Bratilë Hydro Power Plant

Bratilë Hydro Power Plant
Country Albania
Location Bratilë
Status Proposed
Construction cost US$92 million
Owner(s) Landsvirkjun
Dam and spillways
Impounds Devoll River
Power station
Installed capacity 70 MW (max. planned)

Bratilë Hydro Power Plant is a proposed large power plant on the Devoll River situated in Albania.

The project consists of a large power plant with a nominal capacity of 70 MW[1] on the Devoll River operated by the Icelandic company Landsvirkjun that will invest US$92 million in the project,

External links