Bombardier MOVIA C951

Bombardier MOVIA C951

Interior view of the C951.
In service 22 December 2013–current
Manufacturer Bombardier Transportation
Built at Changchun, China (By Changchun Railway Vehicles)
Family name Movia
Entered service 2013–
Number under construction 231 vehicles (77 sets)
Number built 33 vehicles (11 sets)
Formation 3 per trainset
Operator SBS Transit DTL
Depot(s) Changi, Gali Batu and Kim Chuan
Line(s) served Downtown Line
Specifications
Car body construction High capacity aluminium
Train length 70.1 m
Car length 23.37 m
Width 3.2 m
Height 3.68 m
Maximum speed 90km/h (Design)
80km/h (Service)
Weight 38.3 t per car
Traction system IGBT–VVVF
(Bombardier MITRAC)
Acceleration 1.1 m/s2
Deceleration 1.1 m/s2 (Normal Braking)
1.4 m/s2 (Emergency Braking)
Electric system(s) 750 V DC
Current collection method Third rail
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge

The Bombardier MOVIA C951 is a type of train built by Bombardier Transportation for use on the Downtown Line, Singapore.

History

A view of the Bombardier MOVIA C951.

73 trainsets consisting of three cars each were purchased at a cost of approximately S$570.7 million for passenger service.[1] Bombardier beat Alstom, Kawasaki Heavy Industries and Hyundai Rotem in the tendering process as the lowest cost offered.[2] An addition of 15 more trains was bought by Land Transport Authority which totalled up the number of trains to 88.[3] A partial number of the total fleet operates on the Stage 1 of Downtown Line since 22 December 2013.

Delivery

These trains are being delivered until 2016. They will be stabled at Changi Depot, Gali Batu Depot and also on Kim Chuan Depot.

On 12 October 2012, the first of 11 trains for the Downtown Line Stage 1 arrived at Jurong Port and transported to Kim Chuan Depot to undergo testing by LTA before it is handed over to SBS Transit.[4]

By 28 February 2013, Bombardier had delivered nine of the 11 trains for Downtown Line Stage 1.[3] LTA together with the operator, SBS Transit conducted the necessary tests to ensure safety standards, functional performance and systems compatibility requirements are met before revenue service of the DTL1 which began on 22 December 2013.[5]

Operation

The C951 trains are fully automated, without attendant, running on a system similar to that used on the C751A and C830.

Features

Design

The C951 trains may include several features that were not seen in existing trains.[6]

New features include:

The train will also retain existing features like having two rows of poles and hand grips, and vertical poles which split into three at the center.

Dynamic Route Map Display

The Dynamic Route Map Display (DRMD) is a rail travel information system, newly introduced and developed for the C951 trains. The dynamic route map display panels provide commuters with their journey status updates and route information. It also indicates which side the doors will open on.[7]

Platform Gap Width Reduction (PGWR)

The train doors have a frangible gap made of rubber that protrudes out. The platform-train gap will then be reduced from 75 to 40 mm, preventing passenger accidents due to the platform gap.[7]

Others

The train will have regenerative braking which is usable over a larger range of speeds. This will generate electricity when the train slows, feeding it back to the rail network.

Perch seats in the C951.

Serial number

Each cars are indicated with a five-digit serial number by the rail operator, SBS Transit which is similar to the Alstom Metropolis C751A trains. The car numbers of the trains range from 9001x to 9088x, where x depends on the carriage type.

An example for a C951 trainset running on the Downtown Line could be, Set 901 (also known as Set 9001). It will be consists of cars, 90011, 90012 and 90013.

See also

External links

References

  1. Bombardier Receives Contract from Land Transport Authority of Singapore for 219 Driverless Metro Cars Valued at Approximately 298 Million Euros
  2. Downtown train deal goes to Bombardier, Christopher Tan, The Straits Times, 8 November 2008
  3. 3.0 3.1 "Shorter Waiting Time With 15 More Trains For Downtown Line". Land Transport Authority. March 28, 2013. Retrieved March 28, 2013.
  4. "First Downtown Line train lands in Singapore". Land Transport Authority. Retrieved November 16, 2013.
  5. "Land Transport Masterplan: Downtown Line Stage 1 to open on Dec 22". The Straits Times. Retrieved 16 November 2013.
  6. Arrival Of Downtown Line Train Mock-Up
  7. 7.0 7.1 "Bombardier MOVIA C951". SGTrains.
Wikimedia Commons has media related to Bombardier MOVIA C951.