stock: Network Rail preferred two depots based on an expectation that at times the central area of the Thameslink route would be closed for maintenance outside commercial operational hours, with no workable alternative electrified routes available; as a result depots on either side of the central Thameslink area were required allowing trains to be able to reach a depot on a nightly basis without passing through central London. A single depot solution was also investigated, but no suitably large sites were identified for such a facility.[43]
Sites were considered at: Wellingborough (including sidings used by GB Railfreight); Hornsey (adjacent to the existing Hornsey EMU depot then operated by First Capital Connect); Cricklewood (on development land associated with the planned Brent Cross Thameslink railway station); Selhurst (on the site of the existing Selhurst Depot used by Southern); Three Bridges (a split site on either side of the main line), and at Tonbridge.[44] By late 2008 the sites had been narrowed to Hornsey, Three Bridges and Tonbridge; finally Hornsey and Three Bridges were selected as a two depot solution.[45]
In late 2009 the Hornsey depot was refused permission for on grounds of its scale damaging a local conservation area.[46] In 2011 revised plans were submitted for both the Hornsey and Three Bridges schemes, with the Hornsey scheme reduced in size, and the Three bridges scheme expanded;[47] the Three Bridges depot was to be located on either side of the London to Brighton main line, with a five road carriage shed; the Hornsey depot, to be located next to the East Coast main line, was to have a three road carriage shed; the depots were expected to be opened in 2015, and 2016 respectively.[1]
In mid 2013 Volker Fitzpatrick was awarded the approximately £150 million contract to build the two depots.[48][49]
Three Bridges
51°06′44″N 0°09′42″W / 51.1122°N 0.1616°W
In 2009 Arup acting on behalf of Network Rail submitted a planning application for a rolling stock depot south of Three Bridges railway station, with facilities on either side of the Brighton Main Line.[50][note 3] The development was on a 13 ha (32 acres) site owned by on Network Rail 1.5 km south of Three Bridges railway station.
The development site was on land historically used for railway use;[note 4] unbuilt on prior to railway developments; by 1910 sidings had been built east of the London, Brighton and South Coast Railway (Brighton Main Line), as well as an engine shed and turntable adjacent west of the site;[53] In 2008 the western development area comprised underutilised sidings and hardstanding with the site east of the mainline including operation sidings, as well as offices; tenants included EWS, BAM Nuttall, Colas Rail and Balfour Beatty.[54][55] The western side of the proposed development included a single ended 280 by 23 m (919 by 75 ft) three road maintenance shed, 13 m (43 ft) high, a wheel lathe, electricity substation, and sidings for eight 12-car trains; the eastern side included stabling for four 12-car trains, and an underframe cleaning facility; both sides of the development were to have separate 325 m2 (3,500 sq ft) train washing facilities, waste storage, and controlled emission toilet (CET) facilities. Site offices and warehousing were to be in a 2,857 m2 (30,750 sq ft) three-story building northwest of the main shed.[56][57][58]
Planning permission for the development was granted in November 2009,[59] however in December the associated Hornsey depot application was blocked by the Secretary of State for Communities and Local Government; Network Rail submitted revised plans for both sites in 2011, with a smaller Hornsey scheme and an expanded Three Bridges scheme.[47] In the same period as the new application, Network Rail submitted plans for a large railway operations and signalling centre to be built adjacent to the Three Bridges depot.[60] (see Three Bridges rail operating centre).
The revised plans added additional carriage stabling on the EWS/DB Schenker freight depot to the west of the original site;[61][62][note 5] with stabling for five 8-car trains, and with CET facilities – and total stabling on the western site was increased to eleven 8-car trains. Additional major changes included expansion of the main depot to a 5 road building, 40 m (130 ft) wide; stabling on the eastern site was increased by one to five 8-car trains; and additional office and accommodation space was specified.[64]
Hornsey
51°35′29″N 0°06′51″W / 51.5914°N 0.1142°W
Network Rail submitted a planning application in August 2009;[65] the development was split across sites east of the main railway line: the main maintenance building was north of Hornsey railway station and the A504 road (High Street/Turnpike Lane); storage sidings were located south-east of Hornsey station, adjacent to the pre-existing Hornsey EMU depot.[66]
The northern site was on rail sidings ('Coronation sidings'/'Hornsey sidings') which had been developed on made embankments from the later 19th century to early 20th century, the southern stabling area was on land that had been extensively developed as railway sidings since the early 20th century.[67][68][69]
The proposed development required bridge widening of the crossing of Turnpike lane, and additional embankment work and extensions.[70] The main maintenance building was a six road 40 by 280 m (130 by 920 ft), 13.4 m (44 ft) high single ended train shed, with an adjacent train wash (west) and a two-story 12 by 117 m (39 by 384 ft) warehouse adjacent to the east.[71] The southern site was included sidings for eleven 12-car trains, and two 8-car trains, with cleaning and controlled emission toilet (CET) facilities.[72]
In 2009 John Denham, Secretary of State for Communities and Local Government blocked the development of the depot – the development had been subject to local and council objections on grounds including negative impact to a conservation area, as well as a potential negative impact to Haringey Council's "Haringey Heartlands" redevelopment project.[46][73]
A revised two depot plan was produced, the southern (Three Bridges) depot was expanded to a five road shed, whilst as estimates for total maintenance roads required had been reduced from nine to eight; the northern depot was required to be only a three road depot; the depot was to be suitable for 12-car trains, with wheel lathe, cleaning, warehousing and stabling facilities. Potential sites for the northern depot were re-assessed and possible options reduced to three: a main depot at Coronation Sidings Hornsey; a main depot adjacent to the existing depot at Hornsey, and a site at Chesterton, Cambridge – a depot reduced in size on the site of the original plan was chosen as the best option for Network Rail.[74] The revised plan was submitted in 2011, with the main depot reduced approximately 2 m (6 ft 7 in) in height, and nearly half the area, and with estimated employment figures reduced from 270 to 120 people.[47] Rail union RMT criticised the loss of employment opportunities due to the reduced scale of the plans,[75][76] stating "Without anyone trying, Haringey has lost 150 jobs";[77] the revised scheme continued to produce significant opposition from local residents, with concerns including noise and light pollution during night working, as well as visual impact and traffic.[76][78]
The main depot was a 278 by 21.6 m (912 by 71 ft) three road 11.3 m (37 ft) high single ended shed, with a two-storey 182 by 12 m (597 by 39 ft) warehouse adjacent east, and a 50.6 by 6.5 m (166 by 21 ft) train washing building adjacent west; facilities at the depot were to included equipment for heavy overhaul including overhead synchrononsied lift cranes on one road. The southern site, adjacent the pre-existing First Capital Connect (FCC) EMU depot would include CET facilities, another 50.6 by 6.5 m (166 by 21 ft) train washing building, a 260 by 7 m (853 by 23 ft) underfloor cleaning building, and shunter's cabins. Wheel lathe facilities were to be shared with a pre-existing installation at the FCC depot. Existing sidings adjacent to the FCC depot were to be rebuilt to provide 16 roads – 4 arrival and departure roads, and 12 storage roads. Civil engineering work included bridge widening across Turnpike Lane (A51) and a culverted waterway, as well as minor embankment works, and rebuilding of a footbridge at Hornsey station.[79][80][81]
The plan was given permission in late 2011.[82]
See also
- British Rail Class 345 – contemporary rolling stock procured from Bombardier Transportation for the Crossrail programme, to a broadly similar specification.[5][83]
- First Capital Connect, holder of the Thameslink, Southern and Great Northern franchise to September 2014
- Syntegra, potential Siemens replacement bogie.[9]
Notes
- ↑ Up to 24 trains per hour in central London.[4]
- ↑ The 240 m long trains were expected to be of "outer-suburban" or "commuter" type, whilst the 162 m trains were expected to have both "metro" and 'surburban' passenger accommodation types.[5]
- ↑ The development was a 'permitted development' under Part 11 of the Town and Country Planning (General Permitted Development) Order 1995; the application still required local council approval for certain aspects of the works including the main maintenance building and bridge widening.[51]
- ↑ The site is located in the 'fork' between the 1841 London and Brighton Railway; the Arun Valley Line (built by the London Brighton and South Coast Railway (LB&SCR) 1848); and the 1855 Tunbridge Wells West Railway (see Three Bridges to Tunbridge Wells Central Line).[52]
- ↑ The new sidings required the demolition of an existing shed used for stabling of Bombardier Voyager trains.[63]
References
- ↑ 1.0 1.1 1.2 Scrimshaw, Steve (2 August 2013). "Thameslink on track". The Rail Engineer.
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 "Siemens beats Bombardier to Thameslink train order". Railway Gazette International. 16 June 2011.
- ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 "First Capital Connect and Siemens reveal further details of Thameslink train order". First Capital Connect. 8 August 2013.
- ↑ 4.0 4.1 4.2 4.3 4.4 Sources:
- "Thameslink Rolling Stock Project : Industry Day" (PDF). www.dft.gov.uk (via webarchive.nationalarchives.gov.uk). Department for Transport. 22 April 2008.
- "Thameslink Rolling Stock Project : Summary and Overview" (PDF). www.dft.gov.uk (via webarchive.nationalarchives.gov.uk). Department for Transport. April 2008.
- "Thameslink EMU procurement begins". www.railwaygazette.com. Railway Gazette International. 9 April 2008.
- ↑ 5.0 5.1 5.2 "Thameslink EMU invitations to tender issued". www.railwaygazette.com. Railway Gazette International. 27 November 2008.
- ↑ 6.0 6.1 6.2 6.3 "Thameslink Rolling Stock Project : Rolling Stock High Level Specification" (PDF). www.dft.gov.uk (via webarchive.nationalarchives.gov.uk). Department for Transport. April 2008.
- ↑ "Thameslink shortlist announced". www.railwaygazette.com. Railway Gazette International. 10 July 2008.
- ↑ "Hitachi drops out of Thameslink competition". www.railwaygazette.com. Railway Gazette International. 22 April 2009.
- ↑ 9.0 9.1 9.2 "Siemens offers Desiro City to the UK market". www.railwaygazette.com. Railway Gazette International. 17 July 2009.
- ↑ 10.0 10.1 "Desiro City" (PDF). www.mobility.siemens.com. Siemens. Archived from the original (PDF) on 6 April 2012.
- ↑ "Alstom unveils X'trapolis UK". www.railwaygazette.com. Railway Gazette International. 16 September 2009.
- ↑ "Alstom out of Thameslink bidding". www.railwaygazette.com. Railway Gazette International. 29 October 2009.
- ↑ 13.0 13.1 Sources:
- "AVENTRA – Bombardier's flagship EMU for the UK (reproduced from Rail Engineer Magazine". www.rail.co. 23 February 2011.
- "Bombardier's AVENTRA – A new era in train performance (reproduced from Rail Engineer Magazine". www.rail.co. 21 March 2011.
Nigel Wordsworth (October 2009). "Weight loss drives step change". The Rail Engineer (60): 18–19.
- ↑ Jameson, Angela (13 May 2010). "Uncertain future for delayed Thameslink trains". The Times (London).
- ↑ "GW electrification and Thameslink fleet approved". www.railnews.co.uk. Railnews Limited. 25 November 2010.
- ↑ Sources:
- Dan Milmo (17 August 2011). "Wheel of fortune turns in Derby". The Guardian.
- "Thameslink setback could put Bombardier future at risk". BBC News (Derby). 16 June 2011.
- ↑ Sources:
- "Crossrail delay for train procurement rethink". Railnews Limited. 30 August 2011.
- Dan Milmo (29 August 2011). "Crossrail delays competition for £16bn train manufacturing contract". The Guardian.
- Angeline Albert (30 August 2011). "Crossrail delays train procurement pending buying review". Supply Management.
- Adam Leach (5 July 2011). "Government aims to increase support for UK train makers". Supply Management.
- ↑ Milmo, Dan (5 August 2012). "Thameslink trains order held up, admits Siemens". The Guardian.
- ↑ "'If Siemens can't manage Thameslink, nor can Bombardier'". Rail Technology Magazine. 2 November 2012.
- ↑ 20.0 20.1 20.2 Pritchard, Robert (March 2013). "Rolling stock developments since privatisation". Today's Railways (135): 31.
- ↑ "'Key elements' agreed on Siemens Thameslink order". Railnews. 21 December 2012. Retrieved 24 February 2013.
- ↑ "Department for Transport's boost to train builders" (Press release). Department for Transport. 21 December 2012. Retrieved 24 February 2013.
- ↑ "Southern selects Bombardier to supply trains for Thameslink cascade". TheRailwayGazette.com. 21 July 2013.
- ↑ Barrow, Keith (6 June 2013). "Report warns of Thameslink delay risks". Rail Journal.
- ↑ Barrow, Keith (14 June 2013). "Thameslink train contract reaches financial close". International Railway Journal. Retrieved 9 August 2013.
- ↑ "Department for Transport and Siemens seal Thameslink deal" (PDF) (Press release). Siemens. 27 June 2013.
- ↑ "Siemens Thameslink deal to create up to 2,000 new jobs" (Press release). Department of Transport. 27 June 2013.
- ↑ "Taking stock of Thameslink: captive finance plays a key role in Siemens’ record transport deal". European Railway Review.com. 30 August 2013.
- ↑ Report by the Comptroller and Auditor General - Department for Transport - Procuring new trains (PDF), National Audit Office, 9 July 2014, Summary: §7, 15, pp.6, 8
- ↑ Topham, Gwyn (9 July 2014), "Train contracts may not be best value, says National Audit Office", www.theguardian.com
- ↑ "New Thameslink rolling stock goes on show". Rail Technology Magazine. 28 January 2014.
- ↑ "New train roadshow". First Capital Connect. Retrieved 18 February 2014.
- ↑ 33.0 33.1 "Bogies for Thameslink". The Rail Engineer. 28 March 2012.
- ↑ Küter 2012.
- ↑ Thameslink rolling stock procurement: eleventh report of session 2010–12 (Report). 1: Report, together with formal minutes, oral and written evidence. The Stationery Office. 2011. "The bogie", pp.15–16; Ev 6, Q33; Ev 13, Q98.
- ↑ Fender, Keith (16 March 2012). "Siemens presents new lightweight bogie". International Railway Journal.
- ↑ "Siemens manufactures first Thameslink bogie" (PDF) (Press release). Siemens. 21 December 2012.
- ↑ 38.0 38.1 Pritchard & Hall 2014, pp. 336, 339.
- ↑ "Eversholt wins contract for new Siemens Thameslink trains". Modern Railways. 3 July 2013.
- ↑ Pritchard & Hall 2014, pp. 336, 339, 341.
- ↑ Pritchard & Hall 2014, p. 336.
- ↑ Fender, Keith (2 April 2014), "Thameslink EMUs to begin mainline testing in August", www.railjournal.com
- ↑ Network Rail & ARUP 2009, Planning Statement, 2.2. pp.5–6.
- ↑ Network Rail & ARUP 2009, Planning Statement, 2.2.2. pp.5–8.
- ↑ Network Rail & ARUP 2009, Planning Statement: 2.2.3–2.25, pp.8–10.
- ↑ 46.0 46.1 Pears, Elizabeth (8 December 2009). "Brakes pulled on Hornsey train depot development". Haringey Independent.
- ↑ 47.0 47.1 47.2 "Thameslink depot size halved after local objections". Transport Briefing. 25 January 2011.
- ↑ "Two depots designed for Desiro City fleet". www.railwaygazette.com. 14 August 2013.
- ↑ Morby, Aaron (11 July 2013). "VolkerFitzpatrick wins Thameslink train depots". Construction Enquirer.
- ↑ Network Rail & ARUP 2009.
- ↑ Network Rail & ARUP 2009, Planning Statement: 2.3, pp.10–14.
- ↑ Network Rail & ARUP 2009, Design and Access Statement. 3.1 p.6.
- ↑ Ordnance Survey. 1:2500. 1873–4, 1897, 1910
- ↑ Network Rail & ARUP 2009, Planning Statement ,3.1.1–3.1.3. p.14.
- ↑ Network Rail & ARUP 2009, Environmental Statement (non-technical summary). 3. p.5.
- ↑ Network Rail & ARUP 2009, Environmental Statement (non-technical summary). 4. p.7, fig.2 p.8.
- ↑ Network Rail & ARUP 2009, Planning statement 3.2. pp.15–19.
- ↑ Network Rail & ARUP 2009, 3BR-GX-201 Three Bridges Site Plan.
- ↑ Network Rail & ARUP 2011, Planning statement. 1. p.3.
- ↑ Network Rail & ARUP 2011, Planning statement 1.2, pp.4–5.
- ↑ Network Rail & ARUP 2011, Planning statement 3.1.2 p.16.
- ↑ Network Rail & ARUP 2011, (3BR-GX-202 07) Revised Scheme Principal Changes.
- ↑ Network Rail & ARUP 2011, Planning statement. 3.2.1, Table 1, p.19.
- ↑ Network Rail & ARUP 2011, Planning statement 3.2 pp.18–38.
- ↑ Network Rail & ARUP 2009a.
- ↑ Network Rail & ARUP 2009a, Drawing 240809_22 Hornsey Site Plan, 1:1000, 207670-00 HOR-GX-201.
- ↑ Ordnance Survey. 1:2500. 1863, 1896, 1914, 1935
- ↑ Network Rail & ARUP 2009a, Cultural Heritage Baseline Information (Appendix D.) D7-D10.
- ↑ Network Rail & ARUP 2009a, Environmental Statement (REP-PL-HOR-0005). 3.1, p.12.
- ↑ Network Rail & ARUP 2009a, Environmental Statement (REP-PL-HOR-0005). 4.1, p.15; 4.10, p.17.
- ↑ Network Rail & ARUP 2009a, Environmental Statement (REP-PL-HOR-0005). 4.2–4.7, pp.15–17.
- ↑ Network Rail & ARUP 2009a, Environmental Statement (REP-PL-HOR-0005). 4.8–4.9, p.17.
- ↑ "Rail depot plans thrown out". Hampstead & Highgate Express. 10 December 2009.
- ↑ Network Rail & ARUP 2011a, (REP-PL-HOR-001A) Planning Statement (Part C) Northern Depot Site Assessment Study.
- ↑ Moore, Stephen (31 March 2011). "New train depot plans for Hornsey to go under the spotlight". London24.
- ↑ 76.0 76.1 Hardiman, David (20 April 2011). "New Hornsey train depot bid hit by fresh concerns". Haringey Independent.
- ↑ "New Train depot plans for Hornsey (Heartlands)". Harringay Online. 4 April 2011.
- ↑ Jestico, Daisy (13 May 2011). "Neighbours' worries 'ignored' in row over Hornsey rail depot". Tottenham & Wood Green Journal.
- ↑ Network Rail & ARUP 2011a, Planning Statement (REP-PL-HOR-001A) 4-4.2.10 The Proposed Scheme, pp.14–20.
- ↑ Network Rail & ARUP 2011a, HOR-GX-201 Hornsey Site Plan.
- ↑ Network Rail & ARUP 2011a, HOR-GX-202 Hornsey Revised Scheme – Principle Changes.
- ↑ Jestico, Daisy (14 September 2011). "Hornsey train depot given the green light after two-year battle". Tottenham & Wood Green Journal.
- ↑ "Rolling Stock Plant". www2.dft.gov.uk. Department for Transport. Retrieved 11 July 2011.
It is likely that these vehicles will also meet the aspirations for the next generation of EMUs and may be similar, but probably not identical, to those proposed for the Thameslink Programme.
Sources
- "Desiro City – Electrical Multiple Unit for Thameslink" (PDF) (Datasheet). Siemens. 2013. Archived from the original on 12 November 2013. Retrieved 12 November 2013.
- Network Rail; ARUP (20 August 2009), (CR/2009/0371/CON) ERECTION OF MAINTENANCE DEPOT AND SERVICING FACILITIES, Crawley Borough Council
- Network Rail; ARUP (21 February 2011), (CR/2011/0093/FUL) CONSTRUCTION OF ROLLING STOCK MAINTENANCE DEPOT & ASSOCIATED WORKS ..., Crawley Borough Council
- Network Rail; ARUP (24 August 2009), (HGY/2009/1450) Submission for Prior Approval as Permitted development for the erection of maintenance depot (280m long, 40m wide, 13.5m high) for Thameslink Trains, ..., Haringey Council
- Network Rail; ARUP (1 April 2011), (HGY/2011/0612) Construction of rolling stock maintenance depot and associated works ..., Haringey Council
- Küter, Christian (2012), "Design to Value – die Entwicklung des Drehgestells SF 7000", ZEVrail (Glasers Annalen) (in German) 136 (11-12): 420–426
- Pritchard, Robert; Hall, Peter (2014). British Railways Locomotives & Coaching Stock 2014. Sheffield: Platform 5 Publishing. ISBN 978-1-909431-09-6.
Further reading
- Hirtenlechner, Johannes; Brandstetter, Jochen (7–10 April 2013), "SF 7000 das innovative Fahrwerkskonzept als Antwort auf Whole Life Cost Modelle" (PDF), Tagung Moderne Schienenfahrzeuge (in German) (Siemens)
- Heaps, Chris (January 2014), "Thameslink bogies start rolling out", Railway Gazette International 170 (1): 44
External links
Wikimedia Commons has media related to British Rail Class 700. |
- "Thameslink Rolling Stock Project". National Archive. Department for Transport. Archived from the original on 3 January 2009.
- "Desiro City– Evolution in motion". Siemens.
- Desiro City – Coming soon on YouTube
|
|