Southern Transcon
The Transcon is one of the most heavily trafficked rail corridors in the western United States. An average of almost 90 trains daily (over 100 trains, on peak days) passed over the section between Belen and Clovis, New Mexico in 2006, each train typically 6000 to 8000 feet (1800 to 2400 meters) in length.[1]
History
The Atchison, Topeka and Santa Fe Railway completed a transcontinental railroad between Chicago and Southern California in the 1880s. The route, built in stages, was less than ideal, especially where it crossed Raton Pass and Glorieta Pass. The steep grades posed operational problems, including congestion, slow speeds, and the need for helper engines. As an interim solution, a second track, with a longer tunnel, was opened at Raton in 1908, but this simply added capacity, and the grades remained. In 1902 the Santa Fe began surveying a new cutoff that would bypass this segment entirely. Much of the route had already been constructed by subsidiaries, such as the Southern Kansas Railway, which built a branch to Amarillo, Texas in the 1880s, and the Pecos Valley and Northeastern Railway, an 1899 extension from Amarillo to Pecos via Texico, New Mexico.[2] To complete the line between Texico and a point northwest of Belen, New Mexico, the Santa Fe incorporated the Eastern Railway of New Mexico in October 1902, and began construction of the Belen Cutoff the next January. The entire line was completed on July 1, 1908, allowing through freight trains to bypass the 3-3.5% grades of the old line for the maximum grade of 1.25% (at Abo Canyon) on the new line. (Most passenger trains continued to use Raton Pass so as to serve Colorado.) The Pecos Valley and Northeastern (but not its Texas subsidiaries, because of Article X of the Texas Constitution) was consolidated into the Eastern in March 1907, and in January 1912, the property of the Eastern was conveyed to the Santa Fe.[3] To connect central Texas to this line, the Pecos and Northern Texas Railway completed the Coleman Cutoff, running southeast from Texico to the Santa Fe subsidiary Gulf, Colorado and Santa Fe Railway at Coleman, in 1914. A third line was almost completed in the 1920s and 1930s, when the Santa Fe built the majority of the planned Dodge City-Colmor Colmor Cutoff, which would provide a second bypass of Raton (but not Glorieta), but construction stopped at Farley, and the line was torn up west of Boise City in 1942.[4]
The completion of the Belen Cutoff did not end improvements to the transcontinental route. The 47-mile (76 km) Ellinor Cutoff opened in 1924, cutting through the Flint Hills from the original main line at Ellinor, Kansas southwest to El Dorado on the main line to Texas. This allowed trains bound for the Belen Cutoff to cut directly to Mulvane, bypassing Wichita to the southeast.[5] To the west, in Arizona, the Santa Fe constructed a new line between Williams and Crookton, bypassing the sharp curves and steep grades of the line via Ash Fork built by the Atlantic and Pacific Railroad in the 1880s.[3] The $19.3 million realignment opened on December 19, 1960, and the old line was abandoned west of the Phoenix connection at Ash Fork.[6] Smaller improvements included installation of centralized traffic control on the Belen Cutoff in the 1940s[7] and double track on large portions of the main line.
See also
References
- Glischinski, Steve (1997). Santa Fe Railway. Osceola, WI: Motorbooks International. ISBN 0760303800. OCLC 37567382.
- ↑ Frailey, Fred W., "Birthplace of the Transcon," Trains Magazine, April 2007.
- ↑ George C. Werner: Panhandle and Santa Fe Railway from the Handbook of Texas Online. Retrieved January 2009.
- ↑ 3.0 3.1 Interstate Commerce Commission, 127 I.C.C. 1 (1927): Atchison, Topeka and Santa Fe Railway Company
- ↑ Glischinski, pp. 18-31
- ↑ Glischinski, pp. 36-37
- ↑ Glischinski, p. 53
- ↑ Glischinski, p. 29