Wealden Line
Wealden Line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Taking its name from its route through the chalk hills of the North and South Downs of the Weald, England, the Wealden Line[1] is a partly abandoned double track railway line in East Sussex and Kent that connected Lewes with Tunbridge Wells, a distance of 25.25 miles (40.64 km).
The line is essentially composed of three sections: in the south, from Lewes to Uckfield closed on 4 May 1969; in the north, from Eridge to Tunbridge Wells West closed on 6 July 1985; in between, from Uckfield to Eridge remains open as part of the Oxted Line.
The northern section has partly re-opened under the auspices of the Spa Valley Railway, whilst the Lavender Line has revived Isfield Station on the southern section with about one mile of track. There has been a concerted campaign since 1986 led by the Wealden Line Campaign to have the whole line re-opened to passengers, but a 2008 study concluded that it would be "economically unviable".[2]
History
Authorisation
Authorisation for the construction of a line from Brighton to Hastings via Lewes was obtained by the Brighton, Uckfield & Tunbridge Wells Railway in 1844, sponsored by the London, Brighton and South Coast Railway (LBSCR), with the passing of the Brighton, Lewes and Hastings Railway Act (7 & 8 Vict. c. xci.). However, no works were commenced and another company, the Lewes and Uckfield Railway Company, was incorporated and secured on 27 July 1856 the passing of an Act to construct a line covering the 7.5 miles (12.1 km) to Uckfield from a point 1.5 miles (2.4 km) north of Lewes to be known as Uckfield Junction, on the LBSCR's Brighton to Hastings line.[3]
Attracted by the prospect of extra patronage on its coastal line, with which Lewes had been linked in 1846, the LBSCR supported the company's proposals and a connection linking Lewes to Uckfield was opened on 11 October 1858 to goods, with passengers one week later. The line, much of it through low-lying meadows, was easy to build and required only three minor cuttings and a number of bridges including one over the Ouse Navigation.[4] The initial service consisted of five trains each way on weekdays and three on Sundays. A four-horse coach service ran between Tunbridge Wells and Uckfield.[3]
Realignment
The LBSCR absorbed the Lewes and Uckfield Railway Company in 1864 and in the same year obtained authorisation to build a new line 3 miles (4.8 km) long running almost parallel with the East Coastway Line, which enabled the line from Uckfield to obtain independent access to Lewes without passing through the Lewes Tunnel. This struck out at a right angle from the Uckfield line about a quarter of a mile east of Hamsey, and approached Lewes from a northerly direction. Designed by the LBSCR's Chief Engineer Frederick Banister, it was more heavily engineered requiring embankments and bridges before joining the Brighton to Hastings line east of Lewes station. It enabled trains to be heading in the direction for Brighton, and obviated the need for locomotives to be turned. This section opened on 1 October 1868, part of the original connection to Uckfield Junction closing as a consequence.[5]
Extension to Tunbridge Wells West
The Lewes-Uckfield line was extended north by Banister to Eridge and Tunbridge Wells in 1868, ostensibly to counter a threat by the London, Chatham and Dover Railway, which had proposed a line from Beckenham to Brighton. The rights to construct this line had been granted to the Brighton, Uckfield & Tunbridge Wells Railway in 1861, but were purchased by the LBSCR before completion.[6]
Construction had already commenced in 1863 on the single track from Tunbridge Wells West to the new Groombridge Junction, and this was opened on 1 October 1866. The completion of the line south to Uckfield had to wait until 3 August 1868 due to the major structural work involved. Most notably, Banister had to oversee the construction of Rotherfield (later Crowborough) Tunnel (1,022 yards (935 m)) beneath the ridge of the Wealden Heights, and the Sleeches and Greenhurst viaducts between Crowborough and Buxted.[7] The LBSCR's desire to block any possible approach to Brighton even if this meant routing the line through areas with little traffic potential is shown by the provision of only three stations in the 12.25 miles (19.71 km) between Uckfield and Groombridge.[8]
The Sussex Advertiser reported on 5 August 1868 that the first train departed the LBSCR's station at Tunbridge Wells at 6.04 am for Uckfield, Lewes and Brighton with approximately 40 persons having booked tickets.[7]
Doubling and non-electrification
A single line link to the South Eastern Railway's Tunbridge Wells station was opened to passengers in 1876. The line from Uckfield was double tracked in 1894 and the completion of the Withyham spur between Ashurst and Birchden Junction enabled London services to run through to Uckfield or down the Cuckoo Line without reversing at Groombridge. However, little use was made until 1914.[9] The spur completed what was called the Outer Circle line, which provided an alternative route between Brighton and London via Oxted. The line was also the only subsidiary cross-country double line in East Sussex and, as it did not figure in Southern Railway's electrification programme in the 1930s, it was the last steam-operated line in the area.[10]
Route of the line
The line left Lewes immediately to the east of the station, curving sharply north for approximately 200 yards (180 m) on a short 1:60 gradient, crossing a girder bridge over goods lines and a second bridge over Cliffe High Street. Continuing on an embankment, Lewes Viaduct carried the line over the River Ouse. The river and its tributaries were crossed a further seven times before the line reached Uckfield. The line then turned north-west east of Hamsey village and followed the valley of the river, passing the signalbox at Culver Junction (3.25 miles (5.23 km)) where the line to Horsted Keynes and East Grinstead (now the Bluebell Railway) branched off, and rose gently to Barcombe Mills (3.75 miles (6.04 km)), originally Barcombe. This station was once popular with anglers, who descended in large numbers on the nearby River Ouse during bank holidays.[7]
The line continued to Isfield (5.75 miles (9.25 km)) before reaching Uckfield (8.5 miles (13.7 km)). The LBSCR had once planned to construct a further line through Uckfield, the Ouse Valley Railway, which would have connected Balcombe with Hailsham. The plan was abandoned in 1868 due to a lack of funds.[11]
Departing Uckfield, the line continues to Buxted (10¾ miles) and then passes over Greenhurst Viaduct (10 brick arches, 185 yards (169 m) (11.75 miles (18.91 km)), followed by Sleeches Viaduct (11 brick arches, 183 yards (167 m)) one mile further on. The line rises sharply on a 1:75 gradient and enters Crowborough Tunnel, which took its present name on 1 May 1897. Reaching Crowborough (Rotherfield until 1880, Crowborough until 1897, then Crowborough & Jarvis Brook) (15.25 miles (24.54 km)), the line reaches its highest point, more than 300 ft above sea level. Descending on a 1:75 gradient, it reaches Redgate Mill Junction (17.75 miles (28.57 km)) and then Eridge (19.25 miles (30.98 km)). At Birchden Junction (20 miles (32 km)), it heads east passing Groombridge Junction (20.75 miles (33.39 km)) and Groombridge (21.25 miles (34.20 km)), rising gradually to Tunbridge Wells West (25.25 miles (40.64 km)).[11]
The line's heyday
The line probably enjoyed its best and most popular period in the 1930s when regular services enabled passengers to travel from Brighton to Tonbridge, changing at Eridge for services from Eastbourne, with direct trains to London Bridge and London Victoria via East Croydon. There was also a daily through service linking with Brighton, Maidstone and Chatham in the east and Redhill and Reading in the west.[12]
Reduction of services was necessary during the Second World War, but many extras were run, including special non-stop "workmen's trains" which operated between London, Crowborough and Jarvis Brook and Mayfield.[13]
After the war passenger numbers were still rising, tempted by the frequent services and competitive prices. Even in 1969, travelling by rail was cheaper than going by bus: a return rail ticket from Barcombe Mills to Brighton cost 2 shillings, whilst the bus fare was 11d more expensive.[14]
Decline
In 1956 the British Railways, Southern Region moved to replace the complicated and inconsistent timetable with a regular hourly service, with additional trains at peak hours. Diesel-electric units appeared on the line in 1962, running to the steam timetable. The through service linking the Medway Towns to Brighton via Maidstone and Tonbridge was reduced to a Tonbridge to Brighton service.[9]
In 1964 a new timetable made travelling difficult by imposing long waits for connections: this policy of closure by stealth was a ploy to reduce passengers as British Railways was keen to close the section from Hurst Green to Lewes.[13]
In its last years of operation, the line saw an hourly off-peak service on weekdays, two-hourly on Sundays from Oxted to Lewes. During rush hours, the service was supplemented by trains from Victoria to Brighton via Hurst Green.
On Sunday, 23 February 1969, the last day of operation, the last trains left Lewes and Uckfield at 20.46 and 20.42 respectively. There was little public interest and no organised demonstrations took place to mark the occasion.
Closure
Uckfield – Lewes
Lewes Relief Road
The seeds of the Lewes-Uckfield closure were sown in 1964 when Stage One of the "Lewes Relief Road", to ease congestion in Lewes, was approved by the Conservative Minister of Transport Ernest Marples with a 75% grant towards the £350,000 costs.[15] This involved the construction of the Phoenix Causeway bridge to Cliffe High Street, the path of which was blocked by the embankment carrying the Lewes to Uckfield line. Were the railway to remain open, another road bridge or level crossing would be required at a cost of £135,000; East Sussex County Council was also against bridging the line on the grounds of "design and amenity".
To facilitate the road scheme, the British Railways Board (BRB) applied to Parliament for authorisation to re-route the line to Lewes via the alignment which had been abandoned in 1868, the "Hamsey Loop". Approval was granted by section 4 of the British Railways Act 1966 which permitted:
A railway (1,586 yards in length) wholly in the parish of Hamsey in the rural district of Chailey commencing by a junction with the railway between Lewes and Cooksbridge at a point 365 yards south of Hamsey level crossing and terminating by a junction with the railway between Lewes and Eridge at a point 425 yards north-east of the bridge carrying last-mentioned railway over the river Ouse.[16]
The new route would cost £95,000 to construct, and a request for funding was submitted to Parliament in 1966. This was turned down and the strategic function of the Uckfield line as a link to the south coast was effectively lost. BRB saw little further use for the line and applied for its abandonment.[1]
BRB 1966 Network for Development Plans
It was in 1966 that the Network for Development Plans were issued by Barbara Castle, the Labour Minister of Transport, following a study. Lines that were remunerative, such as the main trunk routes and some secondary lines, would be developed. Those that failed to meet the financial criterion but served a social need were to be retained and subsidised under the 1968 Transport Act. The problem would be for lines that were not in the above categories, which could be candidates for closure as they did not form part of the basic railway network. The Hurst Green to Lewes line was one of those that fell into this category. It was a line that carried considerable traffic, and perhaps made a small profit, but it did not meet the Government's social, economic and commercial criteria for retention.
Closure announcement
In February 1966, BRB gave notice to Castle under Section 54 of the Transport Act 1962 of its intention to close the line from Hurst Green junction to Lewes. Detailed memoranda were presented relating to the availability of alternative public transport, and statistics as to the usage of the line. The section proposed for closure had figured in the first Beeching Report as an 'unremunerative line', one earning less than £5,000 per annum in revenue.
Pursuant to Section 56 of the Act, the Minister agreed to publication of the Notice for Closure, which was published in September 1966, followed in December by a notice inviting objections. East Sussex County Council responded in February 1967 with a memorandum pointing out that closure would affect an area in which the population was likely to almost double by 1981.
Public enquiry
The number of objections received was almost 3,000 and triggered the requirement under the Transport Act 1962 to hold a public enquiry, at which the merits of the proposal would be examined by the South Eastern Transport Users' Consultative Committee (TUCC). This was held in April 1967.
At the enquiry objectors against closure successfully employed, for the first time, the Ministry of Transport's own cost-benefit analysis, by which the viability of new motorways was measured by calculating the "income" of the road (i.e. its benefit to users and the rest of the network in terms of saved time, fuel etc.) less the costs of its construction and maintenance, to show that the closure of the line would result in 712,000 wasted travelling hours at a cost of around £570,000 per annum.[17] This figure was in contrast to the loss of £276,000 that British Railways was claiming the railway line was losing.
The TUCC presented its report to Castle in June 1967 and recommended against closure of the line, pointing out the "very severe hardship" which would be suffered by those who used it to travel to London. According to the report, "these hardships could not be alleviated other than by retaining the lines proposed to be closed...This arises not from lack of alternative bus services, existing or proposed, but from the inherent advantages of the railway to those who use it."
Reconsideration by the Minister
The TUCC report prompted the Minister to revisit her decision and she met the BRB to determine whether alternatives existed to the closure of the entire section. They examined whether the necessary savings could be made by operating on a single track, rationalising the service or keeping the line open with the exception of the Lewes to Uckfield connection. The conclusion was reached that although a complete closure would involve "substantial inconvenience" rather than "outright hardship", this was outweighed by the high cost of retaining the service, including the reconstruction of the Hamsey Loop.
Following Castle's departure from office on 6 April 1968, her successor, Richard Marsh, re-examined the proposed closure in the light of the Government's new policy for the organisation and financing of public transport in the London area set out in the July 1968 White Paper on Transport for London (Cmd. 3686), which proposed that London commuter area services would be jointly managed as a network by the BRB and the Greater London Council. Under the proposals, no subsidy would be paid by the Minister to BRB where a rail closure was refused: the loss would be taken into consideration when fixing financial objectives and levels of service.
In consultation with the BRB, Marsh decided that the section from Hurst Green junction to Uckfield, and Eridge to Tunbridge Wells, was within the London commuter area and could be kept open. However, the line south of Uckfield would close provided that five additional bus services from Lewes and two from Uckfield were provided, together with an extra school bus from Lewes in the afternoon.[18] As Marsh explained in a letter to BRB dated 16 August 1968, the "hardship" caused by the closure of the line north could be alleviated by the provision of buses. He invited the BRB to apply for an "unremunerative railway grant" for the rest of the line, a new subsidy which would shortly be introduced by Section 39 of the Transport Act 1968.[19]
An unremunerative railway grant was awarded and the Minister formally refused consent to close the section from Hurst Green junction on 1 January 1969, whilst authorising closure of the 10 miles between Uckfield and Lewes and the section between Ashurst Junction and Groombridge Junction.
Extra bus services
Southdown Motors operated three bus services at the time: no. 19 between Newick and Lewes via Barcombe Cross, and nos. 119 and 122 between Lewes and Uckfield via the A26 with a stop at Barcombe Lane. As a condition of the Minister's consent to closure, additional bus services were laid on from August 1968. No. 122 additionally called at Isfield Station and provided an hourly service to and from Uckfield, but no. 119 departed Uckfield two minutes before the incoming rail service arrived. Barcombe Mills and Isfield stations remained open to sell tickets. However, as the buses were unable to negotiate the narrow winding road to Barcombe Mills, they stopped one mile short of the station: BRB laid on taxis to ferry passengers to the bus stop, but passengers first had to walk to the station to buy their tickets.[20]
The bus company applied for licences to operate the extra services beyond the closure of the line, and their applications were referred to the South East Area Traffic Commissioners whose approval for new bus services was required under the Road Traffic Act 1930.
In the meantime, BRB announced that the last day of service between Uckfield and Lewes would be 6 January 1969 and issued a revised timetable showing the service to Lewes as withdrawn subject to the approval for the bus services. On 11 November 1968, it informed the Ministry that the new timetable would be introduced regardless of the Commissioners' decision.
A public enquiry was held on 27–28 November 1968 and 21 January 1969 at Lewes Town Hall and was chaired by Major General A.J.F. Emslie. The Commissioners were presented with evidence that those currently using the line would, instead of using the new bus services, switch to cars and motorcycles, thereby adding to the congestion problems at Uckfield.[21] It was also suggested that British Rail had drawn up a timetable which was deliberately aimed at showing a loss on the line.[22] Major J.H. Pickering, a member of East Sussex County Council's Roads and Bridges Committee attending the meeting in his personal capacity made the point that "the Minister had ignored the undisputed and rapid growth of population in the area affected by the proposed bus service", the population having increased by 5,000 in three years and was expected to reach 10,000 in the following five years. Crowborough was also expanding at a similar rate.
The grant of new licences was rejected by the Commissioners on the basis of: (i) the lack of services to Barcombe Mills station – passengers were obliged to walk one mile to the bus stop, (ii) the poor off-peak train/bus connections at Uckfield and (iii) traffic congestion at peak times in Tonbridge and Lewes which had a serious effect on bus timings at Uckfield.[23]
The refusal prompted BRB to review its closure plans. Its timetabling announcements had been criticised by the Commissioners as giving the impression that a decision on the line's future had been taken before their enquiry was over. The Commissioners' concerns were nevertheless met, and authorisation for the bus services was given on 31 March 1969. The last day of operation of the Uckfield – Lewes section would be 6 May 1969.[24]
Lewes Viaduct
Another element in the closure decision was the condition of Lewes Viaduct. The Ministry of Transport had been advised in 1964 by its Divisional Road Engineer that the condition of the viaduct would entail high maintenance costs in the near future. In June 1965, the Engineer reported again that the bridges and viaduct on the line between Barcombe Mills and Lewes were in need of expensive repairs. A speed limit of 10 mph was introduced on the viaduct in September 1967. In March 1968, BRB informed the Ministry that unless the section of line between Lewes and the start of the Hamsey Loop could be eliminated by the end of the year, either by rebuilding the Hamsey Loop or by closing the line, emergency remedial work would be required.[24]
On 13 December 1968, BRB's engineers held a meeting at the viaduct. On 16 December, BRB announced that, for safety reasons and as a short-term measure, only the down line could be used by a shuttle service and a revised timetable was introduced to reflect this. On 23 February 1969, this service ceased and was replaced by an emergency bus service.[24]
Post-closure
Within weeks of the line closing, an embankment carrying the line was cut through in preparation of the first stage of the Lewes Relief Road.[25] The remaining bridges from Lewes station to Cliffe High Street and the viaduct over the River Ouse were also demolished. Construction of the Phoenix Causeway was completed in summer 1969, but stages two and three of the Lewes Relief Road project were scrapped; the Council chose instead to link up with the town's new bypass by building Cuilfail Tunnel, which opened in November 1980.[26] A 2001 report by the Environment Agency noted the detrimental effect of the Phoenix Causeway on the town by blocking the floodplain, contributing greatly to the floods of October 2000.[27] As the bypass cut across the railway alignment, the Council's County Engineer gave an undertaking on 11 December 1978 to "pay for the cost of a new bridge and other works over the Uckfield By-pass should the Lewes-Uckfield Railway Line ever be re-opened."[25]
John Peyton, the Conservative Minister for Transport Industries, confirmed on 5 February 1973 that the powers granted by the British Railways Act 1966 in respect of the Hamsey Loop had expired on 31 December 1972.[28] East Sussex County Council agreed nevertheless to safeguard the trackbed against development.[15] However, the Council declined British Rail's offer to acquire the alignment for £1 in the 1970s and much of the trackbed was consequently disposed of by British Rail in the 1980s for a few thousand pounds.[25]
In 1991, Uckfield station was resited on the eastern side of the level crossing over the High Street. The track across the road were removed by East Sussex County Council despite concerns that this action would create an obstacle to reopening the line in terms of the loss of any grandfather rights.[25]
Eridge to Tunbridge Wells
Following a lack of investment for decades, by the early 1980s the track and signalling between Eridge and Tunbridge Wells needed to be replaced. British Rail, at the time carrying out an upgrade of the Tonbridge to Hastings Line, decided that the costs of keeping the line from Eridge open and undertaking the resignalling and relaying Grove Junction works did not justify the outlay. It therefore announced the closure of the line (including Groombridge and Tunbridge Wells West stations) from 16 May 1983, subsequently postponed following objections. The Secretary of State for Transport approed the decision with effect for passenger trains from 6 July 1985, although empty stock trains continued to use the section from Tunbridge Wells West to Birchden Junction until 10 August when the depot at West station closed.[29] Since 1971, the line had been served by an hourly off-peak shuttle service between Tonbridge and Eridge with extra services during Monday to Friday peak hours.
Revival
Lavender Line
In 1983, Isfield station and a length of trackbed were purchased by an enthusiast who planned to restore and re-open the station. The project could not be finished and the property passed in 1991 to the Lavender Line preservation society, which took over and beautifully restored the station. The society has also restored about one mile of track to the north of Isfield.[30]
Spa Valley Railway
The Tunbridge Wells and Eridge Railway Preservation Society was formed shortly after the closure of the section of the line between Tunbridge Wells and Eridge with the intention to re-open the connection. It purchased the line and trains were again running by 1996 on The Spa Valley Railway. The line extends for four miles from Tunbridge Wells West to Birchden Junction, and another mile to Eridge (alongside the National Rail line) opened on 25 March 2011.
Wealden Line Campaign
Launched in 1986, the Wealden Line Campaign is seeking the full restoration of services between Lewes and Tunbridge Wells, with eventual electrification. The scheme has received the support of the MPs for Lewes and Wealden, Norman Baker and Charles Hendry, who have both made repeated calls in the House of Commons for the re-opening of the line.
Uckfield Line Rail Extensions group
In June 2009, following a meeting of the Uckfield Railway Line Parishes Committee, an informal association of members from local parishes who meet monthly to press for the line's reinstatement, it was decided to set up a new organisation comprising elected representatives from town and parish councils in Crowborough, Lewes and Buxted.[31] Named the Uckfield Line Rail Extensions Group (Ulreg), it will seek to apply political pressure for the reinstatement of the line.[32]
Calls for reopening
Post-closure
The merits of the Uckfield-Lewes closure were debated on several occasions in Parliament following closure. In particular, it was argued that the line would have provided a valuable alternative route to the Brighton Main Line when that line was out of action, as was the case on 16 December 1972 when a collision between two passenger trains at Copyhold Junction closed the line for over a month. Lord Teviot referred to this incident when calling for the reinstatement of the line in the House of Lords on 20 May 1974. It was estimated that costs of reinstatement would be in the region of £2 million, together with an additional revenue subsidy of £170,000 per year.[33]
1980s and 1990s
In February 1987, Network SouthEast agreed to contribute £1.5 million to reinstate the Lewes to Uckfield Line, a quarter of its projected cost. The scheme floundered in the face of a lack of funding from other sources, both the Kent County Council and East Sussex County Council proving to be "uncooperative" on this score.[34]
In 1996, a feasibility study was commissioned by the Kent County Council into the re-opening of the Tunbridge Wells to Eridge section of the line. The report, prepared by Mott Macdonald, found in favour of reopening the line, concluding that "at a reinstatement cost of £20–25 million such a long-term reinstatement facility (which might substitute for more expensive road infrastructure elsewhere) might be considered a relatively cheap option".[35] The project made no progress.
Connex
Hopes for reopening were raised in 2000 when Connex included the reinstatement of the line in its ultimately unsuccessful bid for the South Central franchise, and later by Railtrack, which not only looked at reopening, but also the electrification of the whole route.[1] In 2002, the Department of Transport on the advice of the Strategic Rail Authority stated that the costs of electrification from Uckfield to Hurst Green "far outweigh the benefits", but the situation would be kept under review.[36]
2008 feasibility study
Central Rail Corridor Board
To take the case for reinstatement forward, a "Central Rail Corridor Board" was set up in 2004, with members from regional, county and district levels, local MPs and Southern. The Board, led by East Sussex County Council, oversaw the development of initiatives to explore the feasibility of reinstatement and provide guidance on the political, planning and transport policy framework. A free scoping study was prepared by a consortium of transport and engineering consultants, who recommended in March 2005 that there were sufficient grounds for proceeding to a full feasibility study at a cost of £150,000, the funding for which was provided by numerous local authorities in the area.[37]
On 14 June 2007, members of the Campaign met the Parliamentary Under-Secretary of State for Transport, Tom Harris, who agreed to consider the results of the feasibility study.[38] As Harris later revealed to Parliament, the Campaign members proposed a public-private partnership, which "would mean, in essence, that the Department for Transport would not have to put its hand in its pocket for the capital costs or for revenue costs following resumption of services on the line."[39] The financial viability of the proposals would be tested by the feasibility study, and the Minister indicated that some investment would have to be forthcoming from the Campaign.
Network Rail also pledged to consider the results of the study and "investigate all possible commercial avenues for the line reopening". The study, which is to be overseen by Network Rail, was due to commence in September, but was delayed until January 2008; the costs of the report, which are estimated to be in the region of £130,000 to £140,000, will be met by the Central Rail Corridor Board.[40]
In March 2008 the Wealden Line Campaign launched "Wealdenlink – Capacity Solutions for Sussex, Kent, Surrey and London", a presentation outlining the benefits of reinstatement which aims to give new impetus to the project at a critical moment.[41]
Final report
The reinstatement feasibility study was scheduled for publication on 23 May 2008,[42] but was eventually released in summary form on 23 July accompanied by a press release by East Sussex County Council[2] It said that whilst reinstatement is technically feasible, it would not be economically viable.[43]
The full report disclosed that the minimum cost of reinstatement would be £141.0m for single track. Intermediate stations at Isfield and Barcombe would add £7.4m, and double tracking would add £25.5m, both options together would add £38.8m. It was estimated that between 1,500 to 2,000 trips per day (450,000 to 620,000 trips per annum) would be generated by a variety of routes including London-Uckfield-Eastbourne and London-Uckfield-Newhaven fast services. The majority of trips would, however, be to existing stations on the Uckfield Line and the new routes would encourage only 2% growth for existing lines due to longer journey time to the south coast compared with the Brighton Main Line. The benefit of the reinstated line as a diversionary route was also judged negligible due to the low occurrence of total closures on the Brighton line.
The study concluded that all six routes showed a negative net present value and therefore had a poor business case, but four of the service options would generate a small operating profit. In particular, a service to Lewes without intermediate stops at Barcombe and Isfield would bring in £3.71m annually at a cost of £2.28m, giving an operating cost ration of 1.63, although this excludes any capital costs.
The report explained that the poor business case was due to the "low level of demand for the reopened route", and increased car ownership since the 1960s. In order to prove a business case there needs to be "a significant increase in the size of the population along the line and/or a fundamental shift in the travelling population of the existing population,"[44] although this has been put down to negative influences on the East Sussex County Council Rail board by Highways department officials and thus led to accusations of bias.[45]
The Kilbride group
In autumn 2004, the Kilbride Group, a private company specialising in combining residential development with transport-infrastructure improvements, expressed interest in restoring services. The company, already involved in a similar project to reconnect Bere Alston and Okehampton on the West of England Main Line, believed that the cost of reinstatement could be met by imposing a levy on each house built based on the housing targets for the area (around 4,000 houses). The costs of reinstatement were estimated at £50m, significantly different from the results from the Network Rail analysis. Kilbride's offer was declined by East Sussex County Council.[46]
In November 2008, following the failure to establish a sound business case for reinstatement, Kilbride met members of Uckfield Town Council to confirm that the link could be financed by revenue from the housing projects already planned for the area.[47]
2009
Crowborough, Lewes and Uckfield councils decided to undertake their own feasibility study and engaged the Jacobs transport consultancy to undertake the work.[48] The Uckfield-Lewes line was identified as a "potential link line" in the 2009 report by the Association of Train Operating Companies entitled Connecting Communities: Expanding Access to the Rail Network[49]. This was reiterated in Network Rail's draft Route Utilisation Strategy for Sussex, published on 26 May 2009, which stated that the line's reinstatement would "provide potential capacity relief to the southern end of the BML."[50]
2013
On 9 May 2013, the Secretary of State for Transport, Patrick McLoughlin announced that the Department for Transport had asked Network Rail to explore the possible re-opening of the Lewes to Uckfield route.[51] According to the Wealden Line Campaign, Network Rail is buying back the original Uckfield Station land from BRB (Residuary) Limited in order to safeguard the original rail route from Uckfield to Brighton and the Coastway East Line.[52]
References
- ↑ 1.0 1.1 1.2 Broadbent, S., p. 48.
- ↑ 2.0 2.1 "Issued on behalf of the Central Rail Corridor Board: Rail study report concludes that reinstatement is not economically viable" (Press release). East Sussex County Council. 23 July 2008. Retrieved 21 August 2008.
- ↑ 3.0 3.1 Stones, H.R., p. 497.
- ↑ Course, E., pp. 73–74.
- ↑ White, H.P. (1992), p. 92.
- ↑ White, H.P. (1987), p. 50-51.
- ↑ 7.0 7.1 7.2 Stones, H.R., p. 498.
- ↑ Course, E., pp. 79–80.
- ↑ 9.0 9.1 Course, E., p. 80.
- ↑ Stones, H.R., p. 500.
- ↑ 11.0 11.1 Stones, H.R., p. 499.
- ↑ Oppitz, L., p. 30.
- ↑ 13.0 13.1 Mitchell, V. and Smith, K., p. 2.
- ↑ "Tragic miscalculation broadside at bus services enquiry". Sussex Express. 24 January 1969. Archived from the original on 11 March 2005. Retrieved 18 September 2007.
- ↑ 15.0 15.1 "Wealdenlink presentation" (PDF). March 2008. Retrieved 11 May 2008.
- ↑ "British Railways Act 1966" (PDF). Railways Archive. 1966. Retrieved 4 September 2009.
- ↑ Henshaw, D., pp. 184–185.
- ↑ "Kent-Sussex Line may qualify for a grant". The Times (UK). 23 August 1968. pp. 2, Col. A.
- ↑ "Minister's 'no' to rail closure". Evening Argus. 7 January 1969. Archived from the original on 13 December 2007. Retrieved 18 September 2007.
- ↑ Oppitz, L., p. 31.
- ↑ "British Rail slammed over line closing plans". Kent and Sussex Courier. 27 January 1969. Archived from the original on 13 December 2007. Retrieved 18 September 2007.
- ↑ "British Rail have to think again about closure date". Sussex Express. 6 December 1968. Retrieved 18 September 2007.
- ↑ Compton, Edmund (9 April 1970). "The Compton report". Parliamentary Commissioner for Administration. Archived from the original on 12 April 2005. Retrieved 4 September 2009.
- ↑ 24.0 24.1 24.2 White, H.P. (1987), p. 65.
- ↑ 25.0 25.1 25.2 25.3 "Lewes – Uckfield: A Case Unanswered" (PDF). Wealden Line Campaign. 22 June 2009. Retrieved 4 September 2009.
- ↑ Hitchin, David (4 September 2009). "Wrong tunnel". The Argus. Retrieved 4 September 2009.
- ↑ Waldron, Environment Agency (March 2001). "Flood Report" (DOC). Monthly Weather Review (Lewes District Council) 39 (10): 1519. Bibcode:1911MWRv...39.1519W. doi:10.1175/1520-0493(1911)39<1519:FR>2.0.CO;2. Retrieved 15 September 2007
- ↑ "Hansard Debates vol 850 c36W". House of Commons. 5 February 1973. Retrieved 30 May 2008.
- ↑ Catford, Nick. "Tunbridge Wells West". Subterranea Britannica. Retrieved 4 September 2009.
- ↑ Oppitz, L., p. 33-35.
- ↑ "Uckfield and Lewes railway line has a new campaign group". Kent and Sussex Courier. 18 June 2009. Retrieved 10 September 2009.
- ↑ "Minutes of the meeting of the Council held at High Hurstwood Village Hall on Tuesday 9 June 2009 at 7.30 pm". Buxted Parish Council. 9 June 2009. Retrieved 10 September 2009.
- ↑ "Hansard Debates vol 351 cc1301-12.". House of Lords. 20 May 1974. Retrieved 30 May 2008.
- ↑ Henshaw, D., p. 251.
- ↑ "Hansard Debates". House of Commons. 29 July 1998. Retrieved 18 September 2007.
- ↑ "Written Answers". House of Commons. 9 July 2002. Retrieved 17 September 2007.
- ↑ "Report on Reinstatement of the Lewes-Uckfield Line" (DOC). Lewes District Council. 30 March 2006. Retrieved 17 September 2007.
- ↑ "Fresh hope of railway reopening". BBC News. 14 June 2007. Retrieved 17 September 2007.
- ↑ "Hansard Debates, Column 134WH". House of Commons. 21 May 2008. Retrieved 4 September 2009.
- ↑ "Railway route study gets go-ahead". BBC News. 3 January 2008. Retrieved 4 September 2009.
- ↑ "Case made for reopening rail link". Sussex Express. 18 March 2008. Retrieved 18 March 2008.
- ↑ "£100m Rail Project Delayed". Kent and Sussex Courier. 30 May 2008.
- ↑ "Railway line defeat 'just a blip'". BBC News. 23 July 2008. Retrieved 23 July 2008.
- ↑ East Sussex County Council (4 August 2008). "Lewes-Uckfield rail link". Retrieved 21 August 2008.
- ↑ "Successful AGM and East Sussex Rail Board Dissolved". Wealden Line Campaign. 21 October 2008. Retrieved 4 September 2009.
- ↑ Broadbent, S., p. 48-49.
- ↑ "New hope for disused line". The Argus. 20 November 2008. Retrieved 4 September 2009.
- ↑ "Rail alliance". Railfuture. 9 April 2009. Retrieved 4 September 2009.
- ↑ "Connecting Communities" (pdf). Association of Train Operating Companies. June 2009. Retrieved 3 October 2010.
- ↑ "Sussex Route Utilisation Strategy Draft for Consultation". Network Rail. 26 May 2009. p. 154. Retrieved 4 September 2009.
- ↑ "Lewes-Uckfield rail route to be re-examined". Department for Transport. 9 May 2013. Retrieved 10 May 2013.
- ↑ http://www.wealdenline.org.uk/news-affecting-re-opening.html
Bibliography
- Broadbent, Steve (2008). "The Battle of Wealden". Rail (599 (27 August – 9 September)): 46–51.
- Course, Edwin (1974). The Railways of Southern England: Secondary and Branch Lines. London: B.T. Batsford Ltd. ISBN 0-7134-2835-X.
- Henshaw, David (1994). The Great Railway Conspiracy. Hawes, North Yorkshire: Leading Edge. ISBN [[Special:BookSources/0-948135-48-0 |0-948135-48-0 [[Category:Articles with invalid ISBNs]]]] Check
|isbn=
value (help). - Mitchell, Vic; Smith, Keith (1986). Branch Lines to Tunbridge Wells from Oxted, Lewes and Polegate. Midhurst, West Sussex: Middleton Press. ISBN 978-0-906520-32-1.
- Oppitz, Leslie (2001). Lost Railways of Sussex (Lost Railways). Newbury, Berkshire: Countryside Books. ISBN 978-1-85306-697-9.
- Stones, H.R. (1969). "Farewell to the Lewes & Uckfield". Railway Magazine 115 (821 (Sept.)): 496–500.
- White, H.P. (1992). A Regional History of the Railways of Great Britain: Southern England (Volume 2). Nairn, Scotland: David St John Thomas. ISBN 978-0-946537-77-8.
- White, H.P. (1987). Forgotten Railways: South-East England (Forgotten Railways Series). Newton Abbot, Devon: David & Charles. ISBN 978-0-946537-37-2.
External links
Source materials
- BRB Network for Development Plans 1967 PDF (501 KiB)
Stations on the line
- Barcombe Mills railway station on Subterranea Britannica
- Isfield railway station on Subterranea Britannica
- Uckfield railway station on Subterranea Britannica
- Eridge railway station on Subterranea Britannica
- Groombridge railway station on Subterranea Britannica
- High Rocks railway station on Subterranea Britannica
- Tunbridge Wells West railway station on Subterranea Britannica