Bamford railway station
Bamford | |
---|---|
Location | |
Place | Bamford |
Local authority | High Peak |
Coordinates | 53°20′20″N 1°41′20″W / 53.3389°N 1.6890°WCoordinates: 53°20′20″N 1°41′20″W / 53.3389°N 1.6890°W |
Grid reference | SK208825 |
Operations | |
Station code | BAM |
Managed by | Northern Rail |
Number of platforms | 2 |
Live arrivals/departures, station information and onward connections from National Rail Enquiries | |
Annual rail passenger usage* | |
2004/05 | 16,618 |
2005/06 | 18,621 |
2006/07 | 19,547 |
2007/08 | 22,836 |
2008/09 | 23,836 |
2009/10 | 24,442 |
2010/11 | 25,656 |
2011/12 | 25,050 |
2012/13 | 27,044 |
2013/14 | 27,774 |
History | |
Original company | Dore and Chinley Railway |
Pre-grouping | Midland Railway |
Post-grouping | London, Midland and Scottish Railway |
25 June 1894 | Station opened |
National Rail – UK railway stations | |
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Bamford from Office of Rail Regulation statistics. Methodology may vary year on year. | |
UK Railways portal |
Bamford railway station serves the village of Bamford in the Derbyshire Peak District, in England and is owned by Northern Rail.
History
Bamford station was built by the Dore and Chinley Railway, a company which was absorbed by the Midland Railway prior to opening. The line was opened for goods traffic on 6 November 1893, and for passenger trains on 1 June 1894, but Bamford station was not opened until 25 June that year.[1][2] The Dore and Chinley line later became known as the Hope Valley Line. The station became an unstaffed halt in 1969 when the last station master purchased the Station House. The main station building was located on the road overbridge, and was removed during the late 1970s.
Derwent Branchline
During the construction of the nearby Derwent and Howden dams between 1912 and 1916, the railway carried stone from a quarry at nearby Grindleford, up a branchline to the worksite. When the dams were completed, the branchline was removed, but later re-instated in 1945 during the construction of the Ladybower Reservoir. A signalbox used to control the station and branchline, but this has since been relocated to Peak Rail. The branchline has since been removed, but there is access the old trackbed as the Thornhill Trail.
Service
All services are provided by Northern Rail except the first (to Manchester) and the last (to Nottingham) which are provided by East Midlands Trains.
Weekdays
- The typical off-peak service from the station includes a train in each direction (west to Manchester Piccadilly via New Mills Central and east to Sheffield) once every two hours. The above also operates on Bank Holidays.
Weekends
- Saturday: A train in each direction once every hour.
- Sunday: A train in each direction once every two hours.
References
- ↑ Awdry, Christopher (1990). Encyclopaedia of British Railway Companies. London: Guild Publishing. p. 71. CN 8983.
- ↑ Butt, R.V.J. (1995). The Directory of Railway Stations. Yeovil: Patrick Stephens Ltd. p. 26. ISBN 1-85260-508-1. R508.
External links
Wikimedia Commons has media related to Bamford railway station. |
- Train times and station information for Bamford railway station from National Rail
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Northern Rail | ||||
East Midlands Trains Liverpool-Norwich Limited service |