Roosecote Power Station

From Wikipedia, the free encyclopedia
Roosecote Power Station

Roosecote Power Station
Country England
Location Cumbria, North West England
Coordinates 54°06′18″N 3°11′16″W / 54.10499°N 3.187732°W / 54.10499; -3.187732Coordinates: 54°06′18″N 3°11′16″W / 54.10499°N 3.187732°W / 54.10499; -3.187732
Commission date 1954
Operator(s) Centrica
Power station
Primary fuel Natural gas-fired
Secondary fuel Coal-fired
grid reference SD223683

Roosecote Power Station is a gas-fired and former coal-fired power station, situated in the Roosecote district of Barrow-in-Furness in Cumbria, North West England. The gas-fired station opened in 1991 and was the first CCGT power station to supply electricity to the United Kingdom's National Grid. It was mothballed in 2012 after a proposed biomass power station was cancelled.

Coal-fired power station

The coal-fired power station began generating electricity in 1954. The station had a generating capacity of 120 megawatts (MW). The station was initially operated by the Central Electricity Authority, which became the Central Electricity Generating Board in 1957. The station closed in November 1986.[1] At the time of its closure only 60 MW of the station's capacity was in operation.[2]

CCGT power station

The first organisation to plan for a new power station on the site was Cumbria Power in 1987, formed of four engineers. They hoped to build a CCGT plant that used the steam turbines of the former plant. This idea wasn't feasible, so a new power station was chosen instead, but situated in the former turbine hall. ABB joined the planning process in April 1989, and a new company - Lakeland Power Ltd - was formed, being owned 80% by ABB and 20% by Cumbria Power. In October 1989, the North Western Electricity Board (NORWEB) signed an agreement with Lakeland Power to have a supply of electricity - the first such agreement between a UK Regional Electricity Company and a private generator. NORWEB also bought 20% of the company.

Construction started on 3 January 1990, the construction work carried out by Alfred McAlpine and Stone & Webster. The station was commissioned on 20 November 1991, although officially opened on 1 November 1991 by John Wakeham. It had been the first Independent Power Project (IPP) since the privatisation of the UK electricity industry in 1990. Roosecote station marked the start of the "Dash for Gas" which saw many more CCGTs built in the UK, as gas became an alternative to coal power. This hastened the demise of Britain's coal industry. In 1997, the newly elected Labour government placed restrictions on the number of gas-fired power stations that could be built.

Roosecote was operated by ABB, though owned by Lakeland Power. ABB then sold its 60% stake of the company to California-based Edison Mission Energy (EME), who bought the rest of the company from NORWEB in October 1999. In December 2002, EME company went into receivership, due to the financial troubles of Texas-based TXU who had bought NORWEB's supply business, and the station was temporarily shut down. On 14 May 2003, the station was bought by Centrica Energy for £24 million. Centrica proposed building a new 80MW biomass plant on the site but regulatory changes led to this being cancelled in October 2012. At the same time Centrica announced that Roosecote would be mothballed pending a final decision on the future of the site, which might include closure, redevelopment or sale as a going concern.[3]

Specification

The station is a Combined cycle gas turbine power station, fueled by gas from Centrica's Morecambe Bay field which is landed at nearby Westfield Point. The station generated electricity using one 165 MWe Alstom GT13E gas turbine, its associated alternator having a terminal voltage of 15.75 kV, rated at 210MVA, from which the exhaust gases at 520C pass through one CMI heat recovery steam generator. Steam from this powers one 63MWe steam turbine, with its alternator having a terminal voltage of 12.5 kV. The station has a thermal efficiency of 49%. The electricity generated enters the National Grid, via a transformer, at 132 kV, where it powers part of the United Utilities (former NORWEB) network. By March 2012 it was reconfigured to allow operation in the Short Term Operating Reserve market. The plant employs 33 people.

References

  1. Mr. Franks (7 November 1988). "Central Electricity Generating Board". Hansard. Retrieved 4 September 2009. 
  2. Mr. Goodlad (18 February 1987). "Power Stations". Hansard. Retrieved 4 September 2009. 
  3. "Centrica Energy withdraws from two biomass planning applications and considers future of existing gas-fired power plant at Roosecote". Centrica plc. 24 October 2012. 

External links

This article is issued from Wikipedia. The text is available under the Creative Commons Attribution/Share Alike; additional terms may apply for the media files.