Thistle oil field
The Thistle oil field is a large oil field in the Northern sector of the North Sea. The oil field is produced over the Thistle Alpha platform, located 125 nautical miles Northeast of Sumburgh, Shetland Islands and 275 nautical miles Northeast of Aberdeen, Scotland.
License P236 was awarded as part of the UKCS fourth round in 1972, and the first well on the site was drilled and completed in July 1973 when the Thistle oil field was confirmed as a commercial discovery. The oil field is estimated to have a reserve of roughly 824 million barrels of oil.[1] The nearby Deveron field, also produced over the Thistle Alpha platform, was discovered in 1972 following the successful completion of a second well on the site. A 1997 seismic re-interpretation site's estimated the reserves to be roughly 61.3 million barrels of oil.[2]
Production commenced for partners BNOC, Britoil and BP on the site in 1978. Ownership of the operations license for the site was subsequently transferred to DNO in 2003, followed by Lundin in 2004 before the demerging of Lundin’s UK assets in 2010, when EnQuest became the operator. The site is currently operated in partnership between EnQuest and BP, with EnQuest holding over 99% of the total ownership of the site.[3]
Thistle Alpha platform
The Thistle Alpha platform is a fixed installation, which consists of a 60-slot drilling and production platform.[4] It was built at the Graythorp Dry Dock, Teesside now renamed TERRC [5]
The jacket is a conventional steel tower structure approximately 183 meters tall with a base measuring 85 meters by 82 meters and weighs 31,500 tonnes with an integral Module Sub Frame (MSF), and is secured by steel piles driven 143 meters into the seabed. The Thistle Alpha platform was installed and completed in 1976.[6]
The installation comprises a steel jacket with four main legs, supporting 36 modules arranged on 3 deck levels. 28 of these modules contain the equipment and machinery, which constitute the production, utilities, drilling systems and facilities. The remaining 8 modules situated on the southeast end of the installation contain living quarters (LQ), offices, the central control room (CCR), the helideck and workshops. The platform was installed on the jacket in 1978.
Oil from the Thistle and Deveron reservoirs is recovered by platform wells. The oil is processed through a two-stage production separation system. Stabilized oil is metered and exported using the mail oil line pumps to the Brent Pipeline System. The original gas compression system has been decommissioned as a result of a small volume of gas separated from the oil being flared. Produced water is cleaned and discharged to the sea.
Oil is imported from the Dons field via an 8” pipeline, and combined with oil produced by the Thistle platform. The combined oil production is exported from the Thistle platform through a 16” pipeline through the Brent Pipeline System via the Dunlin and Cormorant platforms to the Sullom Voe Oil Terminal.
Gas is imported from the Northern Leg Gas Pipeline (NLGP) system. A portion of the imported gas is used for as fuel to provide the Thistle installation with power, with the remainder exported to the Dunlin and Northern Producer installations.
Production history
Production through the Thistle Alpha platform production system peaked at 130,000 barrels per day in the early 1980s [7] and fell to a low of about 3,750 barrels per day in 2008.[8]
EnQuest took over the field from Lundin in 2008 and commenced the Thistle Late Life Extension (LLX) strategy.[9][10] This strategy is currently delivering twice as much production in 2012 as was delivered in 2008, with the potential for more in the future.[11]
Thistle Late Life Extension
The Thistle Late Life Extension (LLX) Strategy aims to recover over 35 million barrels of oil over the next 15 years from the Thistle and Deveron oil fields, using a mixture of existing well stock and new wells. A drill rig re-activation project has been completed[12] and has successfully delivered several new wells and well renovations to date with an industry leading-safety record.[13]
The Thistle LLX strategy will also ensure that the Thistle platform will be operable to 2025 and beyond. In order to achieve this, a series of major activities have started including initiatives to provide reliable power, improve structural and topsides integrity, upgrade safety and control systems and simplify the platform oil and production and water treatment processes. These activities are scheduled to run from 2012 to 2015,[14] dependent upon receipt of the UK Government support through the Brown Field Allowance (BFA).
References
- ↑ United Kingdom Oil and Gas Fields: Commemorative Millennium Volume. 2003. ISBN 9781862390898.
- ↑ United Kingdom Oil and Gas Fields: Commemorative Millennium Volume. 2003. ISBN 9781862390898.
- ↑
- ↑ http://www.enquest.com/thistle-alpha-20121217.pdf
- ↑ harding internet - www.harding.co.uk. "Able UK Ltd - Photos". Ableuk.com. Retrieved 2013-01-09.
- ↑ "Samples". McMillan Engineers. Retrieved 2013-01-09.
- ↑ "Energy Policy - Oil futures: A comparison of global supply forecasts". ScienceDirect.com. 2010-05-14. Retrieved 2013-01-09.
- ↑ "Lundin Petroleum recommences production on Thistle". Lundin-petroleum.com. Retrieved 2013-01-09.
- ↑ "Share Fair for iPad - 1.1 / iOS". FileDir.com. Retrieved 2013-01-09.
- ↑ By Editor on 19 September 2012 (2012-09-19). "Fabricom awarded £1 million contract by EnQuest". Ogssn.com. Retrieved 2013-01-09.
- ↑ "Media - Press releases". EnQuest. Retrieved 2013-01-09.
- ↑ "P&J Energy | Log in to Energy". Pandjenergy.co.uk. Retrieved 2013-01-09.
- ↑ "P&J Energy | Enquest sets new safety record". Pandjenergy.co.uk. 2011-09-23. Retrieved 2013-01-09.
- ↑ http://www.oilandgasuk.co.uk/downloadabledocs/1058/EnQuest.pdf
Coordinates: 61°21′47″N 1°34′47″E / 61.36306°N 1.57972°E