Wushoh Dam
Wushoh Dam (Chinese: 霧社水庫; pinyin: Wùshè Shuǐkù) is a concrete arch-gravity dam on the Zhuoshui River, located near Ren-ai Township in Nantou County, Taiwan. One of Taiwan's earliest major water projects, construction began in 1939 under Japanese rule, but stopped in 1944 at the end of World War II. Work on the dam resumed in 1953 and was completed in 1959. The dam is 114.6 m (376 ft) high and 205 m (673 ft) long, holding a reservoir with an original maximum capacity of 146,000,000 m3 (118,000 acre·ft) and useful capacity of 91,000,000 m3 (74,000 acre·ft).[1]
The dam serves primarily for flood control and hydroelectric power generation, with an installed capacity of 76.6 megawatts (MW).[2]
The reservoir has suffered heavily from siltation, with an estimated 36 percent of its capacity lost by 2009.[3]
See also
References
- ↑ Reservoirs and Weirs in Taiwan (in Chinese). Taiwan Water Resources Agency, Ministry of Public Affairs. p. 328.
- ↑ "萬大發電廠簡介" (in Chinese). Taiwan Power Company. Retrieved 2013-06-25.
- ↑ Tsai, Wen Po; Liao, Hui Wen; Chen, Ho Ji; Jane, Kho Chang (2012). "A Research of Reservoir Sediment Solidification Using Biotechnology". In Xu, Qunjie; Ju, Yanzhong; Ge, Honghua. Advanced Materials Research. 610–613. pp. 2761–2765. Retrieved 2013-06-25.
Coordinates: 23°58′51″N 121°08′21″E / 23.98083°N 121.13917°E