Bratilë Hydro Power Plant
Bratilë Hydro Power Plant |
---|
Country |
Albania |
---|
Location |
Bratilë |
---|
Status |
Proposed |
---|
Construction cost |
US$92 million |
---|
Owner(s) |
Landsvirkjun |
---|
Dam and spillways |
---|
Impounds |
Devoll River |
---|
Power station |
---|
Installed capacity |
70 MW (max. planned) |
---|
Bratilë Hydro Power Plant is a proposed large power plant on the Devoll River situated in Albania.
The project consists of a large power plant with a nominal capacity of 70 MW[1] on the Devoll River operated by the Icelandic company Landsvirkjun that will invest US$92 million in the project,