West Coast Expressway

From Wikipedia, the free encyclopedia

E-- Expressway
[[File:
West Coast Expressway (Peninsular Malaysia)
|290px|alt=]]
Route information
Maintained by West Coast Expressway (WCE) Sdn Bhd
(formerly known as Konsortium Lebuhraya Pantai Barat (KPLB) Sdn Bhd)
Length: 233.0 km (144.8 mi)
Existed: 2008 – present
History: Completion schedule for 2018
Major junctions
North end: Changkat Jering, Perak
  E1 AH2 AH2 North-South Expressway Northern Route
60 Federal route 60
5 Federal route 5
5 Ipoh-Lumut Highway
58 Federal route 58
E25 Kuala Lumpur-Kuala Selangor Expressway
20 E30 North Klang Straits Bypass
2 Federal Highway
E5 Shah Alam Expressway
E26 South Klang Valley Expressway
Jalan Banting-Dengkil
Nilai-KLIA Highway
South end: Banting, Selangor
Location
Primary
destinations:
Beruas
Ayer Tawar
Kampung Gajah
Teluk Intan
Sabak Bernam
Tanjung Karang
Kuala Selangor
Kapar
Bukit Raja
Klang
Teluk Panglima Garang
Banting
Kuala Lumpur International Airport (KLIA)
Highway system

The West Coast Expressway, WCE or (Malay: Lebuhraya Pantai Barat) (LPB), E28 is a planned expressway that will be built on the west coast of Peninsula Malaysia. It will connect Taiping, Perak to Banting in Selangor. The expressway will be built by Konsortium Lebuhraya Pantai Barat (KLPB) soon, as approval has just been given by the government for the construction to begin.

Overview

Construction of the expressway will be divided into eleven packages. Works for the first five packages will commence in April 2014 of which three packages are in Selangor while the other two in Perak. The stretch between Tanjung Karang to Hutan Melintang and Teluk Intan to Kampung Lekir will be on the existing stretch of Federal route 5 meanwhile the stretch between Parit to Siputeh will be on the existing stretch of Federal route 73 which both will be upgraded as part of the expressway. The expressway will have a closed toll system like North-South Expressway.

The highway will cost about RM 4.6 billion, where RM3.6 billion will be construction costs. The concessionaire company is planning to issue bonds in 2009. Construction has been delayed to 2009 because of changes in alignment and costing. It is expected to complete in 2012.[1]

On 12 November 2008, the project was shelved as terms of the current deal could not be finalized within a 15-month time frame. A new tender have to be open out.[2]

On 26 January 2012, Europlus Group Bhd officially obtain the MYR 7.07 billion tender to build the highway from the government. The highway will have a total length of 316 km, where 92 km will be toll free. The highway will be built on the build-operate-transfer concept with a concession period of 60 years.[3]

Route background

The Kilometer Zero of the expressway is said to be located after the border limit of E1 Changkat Jering Interchange on the North South Expressway Northern Route. However, it is yet unknown where it will be located.

Features

Notable Features


Overlaps

Alternate routes

Section with motorcycle lanes


List of Interchanges (To be finalized when information is available)

Main Link

KmExitInterchangeToRemarks
EXIT 146 CHANGKAT JERING-NSE INTERCHANGEE1 AH2 AH2 NORTH-SOUTH EXPRESSWAY NORTHERN ROUTE

NORTHWEST
E1 Bukit Kayu Hitam
E1 Alor Star
E36 George Town

SOUTHEAST
E1 Ipoh
E1 Kuala Lumpur
Trumpet interchange
Changkat Jering-NSE toll plaza
CKJ
Transit Ticket TnG TAG TAG TnG RM (Cash)
Closed toll system
Collect transit tickets and pay a distance toll

P Changkat Jering-NSE toll plaza
CKJ
West bound
E1 AH2 AH2 NORTH-SOUTH EXPRESSWAY NORTHERN ROUTE
PLUS Expressway border limit

EXIT ---- TAIPING SOUTH INTERCHANGENORTH
60 Changkat Jering
1 Taiping

SOUTH
60 Trong
Proposed diamond interchange
E-- WEST COAST EXPRESSWAY
Start/End of expressway
Under planning

E-- 233
Taiping South toll plaza
Closed toll system
Collect ticket transit and pay a distance toll

EXIT ---- TRONG INTERCHANGE60TrongProposed trumpet interchange with toll plaza
R&R Trong Rest and Service Area C* North bound
R&R Trong Rest and Service Area C* South bound
EXIT ---- JALAN A130 INTERCHANGE
A130
PERAK STATE ROAD 130

Trong
Kampung Sungai Tinggi
Pantai Remis
Future trumpet interchange with toll plaza
EXIT ---- BERUAS INTERCHANGE73Beruas
73Pantai Remis
73Parit
73Kuala Kangsar
Proposed trumpet interchange with toll plaza
EXIT ---- KINTA BARAT INTERCHANGE-- CHANGKAT KERUING-PARIT-SIPUTIH LINK

WEST
Changkat Keruing
Pantai Remis
Manjung

EAST
Siputih
Tronoh
Ipoh
Proposed cloverleaf interchange
EXIT ---- CHANGKAT CERMIN INTERCHANGE5Bota
5Tronoh
5Ipoh
Proposed trumpet interchange with toll plaza
R&R Changkat Cermin Rest and Service Area C* North bound
EXIT ---- SITIAWAN UTARA INTERCHANGE5Ayer Tawar
5Sitiawan
18Lumut
Proposed trumpet interchange with toll plaza
R&R Sitiawan Rest and Service Area C* South bound
EXIT ---- SITIAWAN INTERCHANGE5Sitiawan
18Lumut
Proposed trumpet interchange with toll plaza
Kampung Lekir toll plaza
Closed toll system
Collect ticket transit and pay a distance toll

E-- --
E-- WEST COAST EXPRESSWAY
Under Planning

EXIT ---- KAMPUNG LEKIR INTERCHANGE5Kampung LekirProposed diamond interchange
E-- 5 WEST COAST EXPRESSWAY
EXIT ---- JALAN A18 INTERCHANGE
A18
JALAN BOTA KIRI

Seberang Perak
Pasir Salak
Kompleks Sejarah Pasir Salak
Proposed half-diamond interchange
Sungai Perak bridge
E-- --
5 --
E-- 5 WEST COAST EXPRESSWAY
EXIT ---- TELUK INTAN INTERCHANGE58Teluk Intan
58Bidor
5Simpang Empat
5Hutan Melintang
5Bagan Datoh
Proposed diamond interchange
E-- WEST COAST EXPRESSWAY
Under Planning

Teluk Intan toll plaza
Closed toll system
Collect ticket transit and pay a distance toll

R&R Teluk Intan Rest and Service Area C* North bound
R&R Teluk Intan Rest and Service Area C* South bound
Hutan Melintang toll plaza
Closed toll system
Collect ticket transit and pay a distance toll

E-- WEST COAST EXPRESSWAY
Under Planning

EXIT ---- HUTAN MELINTANG INTERCHANGE5Hutan Melintang
69Selekoh
69Bagan Datoh
Proposed diamond interchange
E-- 5 WEST COAST EXPRESSWAY

Perak Darul Ridzuan
Hilir Perak district border

Sungai Bernam bridge
Perak-Selangor border

Selangor Darul Ehsan
Sabak Bernam district border

SOUTHWEST
B53
Sabak Bernam

NORTHEAST
B53
Bagan Terap
Proposed Left in/Left out
EXIT ----SABAK BERNAM INTERCHANGE
B55
Sabak Bernam
Proposed diamond interchange
NORTHWEST
B55
Sungai Air Tawar

SOUTHEAST
Jalan Angkasa
Proposed Left in/Left out
EXIT ---- SUNGAI BESAR INTERCHANGE
B53
Sungai Besar
B51
Bagan Terap
Proposed diamond interchange
SOUTHWEST
Jalan Haji Abu Samah

NORTHEAST
Jalan Pernas
Proposed Left in/Left out
EXIT ---- JALAN B44 INTERCHANGE
B44
JALAN SABAK BERNAM-HULU SELANGOR

Kuala Kubu Bharu
Tanjung Malim
Proposed half-diamond interchange
EXIT ---- SEKINCHAN INTERCHANGEBagan Sekinchan
Sekinchan
Proposed diamond interchange
SOUTHWEST
Jalan Parit Satu

NORTHEAST
Kampung Sungai Sireh
Proposed Left in/Left out
E-- 5 FEDERAL ROUTE 5

EXIT ---- TANJUNG KARANG INTERCHANGE5Tanjung Karang
5Sekinchan
Proposed interchange
E-- WEST COAST EXPRESSWAY
Under Planning

Tanjung Karang toll plaza
Closed toll system
Collect ticket transit and pay a distance toll

EXIT ---- IJOK INTERCHANGEE25 KUALA LUMPUR-KUALA SELANGOR EXPRESSWAY

WEST
5Assam Jawa
5Kuala Selangor
5Jeram

EAST
E25Ijok
E25Bestari Jaya (Batang Berjuntai)
E25Kuang
E25Rawang
E25Kuala Lumpur
Proposed trumpet interchange with toll plaza
R&R Kapar Rest and Service Area C* North bound
R&R Kapar Rest and Service Area C* South bound
EXIT ---- KAPAR INTERCHANGE
B2
Kapar
Proposed interchange with toll plaza
EXIT ---- MERU EXITE-- BUKIT RAJA FLYOVER (BELOW FLYOVER)

SOUTH
Bukit Raja
Klang
Shah Alam
Kuala Lumpur
Port Klang
Pulau Indah
Entry to Taiping only
Exit from Taiping only
Proposed exit
Bukit Raja Flyover
Bukit Raja Flyover
Bukit Raja Flyover
E-- -- Bukit Raja Flyover
Railway crossing bridge
E-- -- Bukit Raja Flyover
Sungai Klang bridge
Bukit Raja Flyover
EXIT ---- SUNGAI RASAU EXITE-- BUKIT RAJA FLYOVER (BELOW FLYOVER)

NORTH
Bukit Raja
Klang
Shah Alam
Kuala Lumpur
Port Klang
Pulau Indah
Entry to Banting only
Exit from Banting only
Proposed exit
EXIT ---- SRI ANDALAS INTERCHANGE
B12
JALAN BUKIT KEMUNING

Sri Andalas
Kemuning
Bandar Bukit Tinggi
Shah Alam
Alam Impian
Proposed interchange with toll plaza
EXIT ---- KEBUN WEST INTERCHANGEE5SHAH ALAM EXPRESSWAY

Kebun
Pulau Indah
Shah Alam
Subang Jaya
Cheras
Kuala Lumpur
Proposed interchange with toll plaza
R&R Tanjung Dua Belas Rest and Service Area C* North bound
R&R Tanjung Dua Belas Rest and Service Area C* South bound
EXIT ---- TANJUNG DUA BELAS INTERCHANGEE26 SOUTH KLANG VALLEY EXPRESSWAY

WEST
E26 Pulau Indah
5 Teluk Panglima Garang

EAST
E26 Putrajaya
E26 Cyberjaya
E26 Puchong
Proposed interchange with toll plaza
Banting toll plaza
Closed toll system
Collect ticket transit and pay a distance toll

E-- 0
E-- WEST COAST EXPRESSWAY
Start/End of expressway
Under planning

EXIT ---- BANTING INTERCHANGE
B18
Banting
B18
Dengkil
B20
Kuala Lumpur International Airport
Proposed T-Junction

Changkat Keruing-Parit-Siputih Link

KmExitInterchangeToRemarks
EXIT ---- CHANGKAT KERUING JUNCTION
A12
Changkat Keruing
60Pantai Remis
A179
Manjung
Proposed T-junction
E-- WEST COAST EXPRESSWAY
Start/End of expressway
Under Planning

Changkat Keruing toll plaza
Closed toll system
Collect ticket transit and pay a distance toll
EXIT ---- KINTA BARAT INTERCHANGE-- MAIN LINK

NORTH
Changkat Jering
Beruas
Kuala Kangsar
Georgetown
Butterworth
Alor Setar
Bukit Kayu Hitam
Kangar

SOUTH
Ayer Tawar
Lumut
Sitiawan
Teluk Intan
Sabak Bernam
Kuala Selangor
Klang
Banting
Shah Alam
Subang Jaya
Kuala Lumpur
Proposed cloverleaf interchange

Sungai Perak bridge
R&R Parit Rest and Service Area C* East bound
R&R Parit Rest and Service Area C* West bound
Parit toll plaza
Closed toll system
Collect ticket transit and pay a distance toll
E-- WEST COAST EXPRESSWAY
Under Planning

EXIT ---- PARIT JUNCTION73 JALAN SIPUTIH-BATU HAMPAR

Parit
Batu Hampar
Proposed T-junction
E-- 73 WEST COAST EXPRESSWAY

E-- --
73 --
E-- 73 WEST COAST EXPRESSWAY
Start/End of expressway
Under Planning

EXIT ---- SIPUTIH INTERCHANGEE19 IPOH-LUMUT EXPRESSWAY

NORTH

Pusing
Menglembu
Jelapang
Ipoh

SOUTH
Siputih
Tronoh
Bandar Seri Iskandar
Lumut
Diamond interchange
A108
Batu Gajah Bypass
Start/End of highway

A108
BATU GAJAH BYPASS

EAST
Batu Gajah
Lahat
Gopeng

Bukit Raja Flyover (Below Flyover)

KmExitInterchangeToRemarks
EXIT ---- MERU EXITE-- MAIN LINK

NORTH
Kuala Selangor
Teluk Intan
Lumut
Ipoh
Changkat Jering
Taiping
Entry from Taiping only
Exit to Taiping only
Proposed exit
Meru toll plaza
Closed toll system
Collect ticket transit and pay a distance toll

E-- WEST COAST EXPRESSWAY
Under Planning

E-- E30 WEST COAST EXPRESSWAY

EXIT ----MERU INTERCHANGE E30 NEW NORTH KLANG STRAITS BYPASS

WEST
Northport
Bandar Sultan Suleiman
Tanjung Harapan
3217 Meru
3217 Bestari Jaya (Batang Berjuntai)
3217 Puncak Alam
3217 Setia Alam
Proposed trumpet interchange
E-- E30 WEST COAST EXPRESSWAY

EXIT ----BUKIT RAJA NORTH INTERCHANGE 20 NORTH KLANG STRAITS BYPASS

WEST
BUKIT RAJA TOLL PLAZA
3217 Meru
20 Kampung Batu Belah
Opened toll systems
Pay toll
From/To Sungai Rasau only
E-- E30 20 WEST COAST EXPRESSWAY

EXIT ----BUKIT RAJA INTERCHANGENORTHEAST
PERSIARAN WAJA
Bukit Raja Industrial Area

EAST
E1 AH2 AH2 NEW KLANG VALLEY EXPRESSWAY
E1 AH2 AH2 Ipoh
E1 AH2 AH2 Damansara
E1 AH2 AH2 Kuala Lumpur
E6 AH2 AH2 Kuala Lumpur International Airport (KLIA)
E2 AH2 AH2 Johor Bahru
E2 AH2 AH2 Singapore
Trumpet interchange with a ramp towards northeast
E-- E30 20 WEST COAST EXPRESSWAY
E-- 2 WEST COAST EXPRESSWAY

EXIT ---- SUNGAI RASAU INTERCHANGE2FEDERAL HIGHWAY
WEST
Klang
Port Klang

EAST
Shah Alam
Subang Jaya
Petaling Jaya
Kuala Lumpur
Diamond interchange
Proposed cloverleaf interchange
EXIT ---- JALAN BATU TIGA LAMA INTERCHANGEKlang
Shah Alam
T-Junction
Proposed diamond interchange
E-- 2 WEST COAST EXPRESSWAY

E-- WEST COAST EXPRESSWAY
Under Planning

Railway crossing bridge
Sungai Klang bridge
Sungai Rasau toll plaza
Closed toll system
Collect ticket transit and pay a distance toll

EXIT ---- SUNGAI RASAU EXITE-- MAIN LINK

SOUTH
Kebun
Teluk Panglima Garang
Kajang
Pulau Indah
Banting
Entry from Banting only
Exit to Banting only
Proposed exit

References

  1. Rupinder Singh (2008-07-30). "Europlus plans RM3b bond sale to fund road project". Business Times. 
  2. Jagdev Singh Sidhu and Fintan Ng (2008-11-13). "Govt may call new tender for RM3.2bil West Coast Expressway". The Star. 
  3. Hamsawi, Roziana. "Europlus bags RM7.07b highway job". Business Times Malaysia. Retrieved 27 January 2012. 

External links

This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.